1 QUESTIONS WITH COMPLETE
SOLUTIONS!!
1 of 90
Term
15) Deficiencies in work done by contractor are compiled on what
type of formal document at end of job?
Give this one a try later!
*****
tell the contractor ?
shop drawings?
, backup and encrypt??? chegg says yes but idk???
Don't know?
2 of 90
Term
3. Who should keep a construction diary?
Give this one a try later!
Only the owner should keep a
construction diary to track Anyone regularly on the
expenses. construction site
Only the project manager should The architect is responsible for
keep a construction diary. maintaining the construction diary.
Don't know?
,3 of 90
Term
12. It is a well-known principle that the engineer should not tell the
contractor how to do the work; but, if the engineer observes that the
contractor's construction methods appear to be unable to meet the
specifications, what should the engineer do?
Give this one a try later!
Tell the contractor ? False ?
Backup and encrypt??? Chegg says yes but idk???
Don't know?
4 of 90
Term
3. Under a construction management (CM) contract, should the CM
firm's responsibilities normally begin at the construction phase, the
design phase, the planning phase, or the conceptual phase?
Give this one a try later!
***** laws? False ?
, Design phase
Chegg says yes but idk???
chegg says planning?
Don't know?
5 of 90
Term
10. Levels of LEED?
Give this one a try later!
Chegg says yes but idk??? Building information model
Certified
Silver
Upon Arriving To Site
Gold
Platinum
Don't know?
6 of 90
Term
14) What is the name for approach to construction cited in text which
evolved from car manufacturing industry?