FAR 52.236-21 - Answers Contract Clause
RFI - Answers Contractor is required to request clarification of the Contract Documents (plans and specs)
when necessary
RFI's can include questions about - Answers Site conditions, maintenance space and access, conflicts and
discrepancies between plans and specs, conflicts and discrepancies between disciplines, permits and
codes, extensions of design, and coordination drawing review
DQCM - Answers Design Quality Control Manager is responsible for the review of products produced by
the contractors designer of record. DQCM is associated with the QC manager
QC plan includes review - Answers to be implemented
to ensure that the design will comply with the criteria provided as well as the
quality defined in the Government's Request For Proposal (RFP).
DQCP - Answers Design quality control plan found in section 01 45 00.00
Extension of Design - Answers Where extensions of the design are required from
subcontractors subcontractors, or suppliers they must be coordinated with other activities.
RFI process - Answers • Review of all applicable contract documents.
• Coordination with affected sub-contractors and suppliers.
• Clear and succinct problem statement.
• Suggested solution;
• Timeframe that a response is required in order to minimize cost and/or
schedule impacts.
DVCR - Answers Design Variation Clarification Request
VECP - Answers Value Engineering Change Proposal
3 instances of contractor extensions of designs - Answers pre-engineered metal buildings, fire
alarm and protection systems, cathodic protection
Name some possible areas that must be addressed during the contractor's