List //
3/
/violations /
/for /
/which /
/penalty /
/may /
/be /
/imposed //- /
/correct /
/answer(s) /
/✔✔ /
/no /
/state /
/CGP; /
/no /
/SWPPP; /
/SWPPP /
/not /
/available /
/for /
/review; /
/SW /
/BMPs /
/or /
/ESC /
/measure //improperly //installed/maintained; //Incomplete, //improper //or //missed //inspections
What /
/is /
/the /
/maximum /
,penalty //
/
a //locality //can //impose //under //the //stormwater //act? //- //correct //answer(s) //✔✔ //32,500
How //long //must //a //locality //VSMP //authority //hold //on //to //a //registration //statement? //- //correct
//answer(s) /
/✔✔ /
/Documented /
/and /
/retained /
/for //at //least //3 //years //from //the //date //of //project //completion //or //state //permit //termination
how /
/often /
/must /
/DEQ /
/conduct /
/program /
/reviews? //- /
/correct /
/answer(s) //✔✔ //DEQ //is //required //to //conduct //a //program //review //once //every //5 //years
How /
/frequently /
/must //a //VSMP //authority //inspect //construction //site? //- //correct //answer(s) //✔✔ //periodically
what /
/are /
/the /
/two /
/locations /
/where /
/the /
/notice /
/of /
, /coverage /
/letter /
/must /
/be /
/posted? //- /
/correct //answer(s) //✔✔ //Main //Construction //entrance, //general //info //section //of //SWPPP
What /
/two /
/options /
/does /
/the /
/operator /
/have /
/for /
/making /
/the //SWPPP //available //to //the //public? //- //correct //answer(s) //✔✔ //Electronic //or //hard //copy
What /
/is /
/the /
/qualified /
/personnel's /
/inspection /
/frequency /
/for /
/areas //that //have //been //temporarily //stabilized? //- //correct //answer(s) //✔✔ //once //per //month
What /
/must /
/be /
/included /
/in /
/the /
/SWPPP /