100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

SPēD SAPPC - PHYSEC EXAM QUESTIONS AND ANSWERS GRADED A+

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
07-04-2025
Escrito en
2024/2025

SPēD SAPPC - PHYSEC EXAM QUESTIONS AND ANSWERS GRADED A+ B. It must be in an area designated as a Restricted Area - Answers When designing a new multi-story government Special Access Program Facility (SAPF), the architect provided identical drawings for two three-story buildings to the security officer. One drawing is for a building on the installation to be occupied only by contracting Company X. The other is for the command headquarters building on the installation.The design reveals floor-to-ceiling windows on the second floor for the main conference rooms and front office staff. The drawings indicate a parking lot adjacent to the building separated by a four-foot-wide, handicap-accessible sidewalk. The architect placed emergency exits and stairwells at each end of the building with door hardware on the exterior to facilitate access/egress. The floor plans show interior office and conference room doors with GSA-approved locks and connectivity to the building access control badge system. The front door drawings indicate a large safety glass key lock entry door with the unit logo and designation etched in the glass. The single entry door provides access into the building lobby where visit control staff will greet people and in-process visitors. The plans identify lock boxes to be placed inside the lobby for visitors and employees to store their electronic digital devices and other prohibited items. The architect designed an open lobby leading to interior hallways, an elevator and access to the stairways. He placed the access control system central processing unit (CPU) behind the visit control desk. Typically, the CPU is located in the dispatch center. As a result, which of the following is true regarding the placement of the CPU? A. It may remain in the building lobby because the doors serve as adequate access control. B. It must be in an area designated as a Restricted Area. C. It must be in an area designated as a Sensitive Comp True - Answers True or False. Hinge pins that are located on the exterior side of emergency exit doors in the SAPF must be spot welded or have set screws installed to prevent removal of the door. C. Bollard or berm - Answers Which of the following man-made barriers could be an appropriate measure to impede vehicle passage between the parking lot and the building? A. Bollard or chain link fence B. Berm or moat C. Bollard or berm D. Berm or chain link fence The five steps in the DoD risk management model - Answers 1. Assess Assets 2. Assess Threats 3. Assess Vulnerabilities 4. Assess Risks 5. Determine Countermeasures Three core components of the risk assessment process - Answers 1. Asset criticality 2. Threat assessment 3. Vulnerability assessment Physical security survey - Answers A formal, recorded assessment of an installation's overall security program Physical security inspection - Answers A formal, recorded compliance of physical procedures and measures implemented by a unit or activity to protect its assets DoD Component Commanders - Answers Who makes the determination of when physical security surveys and inspections are required? The reason access control measures are contingent on threat levels - Answers Based on threat levels, commanders or directors are responsible for enhancing access control measure to their installations and facilities. Visitor identification control methods used to effectively control access to facilities - Answers The process to ensure only authorized personnel and materials enter and exit from an installation or facility by identifying, verifying, and authenticating. Three different types of approved classified material storage areas. - Answers 1. GSA-approved storage containers 2. Vaults (including modular vaults) 3. Open storage area (secure rooms, to include SCIFs and bulk storage areas) Construction requirements for vault doors - Answers 1. Constructed of metal 2. Hung on non-removable hinge pins or with interlocking leaves. 3. Equipped with a GSA-approved combination lock. 4. Emergency egress hardware (deadbolt or metal bar extending across width of door).

Mostrar más Leer menos
Institución
SPēD SAPPC
Grado
SPēD SAPPC









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
SPēD SAPPC
Grado
SPēD SAPPC

Información del documento

Subido en
7 de abril de 2025
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

SPēD SAPPC - PHYSEC EXAM QUESTIONS AND ANSWERS GRADED A+

B. It must be in an area designated as a Restricted Area - Answers When designing a new multi-story
government Special Access Program Facility (SAPF), the architect provided identical drawings for two
three-story buildings to the security officer. One drawing is for a building on the installation to be
occupied only by contracting Company X. The other is for the command headquarters building on the
installation.The design reveals floor-to-ceiling windows on the second floor for the main conference
rooms and front office staff. The drawings indicate a parking lot adjacent to the building separated by a
four-foot-wide, handicap-accessible sidewalk. The architect placed emergency exits and stairwells at
each end of the building with door hardware on the exterior to facilitate access/egress. The floor plans
show interior office and conference room doors with GSA-approved locks and connectivity to the
building access control badge system. The front door drawings indicate a large safety glass key lock entry
door with the unit logo and designation etched in the glass. The single entry door provides access into
the building lobby where visit control staff will greet people and in-process visitors. The plans identify
lock boxes to be placed inside the lobby for visitors and employees to store their electronic digital
devices and other prohibited items. The architect designed an open lobby leading to interior hallways,
an elevator and access to the stairways. He placed the access control system central processing unit
(CPU) behind the visit control desk. Typically, the CPU is located in the dispatch center.



As a result, which of the following is true regarding the placement of the CPU?



A. It may remain in the building lobby because the doors serve as adequate access control.



B. It must be in an area designated as a Restricted Area.



C. It must be in an area designated as a Sensitive Comp

True - Answers True or False. Hinge pins that are located on the exterior side of emergency exit doors in
the SAPF must be spot welded or have set screws installed to prevent removal of the door.

C. Bollard or berm - Answers Which of the following man-made barriers could be an appropriate
measure to impede vehicle passage between the parking lot and the building?



A. Bollard or chain link fence

, B. Berm or moat



C. Bollard or berm



D. Berm or chain link fence

The five steps in the DoD risk management model - Answers 1. Assess Assets

2. Assess Threats

3. Assess Vulnerabilities

4. Assess Risks

5. Determine Countermeasures

Three core components of the risk assessment process - Answers 1. Asset criticality

2. Threat assessment

3. Vulnerability assessment

Physical security survey - Answers A formal, recorded assessment of an installation's overall security
program

Physical security inspection - Answers A formal, recorded compliance of physical procedures and
measures implemented by a unit or activity to protect its assets

DoD Component Commanders - Answers Who makes the determination of when physical security
surveys and inspections are required?

The reason access control measures are contingent on threat levels - Answers Based on threat levels,
commanders or directors are responsible for enhancing access control measure to their installations and
facilities.

Visitor identification control methods used to effectively control access to facilities - Answers The
process to ensure only authorized personnel and materials enter and exit from an installation or facility
by identifying, verifying, and authenticating.

Three different types of approved classified material storage areas. - Answers 1. GSA-approved storage
containers

2. Vaults (including modular vaults)

3. Open storage area (secure rooms, to include SCIFs and bulk storage areas)
$10.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TutorJosh Chamberlain College Of Nursing
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
359
Miembro desde
1 año
Número de seguidores
16
Documentos
29332
Última venta
7 horas hace
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3.6

55 reseñas

5
19
4
14
3
12
2
0
1
10

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes