MARYLAND ASBESTOS EXAM EXAM
WITH CORRECT ANSWERS 2025
The lean ratio of an extension ladder correct answers 4:1
According to AHERA, to complete a response action of a non-NESHAP size
project, how many samples must be taken with results of what? correct
answers 5 samples taken inside with results of each <0.0 f/cc
What are the notification requirements in Virginia? correct answers 20
calendar days for any project greater than 10 sq feet or linear feet
In what jurisdiction do individuals need an asbestos supervisor or
working linsense correct answers Need a license everywhere
Type of bond that would ensure that the general contractor will
compensate subcontractors for labor and materials correct
answers Performance Bond
Minimum respiratory protection on a class 1 asbestos project with no
NEA correct answers Full face air purifying respirator
What is the maximum content permitted in the work area where an
air purifying respirator is being worn? correct answers 23.5%
Chest XRays must be evaluated by what class reader? correct
answers Class B What is the APF for a full face air purifying respirator
correct answers 50
Friable ACM is any material that can be: correct answers Crushed,
pulverized, reduced to powder by hand pressure when dry
The OSHA permissible exposure limit is correct answers 0.1 f/cc over 8
hours TWA
According to ASHERA, how many air samples must be taken for final
clearance for NESHAP size project? correct answers 13 samples (5 inside, 5
outside, 2 fields blanks , one sealed blank)TEM
Laboratories that perform PLM and TEM must be accredited by correct
answers National Voluntary Laboratory Accreditation Program
AHERA is for correct answers Public schools K-12
, What is the notification requirement for asbestos projects in DC correct
answers 10 working days prior to start NESHAP size projects and any project
over 18 square feet of flooring. Building owner to notify tenants no less than
30 days prior to start of the project in writing
What is a NESHAP sized project correct answers 160 square feet, 260 linear
feet, or 35 cubic feet
The competent person must inspect the work suits of the crew at least:
correct answers Once a shift
In Maryland, the asbestos project notification must be posted when and
where? correct answers Three days prior to any asbestos project, at all
entrances and exits from the work site.
NESHAP regulations provide definitions for correct answers Renovations,
Adequately Wet, and Demolitions
The definition of PACM is correct answers TSI and surfacing material found in
a building constructed no later than 1980
The OSHA Asbestos in construction standard required employees to maintain
exposure monitoring results for how many years? correct answers 30 years
What is the safe level of asbestos exposure? correct answers There is no
safe limit
What is the purpose of aggressive air sampling? correct answers
Simulates the conditions in the work area
Initial worker exposure air samples are collected: correct answers To predict
what future exposures should be on this project
According to OSHA construction standard, fall protection is required at
working at or above correct answers 6 feet
What info is required on a safety data sheet? correct answers First aid
procedures, emergency clean up procedures, type of PPE
When conducting final air samples in Maryland, how many samples are
needed? correct answers One per room, one per 5,000 sq feet of
containment or 50,000 cubic feet of containment, whichever is greater
Exposure minoring is the responsibility of the: correct answers Competent
person
WITH CORRECT ANSWERS 2025
The lean ratio of an extension ladder correct answers 4:1
According to AHERA, to complete a response action of a non-NESHAP size
project, how many samples must be taken with results of what? correct
answers 5 samples taken inside with results of each <0.0 f/cc
What are the notification requirements in Virginia? correct answers 20
calendar days for any project greater than 10 sq feet or linear feet
In what jurisdiction do individuals need an asbestos supervisor or
working linsense correct answers Need a license everywhere
Type of bond that would ensure that the general contractor will
compensate subcontractors for labor and materials correct
answers Performance Bond
Minimum respiratory protection on a class 1 asbestos project with no
NEA correct answers Full face air purifying respirator
What is the maximum content permitted in the work area where an
air purifying respirator is being worn? correct answers 23.5%
Chest XRays must be evaluated by what class reader? correct
answers Class B What is the APF for a full face air purifying respirator
correct answers 50
Friable ACM is any material that can be: correct answers Crushed,
pulverized, reduced to powder by hand pressure when dry
The OSHA permissible exposure limit is correct answers 0.1 f/cc over 8
hours TWA
According to ASHERA, how many air samples must be taken for final
clearance for NESHAP size project? correct answers 13 samples (5 inside, 5
outside, 2 fields blanks , one sealed blank)TEM
Laboratories that perform PLM and TEM must be accredited by correct
answers National Voluntary Laboratory Accreditation Program
AHERA is for correct answers Public schools K-12
, What is the notification requirement for asbestos projects in DC correct
answers 10 working days prior to start NESHAP size projects and any project
over 18 square feet of flooring. Building owner to notify tenants no less than
30 days prior to start of the project in writing
What is a NESHAP sized project correct answers 160 square feet, 260 linear
feet, or 35 cubic feet
The competent person must inspect the work suits of the crew at least:
correct answers Once a shift
In Maryland, the asbestos project notification must be posted when and
where? correct answers Three days prior to any asbestos project, at all
entrances and exits from the work site.
NESHAP regulations provide definitions for correct answers Renovations,
Adequately Wet, and Demolitions
The definition of PACM is correct answers TSI and surfacing material found in
a building constructed no later than 1980
The OSHA Asbestos in construction standard required employees to maintain
exposure monitoring results for how many years? correct answers 30 years
What is the safe level of asbestos exposure? correct answers There is no
safe limit
What is the purpose of aggressive air sampling? correct answers
Simulates the conditions in the work area
Initial worker exposure air samples are collected: correct answers To predict
what future exposures should be on this project
According to OSHA construction standard, fall protection is required at
working at or above correct answers 6 feet
What info is required on a safety data sheet? correct answers First aid
procedures, emergency clean up procedures, type of PPE
When conducting final air samples in Maryland, how many samples are
needed? correct answers One per room, one per 5,000 sq feet of
containment or 50,000 cubic feet of containment, whichever is greater
Exposure minoring is the responsibility of the: correct answers Competent
person