100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

NJDEP BMP Manual Exam Questions and Answers 100% Pass

Puntuación
-
Vendido
-
Páginas
13
Grado
A+
Subido en
10-01-2025
Escrito en
2024/2025

NJDEP BMP Manual Exam Questions and Answers 100% Pass The following linear development projects are exempt from groundwater recharge , sw runoff quantity, and sw runoff quality: - 1. The construction of an underground utility line provided that the disturbed areas are revegetated upon completion 2. The construction of an aboveground utility line provided that the existing conditions are maintained to the maximum extent practicable 3. The construction of a public pedestrian access, such as a sidewalk or trail with a maximum width of 14 FT, provided that the access is made of permeable material A waiver from strict compliance from the green infrastructure, groundwater recharge, sw runoff quantity, and sw runoff quality requirements may be obtained for the enlargement of an existing public roadway or railroad, or enlargement of a public pedestrian access, provided that the following conditions are met: - 1. The applicant demonstrates that there is a public need for the project that cannot be accomplished by other means. 2. The applicant demonstrates through an alternatives analysis, that the use of sw management measures, the option selected complies to the maximum extent practicable 3. The applicant demonstrates that, in order to meet the requirements of 7:8 existing structures currently in use, such as homes and buildings would need to be condemned 4. The applicant demonstrates that it does not own or have other rights to areas, including the potential to obtain through condemnation lands within the upstream drainage area of the receiving stream EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 2 What do you need mitigation (relief) for? - A variance or waiver BMP's for SW runoff quality and groundwater recharge - -Dry Well -Pervious Paving System (when designed to infiltrate into subsoil) -Small-Scale Bioretention Basin (when designed to infiltrate into subsoil) -Small-Scale Infiltration Basin -Small-Scale Sand Filter BMP's for SW runoff quality - -Cistern -Dry Well -Grass Swale -Green Roof -Manufactured Treatment Device (MTD) -Pervious Paving System -Small-Scale Bioretention Basin -Small-Scale Infiltration Basin -Small-Scale Sand Filter -Vegetative Filter Strip BMP's for SW runoff quantity - -Bioretention System -Infiltration Basin -Sand Filter -Standard Constructed Wetland EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 3 -Wet Pond BMP's for SW runoff quantity and groundwater recharge - -Bioretention System (when designed to infiltrate into subsoil) -Infiltration System -Sand Filter BMP's only with a waiver or variance - -Blue Roof -Extended Detention Basin -Manufactured Treatment Device (MTD) -Sand Filter -Subsurface Gravel Wetland -Wet Pond Dry Well Info: - SW Runoff Quality TSS removal

Mostrar más Leer menos
Institución
UST Operator A/B
Grado
UST Operator A/B









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
UST Operator A/B
Grado
UST Operator A/B

Información del documento

Subido en
10 de enero de 2025
Número de páginas
13
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

NJDEP BMP Manual Exam
Questions and Answers 100% Pass

The following linear development projects are exempt from groundwater recharge , sw runoff quantity,

and sw runoff quality: - ✔✔1. The construction of an underground utility line provided that the disturbed

areas are revegetated upon completion


2. The construction of an aboveground utility line provided that the existing conditions are maintained to

the maximum extent practicable


3. The construction of a public pedestrian access, such as a sidewalk or trail with a maximum width of 14

FT, provided that the access is made of permeable material


A waiver from strict compliance from the green infrastructure, groundwater recharge, sw runoff

quantity, and sw runoff quality requirements may be obtained for the enlargement of an existing public

roadway or railroad, or enlargement of a public pedestrian access, provided that the following conditions

are met: - ✔✔1. The applicant demonstrates that there is a public need for the project that cannot be

accomplished by other means.


2. The applicant demonstrates through an alternatives analysis, that the use of sw management measures,

the option selected complies to the maximum extent practicable


3. The applicant demonstrates that, in order to meet the requirements of 7:8 existing structures currently

in use, such as homes and buildings would need to be condemned


4. The applicant demonstrates that it does not own or have other rights to areas, including the potential to

obtain through condemnation lands within the upstream drainage area of the receiving stream




EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 1

, What do you need mitigation (relief) for? - ✔✔A variance or waiver


BMP's for SW runoff quality and groundwater recharge - ✔✔-Dry Well


-Pervious Paving System (when designed to infiltrate into subsoil)


-Small-Scale Bioretention Basin (when designed to infiltrate into subsoil)


-Small-Scale Infiltration Basin


-Small-Scale Sand Filter


BMP's for SW runoff quality - ✔✔-Cistern


-Dry Well


-Grass Swale


-Green Roof


-Manufactured Treatment Device (MTD)


-Pervious Paving System


-Small-Scale Bioretention Basin


-Small-Scale Infiltration Basin


-Small-Scale Sand Filter


-Vegetative Filter Strip


BMP's for SW runoff quantity - ✔✔-Bioretention System


-Infiltration Basin


-Sand Filter


-Standard Constructed Wetland




EMILY CHARLENE © 2025, ALL RIGHTS RESERVED 2

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EmilyCharlene Teachme2-tutor
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
448
Miembro desde
2 año
Número de seguidores
138
Documentos
21111
Última venta
4 días hace
Charlene\'s Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

3.7

98 reseñas

5
46
4
13
3
15
2
7
1
17

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes