SWM Plan Reviewer Module
1 V5.0 Questions And Correct
Answers
infiltration - answer water soaks into the ground
transpiration - answer water absorbed by plants
groundwater recharge - answer water migrates into the
groundwater 1a
Construction BMPs - answer structural and non-structural practices
used during construction for sediment control 1a
Pollution Prevention - answer Good Housekeeping Practices 1a
P-BMPs - answer Structural and non-structural practices used to
control quantity and quality of post construction runoff 1a
VPDES or construction general permit - answer required
authorization of discharges of stormwater from construction over 1
ac. 1a
VESMP - answer Program established by a VESMP authority to
control erosion and sediment resulting from land disturbance. 1b
VESMP Authority - answer DEQ or a locality that operates a VESMP
1b
, Who must administer VESCP - answer counties and cities 1b
Who may administer VESCP - answer towns 1b
Who must administer VESMP - answer MS4 permit localities 1b
Who may administer VESMP - answer Counties, cities, towns 1b
Regulated land disturbing activities include - answer >1ac, part of
larger common plan of devel.,<2500 sf on CBPA, 10,000-1ac, more
stingent areas 1b
Exempt from E&S and SWM - answer minor land dist., service
connection repairs, underground util, septic/drainfield, mining, ag,
poles, shoreline erosion, trains, emergencies 1b
Roles of the Program Administrator - answer staff certifications,
ordinances meet reg requirments, administer apps, oversee insp.,
coordinate enforcement, retain records, submit reports 1c
Roles of Inspector - answer conduct insp, document insp, initiate
enforcment, ensure compliance 1c
Roles of Plan Reviewer - answer Review ESM plans to sensure
adherence to regs and ords. 1c
Roles of Combines Admin - answer performing duties of Program
Admin, Inspector, and Plan reviewer 1c
How to become elegible to take the test - answer 1. DEQ Training
course; 2 800 hours 1c
1 V5.0 Questions And Correct
Answers
infiltration - answer water soaks into the ground
transpiration - answer water absorbed by plants
groundwater recharge - answer water migrates into the
groundwater 1a
Construction BMPs - answer structural and non-structural practices
used during construction for sediment control 1a
Pollution Prevention - answer Good Housekeeping Practices 1a
P-BMPs - answer Structural and non-structural practices used to
control quantity and quality of post construction runoff 1a
VPDES or construction general permit - answer required
authorization of discharges of stormwater from construction over 1
ac. 1a
VESMP - answer Program established by a VESMP authority to
control erosion and sediment resulting from land disturbance. 1b
VESMP Authority - answer DEQ or a locality that operates a VESMP
1b
, Who must administer VESCP - answer counties and cities 1b
Who may administer VESCP - answer towns 1b
Who must administer VESMP - answer MS4 permit localities 1b
Who may administer VESMP - answer Counties, cities, towns 1b
Regulated land disturbing activities include - answer >1ac, part of
larger common plan of devel.,<2500 sf on CBPA, 10,000-1ac, more
stingent areas 1b
Exempt from E&S and SWM - answer minor land dist., service
connection repairs, underground util, septic/drainfield, mining, ag,
poles, shoreline erosion, trains, emergencies 1b
Roles of the Program Administrator - answer staff certifications,
ordinances meet reg requirments, administer apps, oversee insp.,
coordinate enforcement, retain records, submit reports 1c
Roles of Inspector - answer conduct insp, document insp, initiate
enforcment, ensure compliance 1c
Roles of Plan Reviewer - answer Review ESM plans to sensure
adherence to regs and ords. 1c
Roles of Combines Admin - answer performing duties of Program
Admin, Inspector, and Plan reviewer 1c
How to become elegible to take the test - answer 1. DEQ Training
course; 2 800 hours 1c