Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 637 páginas
Examen

FULL TEST BANK For Information Technology Project Management 9th Edition by Kathy Schwalbe Latest Update Graded A+

Document preview thumbnail
Vista previa 4 fuera de 637 páginas

FULL TEST BANK For Information Technology Project Management 9th Edition by Kathy Schwalbe Latest Update Graded A+

Vista previa del contenido

FULL TEST BANK
For Information Technology Project Management 9th Edition
by Kathy Schwalbe Latest Update Graded A+
PRINTEND PDF|ORIGINAL DIRECT FROM PUBLISHER|100% VERIFIED
ANSWERS|DOWLOAD IMMEDIATELY AFTER THE ORDER

9TH EDITION




Complete Test Bank, All Chapter Are Included
For More Documents Search (Testbankproferssor.Stuvia)

,Chapter 1: Introduction To Project Management



True/False

1. Until The 1980s, Project Management Primarily Focused On Providing Schedule And Resource Data To
Top Management In The Military, Computer, And Construction Industries.

Ans: T
Until The 1980s, Project Management Primarily Focused On Providing Schedule And Resource Data To
Top Management In The Military, Computer, And Construction Industries. Today’s Project Management
Involves Much More, And People In Every Industry And Every Country Manage Projects.


Pts: 1 Dif: Difficulty: Easy Ref: P.2
Obj: Lo: 1-1 Nat: Busprog: Technology Top: Introduction
Key: Bloom's: Knowledge

2. A Difference Between Operations And Projects Is That Operations End When Their Objectives Have
Been Reached, Whereas Projects Do Not.

Ans: F
Projects Are Different From Operations In That They End When Their Objectives Have Been Reached Or
The Project Has Been Terminated.


Pts: 1 Dif: Difficulty: Moderate Ref: P.4
Obj: Lo: 1-2 Nat: Busprog: Analytic Top: What Is A Project?
Key: Bloom's: Comprehension

3. Every Project Should Have A Well-Defined Objective.

Ans: T
A Project Has A Unique Purpose. Every Project Should Have A Well-Defined Objective.


Pts: 1 Dif: Difficulty: Easy Ref: P.6
Obj: Lo: 1-2 Nat: Busprog: Analytic Top: What Is A Project?
Key: Bloom's: Knowledge

4. Projects Should Be Developed In Increments.

Ans: T
A Project Is Developed Using Progressive Elaboration. Projects Are Often Defined Broadly When They

,Begin, And As Time Passes, The Specific Details Of The Project Become Clearer. Therefore, Projects
Should Be Developed In Increments.


Pts: 1 Dif: Difficulty: Moderate Ref: P.6
Obj: Lo: 1-2 Nat: Busprog: Analytic Top: What Is A Project?
Key: Bloom's: Comprehension

, 5. Resources In A Project Should Be Used Effectively Because They Are Limited.

Ans: T
A Project Requires Resources, Often From Various Areas. Resources, However, Are Limited And Must Be
Used Effectively To Meet Project And Other Corporate Goals.


Pts: 1 Dif: Difficulty: Moderate Ref: P. 7
Obj: Lo: 1-2 Nat: Busprog: Analytic Top: What Is A Project?
Key: Bloom's: Comprehension

6. A Project Manager’s Primary Role Is To Provide The Funding For A Project.

Ans: F
A Project Sponsor Usually Provides The Direction And Funding For A Project.


Pts: 1 Dif: Difficulty: Easy Ref: P.7
Obj: Lo: 1-2 Nat: Busprog: Analytic Top: What Is A Project?
Key: Bloom's: Knowledge

7. One Of The Main Reasons Why Project Management Is Challenging Is Because Of The Factor Of Uncertainty.

Ans: T
A Project Involves Uncertainty. Every Project Is Unique And Thus It Is Sometimes Difficult To Define
Its Objectives Clearly, Estimate How Long It Will Take To Complete, Or Determine How Much It Will
Cost. This Uncertainty Is One Of The Main Reasons Project Management Is So Challenging.


Pts: 1 Dif: Difficulty: Moderate Ref: P.7
Obj: Lo: 1-2 Nat: Busprog: Analytic Top: What Is A Project?
Key: Bloom's: Comprehension

8. Questions About How A Team Will Track Schedule Performance Is Related To A Project’s Scope.

Ans: F
Project Scope Deals With Questions Such As, “What Work Will Be Done As Part Of The Project?”, “What
Unique Product, Service, Or Result Does The Customer Or Sponsor Expect From The Project?”, Or “How
Will The Scope Be Verified?”


Pts: 1 Dif: Difficulty: Moderate Ref: P.7
Obj: Lo: 1-2 Nat: Busprog: Technology Top: What Is A Project?
Key: Bloom's: Comprehension

9. In Order To Be Realistic, A Project Manager Should Always Set Discrete Goals Instead Of A
Range Of Objectives.

Libro relacionado
 image
Editorial: 2018 ISBN: 9781337101356 Edición: Desconocido

Información del documento

Subido en
20 de noviembre de 2024
Número de páginas
637
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$20.39

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Vendido
586
Seguidores
139
Artículos
1410
Última venta
4 días hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes