What must owners and operators do if their UST fails the internal lining inspection and cannot be repaired according to a code of practice? - ANSWERPermanently close the UST T/F Cathodic protection tester can design field-installed cathodic protection systems - ANSWERFalse T/F Owners and operators have 30 days to respond to an active alarm on their automatic tank gauging console. - ANSWERFalse T/F An inconclusive result for SIR means an owner and operator has not performed release detection for that month. - ANSWERTrue How many years must owners and operators maintain performance claims for their release detection method? - ANSWER5 Years Owners and operators with 100 or fewer USTs must have ____ dollars aggregate coverage for tanking corrective action and compensating third parties - ANSWER1 Million T/F Owners and operators may use a combination of financial mechanisms to comply with the financial responsibility requirements. - ANSWERTrue

Vista previa del contenido

UST Designated Operator A CORRECT
100%
What must owners and operators do if their UST fails the internal lining inspection and cannot be
repaired according to a code of practice? - ANSWERPermanently close the UST



T/F Cathodic protection tester can design field-installed cathodic protection systems - ANSWERFalse



T/F Owners and operators have 30 days to respond to an active alarm on their automatic tank
gauging console. - ANSWERFalse



T/F An inconclusive result for SIR means an owner and operator has not performed release detection
for that month. - ANSWERTrue



How many years must owners and operators maintain performance claims for their release detection
method? - ANSWER5 Years



Owners and operators with 100 or fewer USTs must have ____ dollars aggregate coverage for tanking
corrective action and compensating third parties - ANSWER1 Million



T/F Owners and operators may use a combination of financial mechanisms to comply with the
financial responsibility requirements. - ANSWERTrue



T/F Tanks less than 10,000 gallons installed after April 11, 2016 do not have to meet the secondary
containment requirement. - ANSWERFalse



Select the equipment used in UST systems installed after October 13, 2015 where the first three-year
test or inspection must take place at installation. - ANSWERAutomatic shutoff devices, high level
alarms, and single-wall spell buckets receiving deliveries of more than 25 gallons installed after
October 13th, 2015 must have a first three-year test or inspection at installation.



Select the spill and overfill prevention equipment installed before October 13, 2015, where the first
three-year test or inspection must take place by October 13, 2018. - ANSWERAll of the equipment
shown requires the first three-year test or inspection

, Owners and operators must notify EPA at least 30 days prior to permanently closing an UST system or
performing a change-in-service by doing what? - ANSWERCall EPA

E-mail EPA

Mail by U.S Postal Service



Containment sumps include which of the following? - ANSWERUnder-Dispenser Containment

Submersible Turbine pump sump

Transition Sump



Owners and operators must demonstrate compatibility for which of the following stored substances?
- ANSWERB50

E15



T/F All components of UST systems are designed for all blends of ethanol in the fuel. - ANSWERFalse



T/F Double-walled spill buckets where the space between the walls of the spill bucket is no longer
monitored at least 30 days must be tested for liquid tightness within 1 year after monitoring ceases. -
ANSWERFalse



What percent of piping can an owner or operator repair and not have to replace the piping with
secondarily contained piping? - ANSWERLess than 50 percent



T/F Owners and operators need to check hand held release detection equipment for operability and
serviceability at least annually - ANSWERTrue



How often must owners and operators conduct containment sump testing for containment sumps
used for piping interstitial monitoring? - ANSWER3 years



T/F Manual tank gauging can be used to meet the release detection monitoring requirement for any
size tank. - ANSWERFalse



T/F Pressurized piping must use an automatic line leak detector. - ANSWERTrue

Información del documento

Subido en
8 de noviembre de 2024
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$13.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
papersbyjol
3.8
(79)
Vendido
453
Seguidores
254
Artículos
14152
Última venta
1 semana hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes