Actions in low voltage alert? - ANSWER Review transmission & generation outages Request reactive reserve check Heavy load voltage schedule warning purpose is to have members prepare far max support of voltages on the? - ANSWER Bulk Power System Manual load dump warning & reduction of Non-critical plant load issued when? - ANSWER Primary reserve is less the the largest generating unit. Loss of transmission facility jeopardize reliability after all possible measures have been taken to increase reserves

Vista previa del contenido

PJM Generation Cert Correct 100%
Actions in low voltage alert? - ANSWER Review transmission & generation outages
Request reactive reserve check

Heavy load voltage schedule warning purpose is to have members prepare far max
support of voltages on the? - ANSWER Bulk Power System

Manual load dump warning & reduction of Non-critical plant load issued when? -
ANSWER Primary reserve is less the the largest generating unit.
Loss of transmission facility jeopardize reliability after all possible measures have been
taken to increase reserves

Hot weather alert - ANSWER COMED 90
DOM & EKPC 95

PJM issues high system voltage message - ANSWER Gen operators should operate
the lower end of their voltage bandwidth

Primary reserve warning - ANSWER Ensure deffer able Maintenance is halted

General actions PJM takes when conservating ops initiated? - ANSWER Purchase/load
additional reserves
begin studying double contingencies
Lower IROL
Increase # of SOS calls

Purpose of heavy voltage schedule action is to increase reactive reserves - ANSWER
EHV system

National terrorism advisory system 2 types of alerts? - ANSWER Elevated threat
Imminent threat

Non-critical plant load - ANSWER lighting, office area a/c

Purpose of capacity emergency warning? - ANSWER keep members informed of actual
capacity shortages or contingencies that may jeopardize reliability during RT ops

keep all affected system personnel aware of the forecast and actual status of the PJM
RTO

Heavy load voltage schedule action - ANSWER Gen operators- maintain MVAR reserve
on units connected to EHV

,During cold weather action - ANSWER Assume an unavailability rate for scheduled
generation

During terrorism/sabotage emphasis on? - ANSWER Operations & communications

For voltage support PJM can request generator adjustments - ANSWER Direct
adversely affect MW%
Generator to come online for voltage support
Remain online when scheduled to come offline

Unit startup notification Alert - ANSWER Place Gen units ready to be started in 48hrs

Voltage reduction - ANSWER 2.5%-5%

Min Gen Alert implemented when - ANSWER The expected gen level is within 2500mw
of normal min energy limits include
Adjusted min generation, valley & load est, margin values

Min Gen Value - ANSWER Economic Min- Emergency Min= ERG
ERG- emergency reducible generation

Temperature for cold weather Alert - ANSWER 10 degress

During suspected terrorism - ANSWER emphasis on operation and communication

NOAA issues alert at - ANSWER K-5 or higher

Voltage reduction Warning - ANSWER Available synchronized reserves is less than
synchronized reserve requirement

Contact who for suspected terrorism - ANSWER PJM shift supervisor

Cold weather alert - ANSWER PJM assumes certain unavailability rates for generation
amount

Regulation - ANSWER Energy under automatic control that can respond within 5 Min
and to freq changes
Correct for small load changes

Synchronized reserves - ANSWER generators respond within 10 min
increase output from generator
reduction in load from a resource
max output energy of synchronous condensor

Operating Reserves - ANSWER Primary reserve T< or = 10min
Synchronized & quick start reserve

, Supplemental reserve 10<T< or = 30min

On or offline reserves within 15min - ANSWER

operating reserves - ANSWER available with in 30 min

Dispatch rate - ANSWER ($/MWh)

Economic basepoint - ANSWER (MW)

Out of merit operations-off cost - ANSWER Transmission constraints, unit ramp rates or
problems

Manual Dispatch- individual dispatch to resource to alleviate a constraint - ANSWER

Sat phone test - ANSWER Every saturday

Manual dispatch - ANSWER Used if SCED (security constrained economic dispatch)
unavailable

PJM all call communication is? - ANSWER One way

Generators that are not capacity reserves must provide instant power data if - ANSWER
>10mw
>1mw connected to 24Kv+bus

Satilite phone for 500mw + operators data change during - ANSWER

Peak load periods - ANSWER Summer prior to 11EPT
Winter Between 10:30-14:30 EPT

Voltage instabilities are shown by? - ANSWER large changes in voltage with small
changes in load

Reactive capability curves - ANSWER 2 to 8 points

eDart - ANSWER Electronic dispatcher application and reporting tool

Must notify PJM of outages in how long in advance? - ANSWER 30 days

What is the peak maintenance period - ANSWER 24th wed - 36th wed of the year

Planned outage extensions must be? - ANSWER 48 hrs prior to expiration

Maintenance outage is an outage that can be deffered until when? - ANSWER Next
monday

Información del documento

Subido en
22 de enero de 2025
Número de páginas
16
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$17.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lecchris
3.8
(6)
Vendido
43
Seguidores
15
Artículos
3198
Última venta
3 meses hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes