100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

GUIDEWIRE ASSOCIATE EXAM QUESTIONS WITH COMPLETE ANSWERS

Puntuación
-
Vendido
-
Páginas
7
Grado
A+
Subido en
28-02-2025
Escrito en
2024/2025

GUIDEWIRE ASSOCIATE EXAM QUESTIONS WITH COMPLETE ANSWERS

Institución
Wire
Grado
Wire









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Wire
Grado
Wire

Información del documento

Subido en
28 de febrero de 2025
Número de páginas
7
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

GUIDEWIRE ASSOCIATE EXAM
QUESTIONS WITH COMPLETE
ANSWERS
What is the purpose of integration? - Answer-Integration allows two systems to
exchange data or perform work.

Why is it important for non-developers to have a basic understanding of integration? -
Answer-Non-developers assist with documenting requirements including data mapping
between the two systems and UI changes and communicate the requirements to
developers.

Name some common examples of InsuranceSuite integrations. - Answer-User
authentication
Geocoding
Check printing
Document production
Document management
Address verification

What tasks are commonly performed by non-developers for integrations? - Answer-
Non-developers often prepare data mapping documents and screen mockups needed
to support integration development.

Which phases in the Guidewire project lifecycle are divided into sprints? - Answer-
Inception
Development
Stabalization

What is the typical duration of a sprint in the Inception phase? - Answer-One week

During the Stabilization phase, what is the purpose of performance testing? - Answer-
Run tests to check how well the system works in anticipated and peak loads.

During the Deployment phase, what happens during the Pilot step? - Answer-- Allow a
subset of users to use the system
- Gather feedback
- Triage feedback
- Implement changes as needed

During the support phase, who is responsible for monitoring business processes? -
Answer-Support team

, What are the Project Manager's responsibilities? - Answer-Support the sprint team,
facilitate the agile process, enable self-organization, resolve impediments, shield
outside interference, is a participatory leader and not a dictating manager; servant
leader

What are the Product Owner's responsibilities? - Answer-Key stakeholder representing
the voice of the customer, business authority to make decisions (can delegate to key
SMEs), shares vision with the development team, collaborates with the teams to
develop and deliver the work, defines requirements and answers the development
team's questions promptly and with authority, responsible for signing off on user stories
and defects.

Who are the most common team members? - Answer-Business Analysts
Developers
Quality Analysts and Testers

What is a user story? - Answer-A high level set of requirements from a user's
perspective.

What are the three components of a user story? - Answer-A role, an action, and a
reason.

What does it mean to elaborate a user story? - Answer-Conversations occur between
the users and the team to ensure all requirements are understood.

What is the importance of acceptance criteria? - Answer-It tells us when a user story is
done.

Who uses the acceptance criteria during a sprint? - Answer-Everyone: Business
Analysts, Developers, Testers, and Product Owner.

What is the best practice for project planning? - Answer-Plan for what you know and re-
evaluate your plan as needed.

What is theme? - Answer-A common process with each product.

Themes are broken down into what components? - Answer-Features, user stories, and
tasks.

What does Guidewire provide as a starting point for your project? - Answer-Guidewire
provides approximately 5000 reusable assets/tools to facilitate progress during the
implementation project.

What does Guidewire mean by Inception? - Answer-Guidewire projects include an
inception phase to confirm the scope of the project, produce an initial sizing, and create
the project baseline.
$14.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Thumbnail
Package deal
GUIDEWIRE EXAM BUNDLE
-
20 2025
$ 296.30 Más información

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Studyguidenotes Boston University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
14
Miembro desde
1 año
Número de seguidores
0
Documentos
1352
Última venta
2 semanas hace

2.7

3 reseñas

5
1
4
0
3
0
2
1
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes