Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 3 fuera de 18 páginas
Examen

FDOT EARTHWORK LEVEL 1 EXAM QUESTIONS | TESTED AND TRIED ANSWERS | LATEST UPDATE 2024/2025 100% (GRADE A+)

Document preview thumbnail
Vista previa 3 fuera de 18 páginas

FDOT EARTHWORK LEVEL 1 EXAM QUESTIONS | TESTED AND TRIED ANSWERS | LATEST UPDATE 2024/2025 100% (GRADE A+)FDOT EARTHWORK LEVEL 1 EXAM QUESTIONS | TESTED AND TRIED ANSWERS | LATEST UPDATE 2024/2025 100% (GRADE A+)

Vista previa del contenido

FDOT EARTHWORK LEVEL 1 EXAM QUESTIONS | TESTED
AND TRIED ANSWERS | LATEST UPDATE 2024/2025
100% (GRADE A+)
Basics covered in Level 1


Ans>> Nuclear Testing


Speedy Moisture


Report Forms




Earthwork has to do with the roadway in what way?


Ans>> Earthwork is the excavation and placement of soils and materials supporting the

proposed roadway.




In Earthwork what is a lift?


Ans>> 6" of compacted depth at full width




In Earthwork what is a Lot?


Ans>> A lot is 1 lift at 500 ft or within compacted area. Isolated compaction operations are

separate lots.




1

,Sampling at the roadway is done for


Ans>> Done for base, sub grade, and embankment.




Sampling is determined how


Ans>> generated with random numbers usually by a Verification Inspector




What is important about sampling at the roadway


Ans>> Minimum of three representative sample combined.




What is LIMS?


Ans>> Laboratory Info Management System




The proctor theory is when compaction is achieved how


Ans>> by inputting energy to expel air and water in the soil voids




Compaction causes


Ans>> An increase in unit weight, decrease in compressibility and permeability.




2

, The proctor is determined where and creates what


Ans>> In a laboratory and establishes a density standard to be used on the roadway




Lab proctors are created how


Ans>> Material is gathered from the road and prepared with different amounts of water then

placed in molds and hammered




What is a modified proctor used in


Ans>> It is used in base, sub grade, MSE wall back fill materials




Modified proctors are created how


Ans>> With a 10lb hammer(rammer) on a 18" drop with 56 blows per layers with 5 layers in

total.




What is a standard proctor used in


Ans>> It is used in embankment and structure back fill materials




Standard proctors are created how


3

Información del documento

Subido en
6 de enero de 2025
Número de páginas
18
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
0
Seguidores
0
Artículos
343
Última venta
-



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes