The process whereby the physical design specifications created by the
design team are turned into working computer code by the programming
team is referred to as:
A) coding.
B) testing.
C) implementation.
D) code conversion.
E) production. - answer A) coding.
The deliverables from the coding, testing, and installation processes
include:
A) the creation of a document that will consolidate the information that
must be considered when implementing a physically distributed systems
design.
B) structured descriptions and diagrams that outline the logic contained
within each DFD process.
C) the code, program documentation, test scenarios and test data, results
of program and system testing, user guides, user training plan, and an
installation and conversion plan.
D) all of the above.
E) none of the above. - answer C) the code, program documentation, test
scenarios and test data, results of program and system testing, user
guides, user training plan, and an installation and conversion plan.
A strategy for training users so they can quickly learn the new system is
a(n):
, A) training plan.
B) installation plan.
C) user guide.
D) training curriculum.
E) electronic performance support system. - answer A) training plan.
Training on the use of the system begins during the early stages of:
A) the systems analysis phase.
B) logical design.
C) implementation.
D) the systems planning and selection phase.
E) physical design. - answer C) implementation.
This plan lays out a strategy for moving from the old system to the new.
A) Systems service request
B) Installation plan
C) Training plan
D) Testing plan
E) Conversion guide - answer B) Installation plan
Activities occurring within maintenance include:
A) transforming requests into changes.
B) obtaining maintenance requests.
C) implementing changes.
D) designing changes.
E) all of the above. - answer E) all of the above.
An overall test plan is developed during:
A) systems implementation.
B) systems analysis.
questions and
answers(verified for
accuracy)
The process whereby the physical design specifications created by the
design team are turned into working computer code by the programming
team is referred to as:
A) coding.
B) testing.
C) implementation.
D) code conversion.
E) production. - answer A) coding.
The deliverables from the coding, testing, and installation processes
include:
A) the creation of a document that will consolidate the information that
must be considered when implementing a physically distributed systems
design.
B) structured descriptions and diagrams that outline the logic contained
within each DFD process.
C) the code, program documentation, test scenarios and test data, results
of program and system testing, user guides, user training plan, and an
installation and conversion plan.
D) all of the above.
E) none of the above. - answer C) the code, program documentation, test
scenarios and test data, results of program and system testing, user
guides, user training plan, and an installation and conversion plan.
A strategy for training users so they can quickly learn the new system is
a(n):
, A) training plan.
B) installation plan.
C) user guide.
D) training curriculum.
E) electronic performance support system. - answer A) training plan.
Training on the use of the system begins during the early stages of:
A) the systems analysis phase.
B) logical design.
C) implementation.
D) the systems planning and selection phase.
E) physical design. - answer C) implementation.
This plan lays out a strategy for moving from the old system to the new.
A) Systems service request
B) Installation plan
C) Training plan
D) Testing plan
E) Conversion guide - answer B) Installation plan
Activities occurring within maintenance include:
A) transforming requests into changes.
B) obtaining maintenance requests.
C) implementing changes.
D) designing changes.
E) all of the above. - answer E) all of the above.
An overall test plan is developed during:
A) systems implementation.
B) systems analysis.