Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 14 páginas
Examen

Virginia hic Exam Questions with correct Answers

Document preview thumbnail
Vista previa 2 fuera de 14 páginas

Virginia hic Exam Questions with correct Answers A door frame consists of what parts? - ANSWER-2 side jambs, One head, & surrounding assembly .A lengthwise grain separation between or through the growth rings of lumber is called a - ANSWER-Shake (c 326) .A third stairway stringer should be used when the stair width exceeds - ANSWER-30 inches .A vapor retarder on blanket installation MUST - ANSWER-Face the warm side of the wall .Actual standard size of a concrete block? - ANSWER-7 5/8 x 7 6/8 x 13 5/8 .Any person working above ____ ft in height shall require guardrails or other fall prevention - ANSWER-6 .Building codes requires a window area not less than ______ percent of total floor area? - ANSWER-8 .Concrete with a clump of 4" can be used for _______ - ANSWER-Flatwork .Damp proofing on below-grade masonry foundation walls shall extend from the top of the footing to - ANSWER-6 inches above the finished grade .Door casing should be - ANSWER-Nailed to trimmer stud and then chalked to the wall .Employee brought his own tools to work, who's responsible for the tools safety Employer or the employee - ANSWER-Employer .Fiber cement siding for exterior weather wall, the minimum thickness should be - ANSWER-5/16 inches (R703.3) .Flexible insulation placed in floor joists above an unheated crawl space should - ANSWER-Be well supported between joists/using a wire mesh or rigid board (c 904-5) .For multiple-width masonry what is the MINIMUM thickness of grout between masonry units and reinforcements - ANSWER-1/4 inch .Guards on open sided walking surfaces need to be located more than________measured vertically to the floor - ANSWER-6 feet .High wind area how many fasteners per shingle - ANSWER-6 fasteners .How far should the screws be placed on a 3/8 ceiling drywall Applica adhesive? - ANSWER-16 .How is furring installed on horizontal vinyl siding? - ANSWER-Strips should be installed vertically and completely around doors and windows .How is the hand of a door determined? - ANSWER-By the location of the hinges when the door is viewed from the inside. .How long must concrete cure before installing wood floors? - ANSWER-60 days .How MUST rafters be framed to each other - ANSWER-Gusset plate (R802.3) .How should board and batten be installed? - ANSWER-1 inch overlap 10d nails .How should radiant heat barrier be installed - ANSWER-Either rafters (1st choice)/ perforated .Ice dam protection needs to be _________ from the edge of eaves - ANSWER-24 inches (R905.1.2) .In a ceiling batt insulation where is the vapor retarder placed? - ANSWER-Against the back of ceiling finish .In a crawl space how far from the floor joints do you need to place vapor retarder - ANSWER-Top Soil .In a crawl space, what kind of vapor retarder should be used? - ANSWER-6 mil or 8 mil .In a mortar mixture an example of a component in hydrated lime is __________ - ANSWER-Chalk .In a trench what is the minimum that a side step fixed ladder exterior platform? - ANSWER-30 inches .In a Vinyl soffit installation what type of accessory is used - ANSWER-J or F Channel (c 677) .In drywall, what is J-trim used for? - ANSWER-to provide a finish edge .In which direction should drywall be fastened to steel studs? - ANSWER-In one direction only .increasing the slump of concrete - ANSWER-increases the wetness .MINIMUM distance between screws on 1/2 inch drywall - ANSWER-12 inches (c 924) .Nails used to fasten concrete roofing tiles must penetrate the deck a MINIMUM of how many inches? - ANSWER-3/4 inch .Notches may not be located in the ____________ of a joist span - ANSWER-Middle 1/3 .On a fire rated exterior door the hardware including latching force may not exceed _______ Ibs - ANSWER-15 lbs .OSHA requires that guardrails be placed between __________ and _________ above scaffold planks - ANSWER-38,45 .Prior to the installation of wood floor how long for acclimation? - ANSWER-4-5 days

Vista previa del contenido

Virginia hic Exam Questions with correct Answers


A door frame consists of what parts? - ANSWER-2 side jambs, One head, &
surrounding assembly



.A lengthwise grain separation between or through the growth rings of lumber is
called a - ANSWER-Shake (c 326)



.A third stairway stringer should be used when the stair width exceeds - ANSWER-30
inches



.A vapor retarder on blanket installation MUST - ANSWER-Face the warm side of the
wall



.Actual standard size of a concrete block? - ANSWER-7 5/8 x 7 6/8 x 13 5/8



.Any person working above ____ ft in height shall require guardrails or other fall
prevention - ANSWER-6



.Building codes requires a window area not less than ______ percent of total floor
area? - ANSWER-8



.Concrete with a clump of 4" can be used for _______ - ANSWER-Flatwork



.Damp proofing on below-grade masonry foundation walls shall extend from the top

, of the footing to - ANSWER-6 inches above the finished grade



.Door casing should be - ANSWER-Nailed to trimmer stud and then chalked to the
wall



.Employee brought his own tools to work, who's responsible for the tools safety
Employer or the employee - ANSWER-Employer



.Fiber cement siding for exterior weather wall, the minimum thickness should be -
ANSWER-5/16 inches (R703.3)



.Flexible insulation placed in floor joists above an unheated crawl space should -
ANSWER-Be well supported between joists/using a wire mesh or rigid board (c 904-5)



.For multiple-width masonry what is the MINIMUM thickness of grout between
masonry units and reinforcements - ANSWER-1/4 inch



.Guards on open sided walking surfaces need to be located more
than________measured vertically to the floor - ANSWER-6 feet



.High wind area how many fasteners per shingle - ANSWER-6 fasteners



.How far should the screws be placed on a 3/8 ceiling drywall Applica adhesive? -
ANSWER-16

Información del documento

Subido en
28 de marzo de 2025
Número de páginas
14
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$9.98

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Docwyne6
3.5
(6)
Vendido
33
Seguidores
11
Artículos
1700
Última venta
2 semanas hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes