Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 13 páginas
Examen

CSI CDT EXAM STUDY GUIDE 2025/2026 QUESTIONS WITH ANSWERS GRADED A+

Document preview thumbnail
Vista previa 2 fuera de 13 páginas

CSI CDT EXAM STUDY GUIDE 2025/2026 QUESTIONS WITH ANSWERS GRADED A+

Vista previa del contenido

CSI CDT EXAM STUDY GUIDE 2025/2026 QUESTIONS WITH
ANSWERS GRADED A+
✔✔Facility Management - ✔✔During occupancy, owners & facility managers maintain
and evaluate the performance of the project and determine suitability for continuing use.

✔✔OmniClass - ✔✔A multi-table informational framework for organizing information
used by the architectural, engineering, and construction industry.

✔✔UniFormat - ✔✔Uniform classification system for organizing preliminary construction
information into a standard order or sequence on the basis of systems or assemblies.
Particularly useful in conceptual design. Element Identification.

✔✔MasterFormat - ✔✔Arranges related construction practices, logical groupings of
work results, into a series of divisions. 50 division format. Used for Specifications, data
organization, and cost classification.

✔✔MasterFormat Groups - ✔✔00 Procurement and Contracting Requirement Group

Specifications Group
- General Requirements 01
- Facility Construction Subgroup (concrete)
- Facility Services (plumbing/HVAC)
- Site and Infrastructure (Earthwork)
- Process Equipment (WW equipment)

✔✔SectionFormat - ✔✔Provides a uniform approach to organizing specification
information by three primary parts. General, Products, Execution

✔✔Sustainable Design - ✔✔Environmental performance of the facility over course of its
life cycle. Takes place at the product and facility level.

✔✔Environmental Design Tools - ✔✔National Institute of Technology (NIST) - Building
for Env. and Economic Sustainability (BEES) - for building products

EPA - Energy Star program - products are rated for sustainability criteria compliance

US Green Building Council (USGBC) - Leadership in Energy and Environmental Design
(LEED) - certifies facilities on USGBC criteria

✔✔Bid - ✔✔Offer to perform a contract for work or to supply materials or goods at a
specific price.

✔✔Proposal - ✔✔Opportunity for more consideration by the recipient sometimes utilized
when other conditions will be negotiated.

, ✔✔Instructions for Procurement - ✔✔Requirements with which bidder must comply
before and during submission of bids. Standard forms created by professional
associations often used.

✔✔Green Buildings - ✔✔Reduce overall impact of the built environment by protecting
occupant health and improving employee productivity.

✔✔National CAD standard - ✔✔CSI Uniform Drawing System

✔✔Autonomy to Contract - ✔✔Two parties are mutually free to determine the terms of
an agreement for a specific purpose.

✔✔Trade Customs - ✔✔If contract document don't adequately establish intent, court
may rely on customs of an industry.

✔✔Preliminary Project Description - ✔✔Method of describing aspects of the schematic
design in written form. Describe physical requirements the logical grouping of systems
assemblies and components.

✔✔Dual Nature of Design - ✔✔Aesthetic and Technical Design

✔✔Quality Control - ✔✔Procedures for evaluating completed activities and elements of
design for conformance.

✔✔Quality Assurance - ✔✔Procedures for guarding against defects and deficiencies
before and during execution of work.

✔✔Allowance - ✔✔Specified monetary sum or quantity of work not otherwise defined by
the specs and drawings. Included in Division 01.

✔✔Project Budget - ✔✔*Not* the same as construction budget. Consists of soft and
hard costs.

✔✔Hard Costs - ✔✔Tangible components of the completed projects. Site related costs,
construction, furniture, furnishings, and equipment.

✔✔Soft Costs - ✔✔Includes: Due diligence, project design fees, commissioning,
jurisdictional fees, relocation, terminating leases and rental agreements.

✔✔Construction Budget - ✔✔Prepared by several methods. Systems (CSI UniFormat),
cost per measured units, component costs.

✔✔Project Schedule - ✔✔Succession of steps, script of interactions, milestone dates.

Información del documento

Subido en
15 de abril de 2025
Número de páginas
13
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BOARDWALK
3.5
(41)
Vendido
284
Seguidores
10
Artículos
33387
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes