• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 16 páginas
Examen

Block III Practice Test/questtions with correct answers

Document preview thumbnail
Vista previa 3 fuera de 16 páginas

Block III Practice Test/questtions with correct answers

Vista previa del contenido

Block III Practice Test-Contracting
Apprentice Tech School exam

Which FAR Part governs the Evaluation of Commercial Items?
c c c c c c c c


a. 52.212-1
c


b. 52.212-2
c


c. 52.212-4
c


d. 52.212-5 - answer-b. 52.212-2
c c c c




The CO shall evaluate quotation or offers inclusive of ___ charges.
c c c c c c c c c c


a. Tax
c


b. Partial
c


c. Company
c


d. Transportation - answer-d. Transportation
c c c c




_____ SAP, there is no requirement to build a formal database to score quotes.
c c c c c c c c c c c c c




a. Using
c


b. Using Other than - answer-a. Using
c c c c c c




A provision that is required when the inclusion of evaluation factors is deemed
c c c c c c c c c c c c


necessary.
c


a. FAR Subpart 52.212-1
c c c


b. FAR Subpart 52.217-2
c c c


c. FAR Subpart 52.212-2
c c c


d. FAR Subpart 52.212-5 - answer-c. FAR Subpart 52.212-2
c c c c c c c c




Which of the following is NOT a price related factor?
c c c c c c c c c




a. Options
c


b. Multiple Award
c c


c. Technical Excellence
c c


d. Transportation/Delivery - answer-c. Technical Excellence
c c c c c




(T/F) Evaluation Factors must be listed in a particular order.
c c c c c c c c c




a. True
c


b. False - answer-b. False
c c c c




Evaluation Factors included in the solicitation must or must not be used when evaluating
c c c c c c c c c c c c c


offers?
c

,a. Must
c


b. Must not - answer-a. Must
c c c c c




When shall the CO make the determination that a contractor is responsible?
c c c c c c c c c c c




a. At the time of award
c c c c c


b. Before Award
c c


c. Post Award
c c


d. Within 30 days of award - answer-b. Before Award
c c c c c c c c c




Exclusion Type: Disqualifying for a temporary period of time.
c c c c c c c c




a. Suspension
c


b. Debarment
c


c. Ineligible
c


d. Disqualified - answer-a. Suspension
c c c c




Exclusion Type: Disqualifying for a specified period of time.
c c c c c c c c




a. Suspension
c


b. Debarment
c


c. Ineligible
c


d. Disqualified - answer-b. Debarment
c c c c




Exclusion Type: Disqualifying a contractor from doing business with the government
c c c c c c c c c c


pursuant to statutory, executive order, or regulatory authority other than the FAR and its
c c c c c c c c c c c c c c


supplements.
c




a. Suspension
c


b. Debarment
c


c. Ineligible
c


d. Disqualified - answer-c. Ineligible
c c c c




System used to verify contractors are eligible to do business with the government.
c c c c c c c c c c c c




a. SAM
c


b. FAPIIS
c


c. GSA
c


d. FASA - answer-a. SAM
c c c c




When shall prospective contractors be registered in SAM?
c c c c c c c




a. At the time of award
c c c c c


b. Post Award
c c


c. It is not required
c c c c


d. Prior to award - answer-d. Prior to award
c c c c c c c c

, If the contract action is being awarded under unusual and compelling circumstances, the
c c c c c c c c c c c c


ccontractor is required to be registered in SAM within __ days ____ award.
c c c c c c c c c c c c




a. 30; after
c c


b. 60; after
c c


c. 30; before
c c


d. 60; before - answer-a. 30; after
c c c c c c




Used to collect contractor performance and integrity information.
c c c c c c c




a. SAM c


b. FAPIIS
c


c. GSA Advantage
c c


d. AF Launchpad - answer-b. FAPIIS
c c c c c




1. What constitutes a determination that a prospective contractor is responsible with
c c c c c c c c c c c


respect to that contract?
c c c c




a. CA Signature
c c


b. COCO Signature
c c


c. Contract award
c c


d. CO Signature - answer-d. CO Signature
c c c c c c




A written determination of ____ is required and kept in the file if a prospective contractor
c c c c c c c c c c c c c c c


is determined not responsible.
c c c c




a. Findings
c


b. Determination
c


c. Intent
c


d. Roles and Responsibilities - answer-b. Determination
c c c c c c




If a prospective contractor is determined to be not responsible and is also a small
c c c c c c c c c c c c c c


cbusiness, who does the CO forward their written determination of non-responsibility to?
c c c c c c c c c c c




a. GSA c


b. FDA c


c. SBA c


d. FSA - answer-c. SBA
c c c c




Which FAR Part states guidelines to follow in order to determine a contractor
c c c c c c c c c c c c


responsible?
c


a. 4 c


b. 5 c


c. 9 c


d. 10 - answer-c. 9
c c c c

Información del documento

Subido en
24 de abril de 2025
Número de páginas
16
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$13.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
FAEYOO1
1.0
(1)
Vendido
3
Seguidores
0
Artículos
613
Última venta
4 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes