100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

EICA Mobile Crane & Digger Derrick EXAM QUESTIONS WITH CORRECT EXPLAINED SOLUTIONS || 100% GUARANTEED PASS!! RECENT VERSION

Puntuación
-
Vendido
-
Páginas
38
Grado
A+
Subido en
30-04-2025
Escrito en
2024/2025

EICA Mobile Crane & Digger Derrick EXAM QUESTIONS WITH CORRECT EXPLAINED SOLUTIONS || 100% GUARANTEED PASS!! RECENT VERSION 1. According to OSHA, when traveling under an energized power line, what is the minimum distance for a line with over 750kv? - ANSWER 20ft 2. When a crane is in transit and you are required to pass under 50kV power lines, what is OSHA's minimum required clearance? - ANSWER 6 ft (Table T) 3. If setting up the crane by a ditch or an excavation, you should stay at least what distance from the edge? - ANSWER 1 ½ times the depth of the excavation 4. When working at ground floor level near a cellar wall, the crane's outrigger pads or tracks should be placed - ANSWER at least as far back as the depth of the wall below ground 5. According to OSHA who is responsible for ensuring proper ground conditions when setting up a mobile crane? - ANSWER The controlling entity 6. What is not a good location for crane set up? - ANSWER Above utilities 7. What is the best procedure to follow when underground utilities may be present? - ANSWER Contact local utility company 8. While performing a shift inspection on a crane and there is water accumulation around the outrigger, what must be done? - ANSWER Drained 9. While operating a boom truck near a reinforced retaining wall, it is recommended to stay back - ANSWER A distance equal to the depth 10. What would be a concern when setting up a crane over a sewer or water main? - ANSWER Weight and vibration from the machine and load 11. When setting up a crane in an area that has public access, you should barricade: - ANSWER the jobsite 12. When setting up a crane, what must be barricaded to protect workers? - ANSWER The hazardous areas created by the rotating superstructure 13. According to OSHA, what area must be barricaded to prevent employees from entering - ANSWER accessible areas within the swing radius of the rear of the rotating superstructure of the crane 14. The best way to keep people from being injured from the counterweight of the crane is to - ANSWER Fence or barricade the swing area of the crane 15. When operating a crane in a tight space, what would be the recommended minimum clearance for the rear swing of the crane? - ANSWER 2 ft 16. The load line of the crane you're operating comes into contact with an energized power line. There's no sign of any other danger, such as fire. In such a situation, you should - ANSWER stay in the cab until the lines are de-energized

Mostrar más Leer menos
Institución
EICA Mobile Crane & Digger Derrick
Grado
EICA Mobile Crane & Digger Derrick

Vista previa del contenido

EICA Mobile Crane & Digger Derrick EXAM
QUESTIONS WITH CORRECT EXPLAINED
SOLUTIONS || 100% GUARANTEED PASS!!
<RECENT VERSION>


1. According to OSHA, when traveling under an energized power line, what is the
minimum distance for a line with over 750kv? - ANSWER 20ft


2. When a crane is in transit and you are required to pass under 50kV power lines,
what is OSHA's minimum required clearance? - ANSWER 6 ft (Table T)


3. If setting up the crane by a ditch or an excavation, you should stay at least what
distance from the edge? - ANSWER 1 ½ times the depth of the excavation


4. When working at ground floor level near a cellar wall, the crane's outrigger
pads or tracks should be placed - ANSWER at least as far back as the depth of
the wall below ground


5. According to OSHA who is responsible for ensuring proper ground conditions
when setting up a mobile crane? - ANSWER The controlling entity


6. What is not a good location for crane set up? - ANSWER Above utilities


7. What is the best procedure to follow when underground utilities may be
present? - ANSWER Contact local utility company

,8. While performing a shift inspection on a crane and there is water accumulation
around the outrigger, what must be done? - ANSWER Drained


9. While operating a boom truck near a reinforced retaining wall, it is
recommended to stay back - ANSWER A distance equal to the depth


10.What would be a concern when setting up a crane over a sewer or water main? -
ANSWER Weight and vibration from the machine and load


11.When setting up a crane in an area that has public access, you should barricade:
- ANSWER the jobsite


12.When setting up a crane, what must be barricaded to protect workers? -
ANSWER The hazardous areas created by the rotating superstructure


13.According to OSHA, what area must be barricaded to prevent employees from
entering - ANSWER accessible areas within the swing radius of the rear of the
rotating superstructure of the crane


14.The best way to keep people from being injured from the counterweight of the
crane is to - ANSWER Fence or barricade the swing area of the crane


15.When operating a crane in a tight space, what would be the recommended
minimum clearance for the rear swing of the crane? - ANSWER 2 ft


16.The load line of the crane you're operating comes into contact with an energized
power line. There's no sign of any other danger, such as fire. In such a situation,
you should - ANSWER stay in the cab until the lines are de-energized

,17.What is the most common cause of death to ground personnel working with
cranes - ANSWER electrocution


18.According to ASME B30.5, when working around power lines of more than
750kV, how much clearance is generally required from any part of the crane and
its load - ANSWER 45 ft


19.What is the proper procedure when using an insulating link or a boot near
power lines - ANSWER be sure to maintain the correct allowable distance from
the lines


20.When working closer than 10 feet on a 12 KV line - ANSWER De-energize and
ground the circuit.


21.What is the minimum allowable clearance from the crane and power lines under
50kV - ANSWER 10 ft


22.When working near power lines, when is a dedicated spotter required? -
ANSWER When the crane can reach within 20 ft. of power lines


23.According to OSHA 1926 Subpart CC, how many power line warning decals
must be on a crane working in construction? - ANSWER 3


24.When is it safe to handle loads under powerlines? - ANSWER The load nor any
part of the crane can come closer than regulations allow


25.According to ASME B30.5, the prohibited zone for power lines that are 60kV is
- ANSWER 15 ft

, 26.What is the #1 cause of death of ground personnel working with cranes? -
ANSWER Electrocution


27.What is the minimum clearance for a crane operating near an energized power
line of 40 kV for a non-qualified electrical worker? - ANSWER 10 ft


28.What must a person working around energized power lines not wear? -
ANSWER Conductive items


29.If a crane is being used closer than 10' to an energized power line, the operator
must - ANSWER Be an electrically qualified person


30.A crane in operation makes contact with an energized power line and the crane
bursts into flames, what should the operator do? - ANSWER Jump from the
crane


31.Who does the link protect when using an insulated link on a crane hook? -
ANSWER Ground personnel


32.Protective grounding equipment must be able to conduct the maximum fault
current - ANSWER at the point of grounding.


33.What is the minimum approach distance for an unqualified crane operator with
a qualified electrical worker as an observer doing work around a 12 KV circuit?
- ANSWER 10 feet


34.OSHA ET&D standards require retraining if a task has not been performed for
over - ANSWER 1 year.

Escuela, estudio y materia

Institución
EICA Mobile Crane & Digger Derrick
Grado
EICA Mobile Crane & Digger Derrick

Información del documento

Subido en
30 de abril de 2025
Número de páginas
38
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$14.89
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
QuizWhiz

Conoce al vendedor

Seller avatar
QuizWhiz Havard School
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
4
Miembro desde
1 año
Número de seguidores
1
Documentos
473
Última venta
3 semanas hace
Ultimate Q&amp;A Hub | Verified Answers for Success

Welcome to Ultimate Q&amp;A Hub | Verified Answers for Success – your go-to source for high-quality, well-structured Q&amp;A study materials! Whether you're preparing for exams, quizzes, or assignments, my carefully curated question-and-answer documents will help you grasp key concepts quickly and effectively. All resources are clear, accurate, and designed to help you study smarter, not harder. Browse now and start acing your subjects with confidence! For every student you refer to me with an order that is completed and paid transparently, I will do one assignment for you, FREE of any fee.

Lee mas Leer menos
0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes