Construction Project primary players - correct answer-✅owner(s), designer(s), and construction
professionals
owner's duties - correct answer-✅develop the program, determine the scope, creating overall budget,
providing the funding
what is developing a program? - correct answer-✅contract type selection, invitation to bid, finance
options
what is a construction scope of work? - correct answer-✅-like a playbook for every project
-NOT a design yet
-the scope of work tells you s story. It includes the work to be done on a project, how the workers should
complete the job, and who on the team is responsible for completing the different tasks on the project
types of owners - correct answer-✅private (developers, direct owners, facility managers, etc.) and
public (city, state, federal agencies)
design team consists of... - correct answer-✅architects (lead, interior designer, landscape architect, etc)
and consultants (includes engineers)
types of consultants - correct answer-✅-direct consultants participate in the design (mainly
engineering, structural, MEP, HVAC, etc.)
-indirect consultants advise the architects and the direct consultants (lighting, acoustic, health and
safety, etc.)
construction professionals consist of: - correct answer-✅-general contractors
-construction managers
what is a general contractor? - correct answer-✅is responsible for the day to day oversight of a
construction site, management of vendors and trades, and the communication of information to all
involved parties throughout the course of a building project
what is a construction manager? - correct answer-✅is a professional service that uses specialized,
project management techniques to oversee the planning, design, and construction of a project, from its
beginning to its end
secondary team 1st level - correct answer-✅-specialty contractors or trade partners
-suppliers
-vendors
what are the types of specialty contractors? - correct answer-✅electrical, plumbing, mechanical,
carpentry, drywall, painting, striping, low voltage, flooring, doors and hardware, windows, steel erection,
concrete, roofing, water proofing, civil/underground utilities, paving, hardscape, landscape, etc
secondary team 2nd level - correct answer-✅-building inspectors
-utility companies
-insurance and bonding companies
-labor unions
secondary team 3rd level - correct answer-✅-government
-trade associations
-financial institutions
-educational institutions
-etc.
what is construction management? - correct answer-✅the planning, scheduling, evaluation, and
controlling of construction tasks or activities to accomplish specific objectives by effectively allocating

, and utilizing appropriate labor, materials, and time resources in a manner that minimizes cost and
maximizes customer/owner satisfaction
what are the six dials of project value? - correct answer-✅-cost
-time
-quality
-safety
-scope
-function
cost - correct answer-✅-money
-costs are established, targeted, and controlled by means of an estimate
-cost is tracked as work progresses and measured against budget
-goal is to maintain costs within or below budget
time - correct answer-✅-time is money in the construction industry
-for many projects, the speed with which the building can be brought on line is more important than
almost any other factor
-time is monitored and controlled by a detailed schedule
-liquidated damages
quality - correct answer-✅-quality addresses aesthetic impact, user perceptions, appropriateness of
building materials
-quality is monitored and controlled by specifications, punch lists, inspections, tests, and other surveys
safety - correct answer-✅-workers safety is more important than any deadline or cost
-care must always be taken to ensure that the building process and the building itself do not create
hazards to workers or users
scope - correct answer-✅is monitored and controlled by means of an architectural program, which
identifies the space needs and tracks compliance of the building design with those needs
function - correct answer-✅outcome is to satisfy the owner's needs for a building, both in short term
and in long term
project delivery - correct answer-✅the process by which all the procedures and components of
designing and building a facility are organized and put together in an agreement that results in a
completed project
what are the most typical types project delivery? - correct answer-✅-design-bid-build
-construction management (CM agency or CM at risk)
-design-build
-intergraded project delivery
out of all the delivery methods, which is the traditional one? - correct answer-✅design-bid-build
construction management agency - correct answer-✅-is a fee based service in which the construction
manager is responsible exclusively to the owner and acts in the owner's best interest at every stage of
the project
-can be multiple prime contractors or a single GC
construction management at risk - correct answer-✅-is a project delivery method as an option that
entails a commitment by the construction manager to deliver the project within a guaranteed maximum
price (GMP)
-the CM at risk acts as a consultant to the owner during the design phase but does the work of a GC
during the construction phase
design-build - correct answer-✅-becoming one of the most popular
-in this arrangement, there is only one contract
-the owner contracts with the design-build entity (typically and GC and a AE group who partner), which
will be responsible for both the design and construction of the project

Escuela, estudio y materia

Institución
COSC 153
Grado
COSC 153

Información del documento

Subido en
8 de abril de 2025
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EduSprint Queen’s University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
34
Miembro desde
2 año
Número de seguidores
5
Documentos
6196
Última venta
3 semanas hace
STUDY_STASH

FOR THE BEST ASSIGNMENTS,TEST BANKS,EASSY AND TO HELP IN TUTORING. Where else if not bubba stores make sure to check out what I offer and t documents that will help you in your study's .As an experienced seller committed to excellence, . "Boost your Grades Effortlessly with Expertly Crafted Study Guides!Here, you'll find high-quality, well-organized exam, quizzes, study notes, summaries, and exam guides to help you ace your courses with ease. Whether you're prepping for an exam, tackling assignments, or just looking for a quick study boost, my resources are designed to save you time and improve your grades. Download, study, and succeed! Updated exams .Actual tests 100%, verified.ATI,NURSING,PMHNP,TNCC,USMLE,ACLS,WGU AND ALL EXAMS guaranteed success.Here, you will find everything you need in NURSING EXAMS AND TESTBANKS.Contact us, to fetch it for you in minutes if we do not have it in this shop.BUY WITHOUT DOUBT!!!!Always leave a review after purchasing any document so as to make sure our customers are 100% satisfied.

Lee mas Leer menos
4.2

5 reseñas

5
3
4
0
3
2
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes