100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

NRA Test Questions and Answers Latest Version 2025

Puntuación
-
Vendido
-
Páginas
24
Grado
A+
Subido en
22-02-2025
Escrito en
2024/2025

NRA Test Questions and Answers Latest Version 2025

Institución
NRA Basic Pistol Shooting
Grado
NRA Basic Pistol Shooting










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
NRA Basic Pistol Shooting
Grado
NRA Basic Pistol Shooting

Información del documento

Subido en
22 de febrero de 2025
Número de páginas
24
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

NRA Test Questions and Answers Latest
Version 2025


What is the frequency that system restoration training for operators is required? -
ANSWER Annually



What is the purpose of annual operator system restoration training? - ANSWER
To assure proper execution of its restoration plan



Name 4 things required in annual operator system restoration training: - ANSWER
System restoration plan including coordination with RC and GO; Restoration
Priorities; Building of cranking paths; Synchronizng



How often and how much training is required for field switching personnel who are
included in the system restoration plan? - ANSWER Minimum 2 hrs every 2 years



When must a TO or GO participate in RC restoration drills, exercises or simulations? -
ANSWER As requested by the RC



What is a Blackstart Resource Agreement? - ANSWER This is an agreement between a
TO and GO that includes the terms and conditions of the use of the Blackstart Unit;
e.g. procedures, protocols, testing requirements



What is required by each GO for their Blackstart Resources? - ANSWER
Documented procuedures for starting each resource and energizing a bus

,Who must a GO notify if a Blackstart Resource ability to perform its function is
changed? - ANSWER The TO who holds the agreement



What is the time requirement for a GO to notify its TO when a Blackstart
Resource capabilities are compromised? - ANSWER 24 Hours



Who is required to perform the agreed upon testing of a Blackstart Resource? - ANSWER
The GO



What minimum information should be recorded for a Blackstart Resource test? -
ANSWER Name of Resource, unit tested, date of test, duration of test, time required to
start, and any test requirements not met



If requested by a TO or RC, when must Blackstart Resource test results be produced?
- ANSWER The GO has 30 days to provide test results to its TO or RC



How much time and how frequently must a GO train its personnel on starting a
Blackstart Resource and energizing a bus? - ANSWER 2 hours every 2 years minimum



What two things must be included in the GO Blackstart Resource biannual training?
- ANSWER The system restoration plan including coordination with the TO; The
procedures associated with the Blackstart Resource Agreement



What must each RC have in regard to restoration? - ANSWER Each RC is required to have
an RC Area Restoration Plan.

, Name the three things covered in the RC Area Restoration Plan? - ANSWER
Blackstart Resources used to re-energize a shut down area of the BES; separation has
occurred between neighboring RC; An energized island has been formed on the BES



When does the RC exit the Restoration plan? - ANSWER All TO are interconnected its RC
area is connected to all neighboring RC



What 9 things are included in the RC restoration plan? - ANSWER High level strategy;
Operating process to restore Interconnection; coordination elements between TO
restoration plans; elements between RC plans; criteria and condition for reestablishing
interconnections (TO-TO in the RC; TO-TO w/ other RC; w/ Other RC); Reporting
requirements; Criteria for info sharing w/ neighboring RC and TO/BA in its area; RC as
main contact for all parties; Criteria to transfer operations & authority back to BA



Who is in control during system restoration? - ANSWER RC



Who is given control after a system restoration has been completed? - ANSWER The
appropriate BA



To who must an RC distribute its RC Area Restoration Plan? - ANSWER Each of its TO,
neighboring RC



When must an RC distribute its RC Area Restoration Plan? - ANSWER Within 30 days of
creation or revision of the plan



How often must the RC review its restoration plan? - ANSWER Within 13 months from
last review


Who reviews an RC Restoration plan? - ANSWER The neighboring RC

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
KenAli West Virginia University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
84
Miembro desde
1 año
Número de seguidores
5
Documentos
17177
Última venta
2 semanas hace

2.9

19 reseñas

5
4
4
4
3
4
2
0
1
7

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes