Operations Management II 73-431 Winter 2002
Odette School of Business
University of Windsor
Final Exam Solution
Tuesday, April 16, 3:30 – 6:30 pm ED Gym Area 1-3
Instructor: Mohammed Fazle Baki
Aids Permitted: Calculator, straightedge, and 3 one-sided formula sheet.
Time available: 3 hours
Instructions:
• This exam has 22 pages including this cover page and 5 pages of table
• Please be sure to put your name and student ID number on each page.
• Show your work.
Marking Scheme:
Question Score Question Score
1 /15 2 /6
3 /4 4 /4
5 /7 6 /2
7 /2 8 /5
9 /4 10 /6
11 /8 12 /11
13 /16 14 /10
Total /100
, Name:_________________________________________________ ID:_________________________
Question 1: (15 points)
1.1 A process layout is a linear arrangement of workstations to produce a specific product.
a. True
b. False
1.2 A cellular layout is an automated machining & material handling system.
a. True
b. False
1.3 An advantage of cellular layouts is reduced material handling and transit time.
a. True
b. False
1.4 An disadvantage of cellular layouts is increased capital investment.
a. True
b. False
1.5 CRAFT is a layout construction procedure.
a. True
b. False
1.6 Closeness ratings are obtained from an activity relationship chart.
a. True
b. False
1.7 A p − chart is used for variable data.
a. True
b. False
1.8 Searching cost includes the cost of operating out of control.
a. True
b. False
1.9 If sample size n increases and acceptance number c does not change, producer’s risk increases
and consumer’s risk decreases.
a. True
b. False
1.10 If a lot is rejected, the consumer is likely to get some defective items.
a. True
b. False
1.11 If N is much larger than n , AOQ = Pa p
a. True
b. False
2