Exam (elaborations)

NERC Prep - Bal, Int, & Trans Test with complete solution

Document preview thumbnail
Preview 3 out of 24 pages

system operations, frequency control, ACE calculations, DCS/CPS standards, communication protocols, and emergency procedures

Content preview

NERC Prep - Bal, Int, & Trans Test with
complete solution.
b. NERC Operating Committee ~CORRECT ANSWER~What group can
approve a change in the Disturbance Recovery Period for an Interconnection?

a. NERC Interconnection Working Group

b. NERC Operating Committee

c. NERC Regional Council

d. NERC Disturbance Analysis Working Group



c. Check targets and equipment ~CORRECT ANSWER~What is the first
thing an operator should do after a relay operation?

a. Check power system stabilizers

b. Notify adjacent Transmission and Balancing areas

c. Check targets and equipment

d. Notify their PSE that the transmission path is out of service



c. Tie Lines ~CORRECT ANSWER~For the ACE equation to work properly,
dynamic schedules, pseudo ties, frequency calculations, and all ________ must
be metered.

a. Communications

b. Transformers

c. Tie Lines

d. Generation

,c. Energy Emergency Alert Level I ~CORRECT ANSWER~What Energy
Alert Level would the following example be categorized as?

"A Balancing Authority, Reserve Sharing Group, or Load Serving Entity
foresees, or is experiencing conditions where all available resources are
committed to meet firm load, firm transactions, etc, and requests an Energy
Emergency Alert."

a. Energy Emergency Alert Level IV

b. Energy Emergency Alert Level III

c. Energy Emergency Alert Level I

d. Energy Emergency Alert Level II



b. Implement the appropriate congestion management procedure.
~CORRECT ANSWER~You are a Reliability Coordinator in the Eastern
Interconnection. A flow gate has become overloaded because a parallel 345kV
line has relayed out and part of that load has transferred over to the flow
gate causing an SOL and possible IROL violation. What would you do to
relieve this violation?

a. Notify another Reliability Coordinator and ask them if they are having
any problem, and what should you do.

b. Implement the appropriate congestion management procedure.

c. Issue a Transmission warning to the Transmission Operators that lost the
345kV line.

d. Place the line back in service within 30 minutes.



b. Adjacent Balancing Authorities ~CORRECT ANSWER~Interchange
schedules may be implemented between _______________________.

a. Source and Sink Balancing Authorities

, b. Adjacent Balancing Authorities

c. Sending, Receiving and Intermediate Balancing Authorities in the same
Region.

d. Balancing Authorities in the same Interconnection.



a. Frequency will continue to drop, generator governor response, decrease in
load. ~CORRECT ANSWER~When the frequency of an Interconnection
decreases due to the loss of a large generator, the ________________ until the
combination of both ____________ and ______________ replace the output of
the lost generator.

a. Frequency will continue to drop, generator governor response, decrease in
load

b. Frequency will continue to drop, generator governor response, voltage
regulating transformer response

c. Voltage will continue to raise, generator AVR response, voltage regulating
transformer response

d. Voltage will continue to raise, generator AVR response, decrease in load



a. That all involved reliability entities determined that there is no reliability
problems with the Arranged Interchange. ~CORRECT ANSWER~In
developing and setting up an Arranged Interchange, which of the following
would transition the Arranged Interchange to the Confirmed Interchange
status?

a. That all involved reliability entities determined that there is no reliability
problems with the Arranged Interchange.

b. The Department of Energy (DOE) made an in-depth study of the
Interchange Agreement and determined that it would have an adverse affect
on the Interconnection.

Document information

Uploaded on
June 15, 2025
Number of pages
24
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PUREGRADES
4.5
(20)
Sold
130
Followers
5
Items
1123
Last sold
4 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions