When using hand signals to direct a crane operator, an extended arm with the thumb vertical and the fingers opening and closing into a fist indicates: - ANSWER raise boom and lower the load Two closed fists with both thumbs pointing toward each other is the signal for: - ANSWER retract hydraulic boom Which of the following is not a permitted use of an "operational aid"? - ANSWER used to test weigh a load prior to hoisting T or F Any crane component can be used on any other crane made by the same company - ANSWER false A rough terrain crane is commonly referred to as; - ANSWER cherry picker Which of these conditions could be dangerous when operating a crane around a newly constructed building? - ANSWER uncompacted soil When hoisting on outriggers with a permitted 360 degree swing, which position is the most hazardous in most conditions? - ANSWER over corner T or F The ground pressure under the outriggers is higher than it is under a crawler track because of the smaller bearing surface - ANSWER True An outrigger float should be approximately how much larger that the outrigger pad? - ANSWER 3 times When setting a a crawler crane for use on a new site, which of the following is not required prior to use? - ANSWER name of the person that will operate the crane Where should the slings be attached when lifting lattice boom sections? - ANSWER use the end connections T or F During crane assembly, the counterweight is mounted after the installation of the complete boom - ANSWER false When assembling lattice boom sections, which set of pins are installed first?

Mostrar más Leer menos
Institución
Aviationa Exa
Grado
Aviationa exa









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Aviationa exa
Grado
Aviationa exa

Información del documento

Subido en
5 de enero de 2025
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Exam
NCCCO MOBILE CRANE EXAM/99
QUESTIONS AND ANSWERS
(CRANE PRACTICE TESTS)


When using hand signals to direct a crane operator, an extended arm with the thumb
vertical and the fingers opening and closing into a fist indicates: - ANSWER ✓✓✓raise
boom and lower the load

Two closed fists with both thumbs pointing toward each other is the signal for: -
ANSWER ✓✓✓retract hydraulic boom

Which of the following is not a permitted use of an "operational aid"? - ANSWER ✓✓✓
used to test weigh a load prior to hoisting

T or F
Any crane component can be used on any other crane made by the same company -
ANSWER ✓✓✓false

A rough terrain crane is commonly referred to as; - ANSWER ✓✓✓cherry picker

Which of these conditions could be dangerous when operating a crane around a newly
constructed building? - ANSWER ✓✓✓uncompacted soil

When hoisting on outriggers with a permitted 360 degree swing, which position is the
most hazardous in most conditions? - ANSWER ✓✓✓over corner

T or F
The ground pressure under the outriggers is higher than it is under a crawler track
because of the smaller bearing surface - ANSWER ✓✓✓True

An outrigger float should be approximately how much larger that the outrigger pad? -
ANSWER ✓✓✓3 times

, When setting a a crawler crane for use on a new site, which of the following is not
required prior to use? - ANSWER ✓✓✓name of the person that will operate the crane

Where should the slings be attached when lifting lattice boom sections? - ANSWER ✓
✓✓use the end connections

T or F
During crane assembly, the counterweight is mounted after the installation of the
complete boom - ANSWER ✓✓✓false

When assembling lattice boom sections, which set of pins are installed first? - ANSWER
✓✓✓both upper

When installing the boom pins, the pin should be pointing; - ANSWER ✓✓✓out away
from boom center

When dismantling a lattice boom, which boom pins should be removed first? - ANSWER
✓✓✓both lower

T or F
It is safe to climb under a boom to knock out the boom pins if the crane has tension on
the pendant lines - ANSWER ✓✓✓false

What important step must be followed when welding a damaged crane boom? -
ANSWER ✓✓✓follow manufactures welding procedure,have a welder certified to the
correct welding procedure, use correct welding rods and heat treatment
All of above

What position should the gantry of a crane be in when lifting a load? - ANSWER ✓✓✓
highest position

Jib forestay and backstay pendant lines should be; - ANSWER ✓✓✓of equal length or
the backstay pendant lines should be longer

t or F
Jib capactiy "increases" as the angle to ground decreases. - ANSWER ✓✓✓False

T or F
On most cranes the jib hoist and boom hoist can be safely operated simultaneously -
ANSWER ✓✓✓false

Which of the following is an auxillary boom, or extension of the main boom? - ANSWER
✓✓✓jib
$15.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
NurseEdwin
5.0
(1)

Conoce al vendedor

Seller avatar
NurseEdwin California State University - Channel Islands
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
9
Miembro desde
2 año
Número de seguidores
8
Documentos
924
Última venta
3 meses hace

5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes