• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 3 fuera de 27 páginas
Examen

PE Exam – Construction questions with complete solutions

Document preview thumbnail
Vista previa 3 fuera de 27 páginas

PE Exam – Construction questions with complete solutions

Vista previa del contenido

PE Exam – Construction questions with
complete solutions

Types of Loads - correct answer ✔✔Dead, Live, Construction, Environmental, and Lateral Earth Pressure



Available Design Methods for Construction Loads - correct answer ✔✔Allowable Stress Design (ASD)

Load and Resistance Factor Design (LRFD)



Building Type & Construction Method - correct answer ✔✔Residential: Light wood stick framing

Commercial: Wood, steel, or masonry

High-rise and other commercial: heavy steel framing or reinforced concrete

Long-Span Bridges: steel cables



Wood Framing - correct answer ✔✔Most common way to build houses in NA



Simplified Building Procedure for Wood House - correct answer ✔✔1. Place concrete foundation

2. Place first floor walls

3. Construct wood platform to build second floor

4. Place second floor walls

5. Place roof on top of 2nd floor walls



Steel Framing - correct answer ✔✔Most common for high-rise and commercial buildings

Similar to wood but with less flexibility

High strength & relatively light weight

Expensive compared to other materials



Concrete Structures - correct answer ✔✔Concrete systems are commonly used in high-ride buildings

,More resistant to fire than steel or wood

Less prone to corrosion than steel (common for UG structures)



Simplified Building Procedure for Concrete Structures - correct answer ✔✔1. Prepare concrete mix
design

2. Prepare formwork

3. Pour steel reinforcement

4. Pour Concrete

5. Allow for concrete curing process

6. Disassemble formwork



Advantage of Precast Concrete - correct answer ✔✔Higher quality fabrication from casting off-site

Can accelerate construction schedules



A two-story multi-family residential structure is being construction in a high seismic area. Which
construction type is most likely to be used? - correct answer ✔✔Wood Framing

(2-story, low rise residential)

"High-seismic" is a distractor



Temporary Structures - correct answer ✔✔May be removed at end of construction (usually)

May be incorporated into the finished structure

Concrete formwork is a common example of temporary structure



Design Considerations of Concrete formwork - correct answer ✔✔Dead Load: weight of fresh concrete
plus form self weight

Live Load: 50-75 psf depending on equipment used (to pour concrete)

Lateral pressure exerted by fresh concrete



Typical formwork material - correct answer ✔✔3/4" plywood that is coated on one side

, Types of concrete formwork - correct answer ✔✔Slab Formwork

Beam Formwork

Column/Wall Formwork (look at photos)



Equation for Lateral Pressures of Concrete - correct answer ✔✔ACI 347R-14 Table 4.2.2.1a(a)



Project Management Process Groups - correct answer ✔✔Initiation -> Planning -> executing ->
Controlling and monitoring (loop back to planning) -> closing

Ex. of loop (Value Engineering)



Gantt Chart - correct answer ✔✔Small to mid-size projects

Forecast & manage resources (labor, equipment, budgets, etc)

Disadvantage: doesn't show all the links/sequencing



Critical Path Method (CPM) - correct answer ✔✔Project modeling technique that identifies the most
critical activities on a schedule

Helps monitor the assets, expenses, and advancement of the project

Activity on Node (AON) is most common



PERT - correct answer ✔✔Program Evaluation Review Technique (also known as CPM)



Float Time (slack time) - correct answer ✔✔Amount of time that an activities can be delayed without
affecting the overall schedule (applies to activities not on CP)



Applying the CPM (steps) - correct answer ✔✔1. Specify each activity

2. Sequence the activities

3. Draw the network diagram

4. Identify the CP

5. Update to show progress

Información del documento

Subido en
7 de diciembre de 2024
Número de páginas
27
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
7Eleven
4.0
(122)
Vendido
326
Seguidores
209
Artículos
17912
Última venta
9 horas hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes