The _________ consists of daily checks of the work to assure continuing compliance
with contract requirements - ✔✔✔-Follow-up Phase
Design-Build contracts require - ✔✔✔-The QC Manager to be in place and take an
active role in the review and coordination of the design.
Which of the following is included in all three phases of the Three Phases of
Control? - ✔✔✔-Safety
The purpose of Construction Quality Management is to - ✔✔✔-Achieve the quality
established by properly developed requirements through the combined
responsibility, but separate, efforts of contractors and government personnel
Testing is extremely important in construction quality management and is
performed by - ✔✔✔-Both the contractor and the government
The primary purpose of the Three-Phase Control System is to - ✔✔✔-Require the
contractor to plan, schedule, and perform quality management actions to assure
work meets all specified quality standards
Quality Assurance Personnel have the responsibility to - ✔✔✔-Require the
contractor to maintain the quality specified in the plans and specifications
The _________________ is the appropriate time to assure that all materials and/or
equipment have been tested, submitted, and approved - ✔✔✔-Preparatory Phase
The Preconstruction Conference and Coordination and Mutual Understanding
Meeting Are - ✔✔✔-Conducted prior to the commencement of any physical
construction work
©®™ Page 1
, Construction Quality Management for Contractors Exam Questions And Answers Latest Update
Contractor testing procedures: - ✔✔✔-Are specified in the technical specs, outlined
in the QCP, and addressed at Coordination and Mutual Understanding Meeting
The Quality Control Plan contains - ✔✔✔-Identification of individual quality quality
control personnel, including name, qualifications, assigned duties, responsibilities
and authorities.
Tests that are unannounced, randomly performed, and repeat quality control tests
are - ✔✔✔-Quality assurance tests
The contractor is required to conduct a Preparatory Phase Meeting before they
begin any definable feature of work except when - ✔✔✔-There are no exceptions to
the rule
During the punch-out inspection of a project: - ✔✔✔-Quality Control personnel
prepare and punch-list and make corrections
The Quality Control Report should include - ✔✔✔-All of the above
In a design build contract, if the contractor has a question about the design, what
is the process to get an answer? - ✔✔✔-Contractor submits a design verification
request to the contractor's design team
Submittals are - ✔✔✔-Necessary to demonstrate that the proposed materials, etc.
are in compliance with the contract.
The success or failure of all contractors is based upon - ✔✔✔-The ability to control
costs, finance work, estimate jobs, schedule the work and maintain effective
quality control
©®™ Page 2
Construction Quality Management for Contractors
Exam Questions And Answers Latest Update
The _________ consists of daily checks of the work to assure continuing compliance
with contract requirements - ✔✔✔-Follow-up Phase
Design-Build contracts require - ✔✔✔-The QC Manager to be in place and take an
active role in the review and coordination of the design.
Which of the following is included in all three phases of the Three Phases of
Control? - ✔✔✔-Safety
The purpose of Construction Quality Management is to - ✔✔✔-Achieve the quality
established by properly developed requirements through the combined
responsibility, but separate, efforts of contractors and government personnel
Testing is extremely important in construction quality management and is
performed by - ✔✔✔-Both the contractor and the government
The primary purpose of the Three-Phase Control System is to - ✔✔✔-Require the
contractor to plan, schedule, and perform quality management actions to assure
work meets all specified quality standards
Quality Assurance Personnel have the responsibility to - ✔✔✔-Require the
contractor to maintain the quality specified in the plans and specifications
The _________________ is the appropriate time to assure that all materials and/or
equipment have been tested, submitted, and approved - ✔✔✔-Preparatory Phase
The Preconstruction Conference and Coordination and Mutual Understanding
Meeting Are - ✔✔✔-Conducted prior to the commencement of any physical
construction work
©®™ Page 1
, Construction Quality Management for Contractors Exam Questions And Answers Latest Update
Contractor testing procedures: - ✔✔✔-Are specified in the technical specs, outlined
in the QCP, and addressed at Coordination and Mutual Understanding Meeting
The Quality Control Plan contains - ✔✔✔-Identification of individual quality quality
control personnel, including name, qualifications, assigned duties, responsibilities
and authorities.
Tests that are unannounced, randomly performed, and repeat quality control tests
are - ✔✔✔-Quality assurance tests
The contractor is required to conduct a Preparatory Phase Meeting before they
begin any definable feature of work except when - ✔✔✔-There are no exceptions to
the rule
During the punch-out inspection of a project: - ✔✔✔-Quality Control personnel
prepare and punch-list and make corrections
The Quality Control Report should include - ✔✔✔-All of the above
In a design build contract, if the contractor has a question about the design, what
is the process to get an answer? - ✔✔✔-Contractor submits a design verification
request to the contractor's design team
Submittals are - ✔✔✔-Necessary to demonstrate that the proposed materials, etc.
are in compliance with the contract.
The success or failure of all contractors is based upon - ✔✔✔-The ability to control
costs, finance work, estimate jobs, schedule the work and maintain effective
quality control