TMDE - ANSWERTest Measurement Diagnostic Equipment
Over all in charge of QA - ANSWERQAO
Definition of re-work from the book - ANSWERThe unplanned repetition of a step or
a series of steps in a FWP
Difference between FWP and CWP - ANSWERCWP requires a record Objective
Quality Evidence (OQE)
DFS "MINOR" - ANSWER1) Associated with a temporary repair to a system or
component not involving equipment or personnel safety, or not involving integrity or
operability of equipment essential to craft mission.
2) For any "As found" conditions discovered during a maintenance action that will not
be corrected prior to the crafts underway.
Fundamental rule of QA / all maintenance - ANSWERTechnical specifications must
be met at all times
3 Major events that lead to the QA program - ANSWERUSS Iwo Jima - Wrong bolts
which lead to a steam leak
Space shuttle Challenger - Faulty O-Rings which lead to a fuels mixing and
explosion.
USS Thresher - Valves failed couldn't de ballast and sank
Craftsman responsibilities - ANSWER1) Perform all maintenance actions in
accordance with the approved procedure.
2) Ensure QA forms associated with the maintenance are correctly completed.
3) Enter Signature, print name and date on all QA forms completed.
Five required parts of a FWP - ANSWER1) Materials
2) Initial conditions
3)Procedure
4)Test and Inspection
5) Restoration
List technical work documents - ANSWER1) Maintenance Procedure (MP)
2) Formal Work Package (FWP)
3) Controlled Work Package (CWP)
DFS "MAJOR" - ANSWERAffects
1) Performance
2) Durability