ECBCIP321 Exam Questions and Answers
1.You are the NACE Coating Inspector on a tank lining project and
are asked to perform a high voltage holiday test after the coating
applicators have completed their final repairs. After meeting all the
confined space entry permit you enter the tank and notice a very
strong odor of solvent. Your first course of action should to: - - -
correct answer ✅Exit the tank immediately and report the
problem to the nearest safety supervisor
2.You are working as an inspector in a galvanizing plant for the first
time. What are some of the hazards you need to be aware of: - - -
correct answer ✅Risk of skin burn, Risk of acid or caustic splashes.
3.You are working as the only in-house NACE Level 2 Inspector in a
shop setting when an independent 3rd party NACE Level 3
Inspector, representing the owner, presents you with a copy of a
Non Conformance Report (NCR) he has written for a NACE2/SSPC
SP 10 centrifugal blast which you had previously approved. Your
FIRST preferred course of action is to: - - -
correct answer ✅Consult your supervisor
4.An Inspection and Test Plan is required when: - - -
correct answer ✅It is always required
,ECBCIP321 Exam Questions and Answers
5.The Inspectors' goal at the Pre-Job Conference is to: - - -
correct answer ✅Obtain a clear understanding of the Specification
6.Coating Surveys are legally required: - - -
correct answer ✅On commercial marine vessels and offshore
platforms
7.Individuals conducting Coating Surveys should: - - -
correct answer ✅Always be trained and experienced Coating
Industry
8.The cost of qualified Coating Inspection is normally offset by: - - -
correct answer ✅Lower Coating Life Cycle Costs
9.You are a NACE Level 2 Coating Inspector who has just arrived on
a job in progress where there is no Inspection and Test Plan (ITP).
The first moming you arrive the job is behind schedule and you are
asked to take DIY Film Thickness readings. Your FIRST preferred
course of action is to: - - -
correct answer ✅Use a generally accepted industry standard and
to take readings
, ECBCIP321 Exam Questions and Answers
10.When conducting inspections the Inspector should follow which
standards: - - -
correct answer ✅The specified standards
You are the NACE Level 2 Coating Inspector where SSPC PA 2 has
been specified with an additional requirement that no individual
gauge reading shall be belowa certain value. As this is not part of
the standard you should: - - -
correct answer ✅Enforce the additional requirement
12.The coating applicator has ignored a enface preparation hold
point and applied coating over the surface without a sign off from
you as the inspector. Your FIRST preferred course of action is to: - - -
correct answer ✅Require the Applicator to remove the coating
13.In the event of a conflict between the Product Data Sheet and
the Specification: - - -
correct answer ✅The Specification prevails
14.From a corrosion perspective, the main difference between
Ferrous and Non-Ferrous Metals is: - - -
correct answer ✅Iron content
1.You are the NACE Coating Inspector on a tank lining project and
are asked to perform a high voltage holiday test after the coating
applicators have completed their final repairs. After meeting all the
confined space entry permit you enter the tank and notice a very
strong odor of solvent. Your first course of action should to: - - -
correct answer ✅Exit the tank immediately and report the
problem to the nearest safety supervisor
2.You are working as an inspector in a galvanizing plant for the first
time. What are some of the hazards you need to be aware of: - - -
correct answer ✅Risk of skin burn, Risk of acid or caustic splashes.
3.You are working as the only in-house NACE Level 2 Inspector in a
shop setting when an independent 3rd party NACE Level 3
Inspector, representing the owner, presents you with a copy of a
Non Conformance Report (NCR) he has written for a NACE2/SSPC
SP 10 centrifugal blast which you had previously approved. Your
FIRST preferred course of action is to: - - -
correct answer ✅Consult your supervisor
4.An Inspection and Test Plan is required when: - - -
correct answer ✅It is always required
,ECBCIP321 Exam Questions and Answers
5.The Inspectors' goal at the Pre-Job Conference is to: - - -
correct answer ✅Obtain a clear understanding of the Specification
6.Coating Surveys are legally required: - - -
correct answer ✅On commercial marine vessels and offshore
platforms
7.Individuals conducting Coating Surveys should: - - -
correct answer ✅Always be trained and experienced Coating
Industry
8.The cost of qualified Coating Inspection is normally offset by: - - -
correct answer ✅Lower Coating Life Cycle Costs
9.You are a NACE Level 2 Coating Inspector who has just arrived on
a job in progress where there is no Inspection and Test Plan (ITP).
The first moming you arrive the job is behind schedule and you are
asked to take DIY Film Thickness readings. Your FIRST preferred
course of action is to: - - -
correct answer ✅Use a generally accepted industry standard and
to take readings
, ECBCIP321 Exam Questions and Answers
10.When conducting inspections the Inspector should follow which
standards: - - -
correct answer ✅The specified standards
You are the NACE Level 2 Coating Inspector where SSPC PA 2 has
been specified with an additional requirement that no individual
gauge reading shall be belowa certain value. As this is not part of
the standard you should: - - -
correct answer ✅Enforce the additional requirement
12.The coating applicator has ignored a enface preparation hold
point and applied coating over the surface without a sign off from
you as the inspector. Your FIRST preferred course of action is to: - - -
correct answer ✅Require the Applicator to remove the coating
13.In the event of a conflict between the Product Data Sheet and
the Specification: - - -
correct answer ✅The Specification prevails
14.From a corrosion perspective, the main difference between
Ferrous and Non-Ferrous Metals is: - - -
correct answer ✅Iron content