The curved surface of the socket should be _____ and lubricated with _____ at least every
_____ months.
Give this one a try later!
Clean
Petroleum-type oil
6
, Apply less than _____% of design strength to the specimen before checking _____ and
_____ of the cylinder.
Give this one a try later!
10%
Perpendicularity
Centering
The results of this test method may be used to determine quality control of concrete
proportioning, mixing, and _____ operations; compliance with _____, or for evaluating the
effectiveness of _____.
Give this one a try later!
Placing
Specifications
Admixtures
The _____ block should provide a readily machinable surface for maintenance of the
specified surface conditions.
Give this one a try later!
Bottom bearing
Lower bearing block thickness when new and after resurfacing.
_____ months.
Give this one a try later!
Clean
Petroleum-type oil
6
, Apply less than _____% of design strength to the specimen before checking _____ and
_____ of the cylinder.
Give this one a try later!
10%
Perpendicularity
Centering
The results of this test method may be used to determine quality control of concrete
proportioning, mixing, and _____ operations; compliance with _____, or for evaluating the
effectiveness of _____.
Give this one a try later!
Placing
Specifications
Admixtures
The _____ block should provide a readily machinable surface for maintenance of the
specified surface conditions.
Give this one a try later!
Bottom bearing
Lower bearing block thickness when new and after resurfacing.