Solutions.
A slope gradient of 25% (4:1) would indicate that in a horizontal length of 100 feet, the vertical
rise would be ______ feet.
A) 2.5
B) 12.5
C) 25
D) 4 correct answers C) 25
As rain falls to the earth, what is the very first function of vegetation?
A) It reduces detachment
B) It increases infiltration
C) It absorbs rain drop impact
D) Roots hold soil in place correct answers A) It reduces detachment
Because of the likelihood of thunderstorms which is the worst month to schedule land disturbing
activities?
A) April
B) July
C) September
D) October correct answers B) July
Which of the following is not a stage in Erosion and Sedimentation?
A) Detachment
B) Solubility
C) Transport
D) Deposition correct answers B) Solubility
At what depth must sediment be removed from a silt fence barrier?
A) 12 Inches
B) 16 Inches
C) 1/4 full
D) 1/2 full correct answers D) 1/2 full
When straw mulch is used to cover disturbed soil it must be maintained at a depth of ________
inches.
A) 1-2
B) 1-3
C) 2-3
D) 2-4 correct answers D) 2-4
If it is necessary to wash vehicle tires to remove excess sediment, the sediment run-off must be:
A) Kept at the construction exit pad
B) Filtered with hay bales
, C) Directed away from the road with a diversion
D) Directed into an approved sediment trap or sediment basin correct answers C) Directed away
from the road with a diversion
The maintenance requirements for all BMPs are only found in the Field Manual for Erosion and
Sediment Control in Georgia.
A) True
B) False correct answers A) True
All land-disturbing activities covered by the E & SC Act must first secure a Land Disturbing
Activity (LDA) Permit. Who is responsible for obtaining this permit?
A) Design Engineer
B) Building Contractor
C) Owner/ Operator
D) Utility Subcontractor correct answers C) Owner/ Operator
If the local issuing authority's enforcement officer observed a significant amount of sediment
entering state waters from a land disturbing activity the officer should do which of the
following?
A) Issue a strongly worded Notice of Violation
B) Start proceedings for Forfeiture of Bonding
C) Move to revoke the company's business license
D) Issue a Stop Work Order correct answers D) Issue a Stop Work Order
Spillway pipe for a temporary sediment basin cannot be constructed with a pipe smaller than
_____ inches.
A) 6
B) 8
C) 10
D) 12 correct answers B) 8
What is the amount of over fall allowed at the end of the storm drain outlet apron?
A) 1/2 the diameter of the rip rap used
B) Not to exceed 6 inches
C) 1/2 the thickness of the apron
D) Zero correct answers D) Zero
What size rocks should be used to fill gabion boxes?
A) 3 to 4 inches
B) 4 to 8 inches
C) Larger than 8 inches
D) Clean aggregate correct answers C) Larger than 8 inches
A diversion constructed of compacted soil can be positioned ________ a slope.
A) Above
B) Across