DEQ- Stormwater Mangement Inspector Exam Questions And Answers 100% Pass What two plans in the SWPPP must be approved? - ANS Erosion and sediment control plans and stormwater management plans must be approved. Does the stormwater management plan address runoff during construction or after? - ANS The stormwater management plan addresses post-construction stormwater runoff. What impact does impervious cover have on water quality? - ANS The volume and velocity of stormwater runoff increases as natural vegetation is replaced with roads, buildings, parking areas and other impervious surfaces. The increase in stormwater runoff leads to an increase in pollutants, such as sediment and phosphorus that are carried to waterways, which has a negative effect on water quality. What is the target pollutant in the water quality criteria ? - ANS Phosphorus What is the lower limit of the range of imperviousness that scan result in stream degradation? - ANS 10% The SWM regulation ensures water quantity is considered in stormwater management planning to protect against which two destructive forces? - ANS Channel erosion and flooding. ©EVERLY 2025 ALL RIGHTS RESERVED Discuss how the rate of runoff changes after development. - ANS The rate of runoff increase after development because of the replacement of vegetation with impervious surfaces. A larger volume of water will travel more quickly through a stream channel, potentially causing erosion and flooding. A locality VSMP must be at least as stringent as what state permit? - ANS Construction GP (9VAC). What plans must a locality's ordinance require to be submitted and approved? - ANS ESC plan and SWM plan (9VAC) List three violations for which a penalty may be imposed. - ANS (9VAC) *No registration date *No SWPPP *Incomplete SWPPP *SWPPP not available for review *No approves ESC plan *Failure to install stormwater management BMPs or ESCs *Stormwater BMP or erosion and sediment controls improperly installed or maintained *Operational deficiencies

Mostrar más Leer menos
Institución
DEQ- Stormwater Mangement Inspector
Grado
DEQ- Stormwater Mangement Inspector









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
DEQ- Stormwater Mangement Inspector
Grado
DEQ- Stormwater Mangement Inspector

Información del documento

Subido en
15 de mayo de 2025
Número de páginas
12
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

©EVERLY 2025 ALL RIGHTS RESERVED




DEQ- Stormwater Mangement Inspector
Exam Questions And Answers 100% Pass




What two plans in the SWPPP must be approved? - ANS Erosion and sediment control plans
and stormwater management plans must be approved.


Does the stormwater management plan address runoff during construction or after? -
ANS The stormwater management plan addresses post-construction stormwater runoff.



What impact does impervious cover have on water quality? - ANS The volume and velocity of
stormwater runoff increases as natural vegetation is replaced with roads, buildings, parking
areas and other impervious surfaces. The increase in stormwater runoff leads to an increase in
pollutants, such as sediment and phosphorus that are carried to waterways, which has a
negative effect on water quality.



What is the target pollutant in the water quality criteria ? - ANS Phosphorus


What is the lower limit of the range of imperviousness that scan result in stream degradation? -
ANS 10%


The SWM regulation ensures water quantity is considered in stormwater management planning
to protect against which two destructive forces? - ANS Channel erosion and flooding.

, ©EVERLY 2025 ALL RIGHTS RESERVED


Discuss how the rate of runoff changes after development. - ANS The rate of runoff increase
after development because of the replacement of vegetation with impervious surfaces. A larger
volume of water will travel more quickly through a stream channel, potentially causing erosion
and flooding.



A locality VSMP must be at least as stringent as what state permit? - ANS Construction GP
(9VAC25-870-106).



What plans must a locality's ordinance require to be submitted and approved? - ANS ESC
plan and SWM plan (9VAC25-870-148)



List three violations for which a penalty may be imposed. - ANS (9VAC25-870-116)
*No registration date


*No SWPPP


*Incomplete SWPPP


*SWPPP not available for review


*No approves ESC plan


*Failure to install stormwater management BMPs or ESCs


*Stormwater BMP or erosion and sediment controls improperly installed or maintained


*Operational deficiencies
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Everly Teachme2-tutor
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
18
Miembro desde
1 año
Número de seguidores
1
Documentos
2796
Última venta
2 meses hace
Study packs.

Find Quality Exam Materials made by professionals With A guaranteed A+

4.3

4 reseñas

5
2
4
1
3
1
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes