100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

APWA Public works inspection test 3 Updated Version

Puntuación
-
Vendido
-
Páginas
16
Grado
A
Subido en
05-02-2025
Escrito en
2024/2025

APWA Public works inspection test 3 Updated Version

Institución
APWA Public Works Inspection
Grado
APWA Public works inspection










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
APWA Public works inspection
Grado
APWA Public works inspection

Información del documento

Subido en
5 de febrero de 2025
Número de páginas
16
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Public works inspection test 3
APWA
Updated Version

Before permitting the contractor to proceed, the inspector should check that the plans have been approved
j j j j j j j j j j j j j j j




and signed by the engineer -
j j j j j j j




There are four major problem areas in sewer construction which can cause future functional problems and
j j j j j j j j j j j j j j j




expense: poor pipe sub grade, poor joints, poor water consolidation or mechanical compaction of backfill
j j j j j j j j j j j j j j j




and poor records -
j j j j j




Balling a line-The operation of passing an inflated rubber ball, which is slightly less than the diameter of the
j j j j j j j j j j j j j j j j j j




pipe, though a sewer line -
j j j j j j j




House connection sewer- house connection sewers are sometimes referred to as lateral sewer -
j j j j j j j j j j j j j j




Invert- a line on centerline at the inside bottom of a pipe or conduit, also commonly referred to as the flow
j j j j j j j j j j j j j j j j j j j j




line -
j j j




Saddle- a connections to a mainline sewer where no wye or tee exists, made by breaking into it and attaching
j j j j j j j j j j j j j j j j j j j




a specially fabricated spur pipe -
j j j j j j j




Spring line- a circular pipe filled with water to its spring line would be half full -
j j j j j j j j j j j j j j j j j




Soffit- the inside top of a pipe or box-section conduit -
j j j j j j j j j j j




One of the most important elements of excavating for sewer construction is to maintain the specified width
j j j j j j j j j j j j j j j j




of the trench at the top of the pipe -
j j j j j j j j j j j

,Although off centered pipe in the trench is not desirable, it is permitted provided the maximum allowable
j j j j j j j j j j j j j j j j




trench width is not exceeded -
j j j j j j j




Loose material in the bottom of the trench must be removed to solid, undisturbed ground before pipe
j j j j j j j j j j j j j j j j




bedding is placed -
j j j j j




OSHA construction safety orders give minimum requirements - -beware of disturbed ground
j j j j j j j j j j j




-take special precautions where moisture is present
j j j j j j j




-guard against cabing hazard created by vibration and load from highway traffic
j j j j j j j j j j j




-install upper trench jacks first j j j j




-protect all workers in trenches j j j j




Dewatering-ground water may be pumped and discharged into a storm drain or sewer only if so allowed by j j j j j j j j j j j j j j j j j




the storm drain or sewer owner and jurisdiction water quality agency -
j j j j j j j j j j j j j




Survey procedures are established to set stakes for sewer construction on an offset line at intervals of 25
j j j j j j j j j j j j j j j j j




feet -
j j j




Grade sheet details should be read with extreme care -
j j j j j j j j j j




If excessively wet, soft, spongy, unstable or similarly unsuitable material is encountered at the pipe bedding
j j j j j j j j j j j j j j j




depth, the unsuitable material must be removed and be replaced with imported bedding material to
j j j j j j j j j j j j j j j




provide a stable foundation -
j j j j j j




Adequate measures must be taken to avoid floating the pipe or to deflect it laterally when placing and
j j j j j j j j j j j j j j j j j




consolidating the concrete -
j j j j j




Pipe Laying and Jointing- The inspector must check the plans for locations of tees and wyes for house
j j j j j j j j j j j j j j j j j




connections. Tees should be located at the station or to the nearest joint downstream of the house
j j j j j j j j j j j j j j j j j




connection end -
j j j j




All bell and spigot pipe should be laid upgrade, with the bell ends of the pipe pointed upstream -
j j j j j j j j j j j j j j j j j j j

, A line should be pulled across a minimum of three pipes or stations for the line and grade check -
j j j j j j j j j j j j j j j j j j j j




As a general rule, concrete bottom slabs for manholes will be placed at least 24 hrs before any brick is laid
j j j j j j j j j j j j j j j j j j j j




there on -
j j j j




Improperly placed stubs require expensive manhole remodeling when future sewers are constructed. Steps
j j j j j j j j j j j j




are not installed, maintenance forces use portable ladders -
j j j j j j j j j j




The jet pipe should be kept at least 2 ft away from the pipeline since the bedding maybe washed from under
j j j j j j j j j j j j j j j j j j j j




the pipe -
j j j j




Procedural requirements- permanent resurfacing will normally be withheld pending completion of the air
j j j j j j j j j j j j




test -
j j j




Local depressions- a warped surface of gutter or pavement which diverts water flow more efficiently into an
j j j j j j j j j j j j j j j j




adjacent catch basin inlet -
j j j j j j




Longitudinal seams should be placed at the sides of the pipe - j j j j j j j j j j j j




Stulls or struts are required to support the arch of CMP during the placement and compaction of backfill -
j j j j j j j j j j j j j j j j j j j




Bushing- Protect cable or conductor insulation from damage j j j j j j j j




Conduit- a metal tube in which electric conductors are installed for protection
j j j j j j j j j j j j




Electrolier-street light assembly complete, including foundation, electrolier standard, luminaire arm, j j j j j j j j j




luminaire, etc
j j




Luminaire- the lamp housing including the optical and socket assemblies(and ballast if so specified)
j j j j j j j j j j j j j
$8.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
TESTB

Conoce al vendedor

Seller avatar
TESTB Chamberlain College Of Nursing
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
3
Miembro desde
1 año
Número de seguidores
0
Documentos
251
Última venta
1 mes hace
SMART B

I am a leader in online test prep. I take great pride in our tests and their ability to help you pass your exams. feel free to contact

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes