CDT
Study Guide Questions With Correct Answers
/ / / / / /
Integrated
/projects /are /distinguished /by /all /of /the /following /characteristics /EXCEPT: /- /verified /answer(s)-
✔✔"Just /as /needed" /team /involvement /to /reduce /owners /pre-construction /expenses
Experienced
/owners
/may
/require /project /teams /to /utilize /integrated /project /delivery /based /upon /- /verified /answer(s)-
✔✔a. /Previous /negative /experience /with /adversarial /project /team /relationships
b. /Desire /for /reduction /in /project /claims /and /disputes
c. /Desire /to /utilize /collaboratively-produced /BIM /as /a /facilities /management /asset
d. /Expectation /of /benefit /from /innovation /stemming /from /collaborative /effort
e. /All /of /the /above
Which
/of
/the
/following /is /TRUE /concerning /application /of /integrated /project /delivery? /- /verified /answer(s)-
✔✔Team /culture /based /upon /problem /resolution /rather /than /determination /of /liability
The
/following
/are
/TRUE
,concerning /CSIs /GreenFormat /online /product /data /resource /EXCEPT /- /verified /answer(s)-
/
✔✔CSI /validates /and /certifies /information /contained /in /Green /Format
According
/to
/the
/BEES
/model,
/life /cycle /analysis /(LCA) /is /characterized /by /all /of /the /following /EXCEPT /- /verified /answer(s)-
✔✔Market /analysis /of /demand /for /sustainable /products
The
/goal
/of
/ASTM
/sustainability
/standards,
/the /EPA /Energy /Star /program, /and /the /NIST /BEES /program /is /to /- /verified /answer(s)-
✔✔Provide /a /rational /assessment /of /the /environmental /impact /of /building /products
Which
/of
/the
/following
/is
/not
/included
/in
/the
/quoted
/description
/of /benefits /that /BIM /brings /to /the /design /and /construction /process? /- /verified /answer(s)-
✔✔Automated /product /characteristic/ /specification /content /coordination
, The /goal /of /the /project /is /defined /by /the /PDPG /as /- /verified /answer(s)-
✔✔The /delivery /of /the /facility /to /the /owner
The /nationally-
recognized /"California
/AIA
/Integrated
/Project /Delivery /Guide" /redefines /the /stages /of /a /project /to /include /which /of /the /following? /-
/verified /answer(s)-✔✔a. /Conceptualization
b. /Criteria /Design
c. /Detailed /Design /
d. /Implementation /Document
e. /All /of /the /above
In
/the
/CSI
/CDT
/program,
/construction
/document /production /is /defined /as /all /of /the /following /EXCEPT /- /verified /answer(s)-
✔✔A /process /integral /to /the /design /phase /of /a /project
All /of /the /following /could /be /Articles /in /Part /1 /of /a /specification /EXCEPT /- /verified /answer(s)-
✔✔Source /Quality /Control
The /Design /phase /of /a /project /includes /all /of /the /following /EXCEPT /- /verified /answer(s)-
✔✔Feasibility /Studies
Study Guide Questions With Correct Answers
/ / / / / /
Integrated
/projects /are /distinguished /by /all /of /the /following /characteristics /EXCEPT: /- /verified /answer(s)-
✔✔"Just /as /needed" /team /involvement /to /reduce /owners /pre-construction /expenses
Experienced
/owners
/may
/require /project /teams /to /utilize /integrated /project /delivery /based /upon /- /verified /answer(s)-
✔✔a. /Previous /negative /experience /with /adversarial /project /team /relationships
b. /Desire /for /reduction /in /project /claims /and /disputes
c. /Desire /to /utilize /collaboratively-produced /BIM /as /a /facilities /management /asset
d. /Expectation /of /benefit /from /innovation /stemming /from /collaborative /effort
e. /All /of /the /above
Which
/of
/the
/following /is /TRUE /concerning /application /of /integrated /project /delivery? /- /verified /answer(s)-
✔✔Team /culture /based /upon /problem /resolution /rather /than /determination /of /liability
The
/following
/are
/TRUE
,concerning /CSIs /GreenFormat /online /product /data /resource /EXCEPT /- /verified /answer(s)-
/
✔✔CSI /validates /and /certifies /information /contained /in /Green /Format
According
/to
/the
/BEES
/model,
/life /cycle /analysis /(LCA) /is /characterized /by /all /of /the /following /EXCEPT /- /verified /answer(s)-
✔✔Market /analysis /of /demand /for /sustainable /products
The
/goal
/of
/ASTM
/sustainability
/standards,
/the /EPA /Energy /Star /program, /and /the /NIST /BEES /program /is /to /- /verified /answer(s)-
✔✔Provide /a /rational /assessment /of /the /environmental /impact /of /building /products
Which
/of
/the
/following
/is
/not
/included
/in
/the
/quoted
/description
/of /benefits /that /BIM /brings /to /the /design /and /construction /process? /- /verified /answer(s)-
✔✔Automated /product /characteristic/ /specification /content /coordination
, The /goal /of /the /project /is /defined /by /the /PDPG /as /- /verified /answer(s)-
✔✔The /delivery /of /the /facility /to /the /owner
The /nationally-
recognized /"California
/AIA
/Integrated
/Project /Delivery /Guide" /redefines /the /stages /of /a /project /to /include /which /of /the /following? /-
/verified /answer(s)-✔✔a. /Conceptualization
b. /Criteria /Design
c. /Detailed /Design /
d. /Implementation /Document
e. /All /of /the /above
In
/the
/CSI
/CDT
/program,
/construction
/document /production /is /defined /as /all /of /the /following /EXCEPT /- /verified /answer(s)-
✔✔A /process /integral /to /the /design /phase /of /a /project
All /of /the /following /could /be /Articles /in /Part /1 /of /a /specification /EXCEPT /- /verified /answer(s)-
✔✔Source /Quality /Control
The /Design /phase /of /a /project /includes /all /of /the /following /EXCEPT /- /verified /answer(s)-
✔✔Feasibility /Studies