100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Asphalt Paving Level 2 Questions and Answers (Graded A)

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
07-11-2024
Escrito en
2024/2025

Asphalt Paving Level 2 Questions and Answers (Graded A)Asphalt Paving Level 2 Questions and Answers (Graded A)Asphalt Paving Level 2 Questions and Answers (Graded A)(T/F:) When the total quantity of hot mix asphalt for the project, as indicated on the plans for Type SP and Type FC mixtures only, is less than 2000 tons, the Engineer will accept the mix on the basis of visual inspection, the Engineer may run acceptance tests to determine the acceptability of the material. - ANSWER-True If the resolution test results compare favorably with the Contractor's QC test results: A. The Lot is accepted at full pay B. The Contractor is required to remove and replace the Lot in question C. The Resolution tests are used for pay for that Lot and the Contractor pays for the testing D. The Contractor's QC results are used for pay for that Lot and the Department pays for the testing E. The Contractor pays for the Resolution testing - ANSWER-(D.) The Contractor's QC results are used for pay for that Lot and the Department pays for testing What materials are approved for use for tack application?

Mostrar más Leer menos
Institución
Asphalt Paving Level 2
Grado
Asphalt Paving Level 2

Vista previa del contenido

Asphalt Paving Level 2 Questions and
Answers (Graded A)
(T/F:) When the total quantity of hot mix asphalt for the project, as indicated on the
plans for Type SP and Type FC mixtures only, is less than 2000 tons, the Engineer will
accept the mix on the basis of visual inspection, the Engineer may run acceptance tests
to determine the acceptability of the material. - ANSWER-True

If the resolution test results compare favorably with the Contractor's QC test results:
A. The Lot is accepted at full pay
B. The Contractor is required to remove and replace the Lot in question
C. The Resolution tests are used for pay for that Lot and the Contractor pays for the
testing
D. The Contractor's QC results are used for pay for that Lot and the Department pays
for the testing
E. The Contractor pays for the Resolution testing - ANSWER-(D.) The Contractor's QC
results are used for pay for that Lot and the Department pays for testing

What materials are approved for use for tack application?
A. SS-1 or CSS-1, SS-1H or CSS-1H
B. RS-1, RS-2, MC-250, SS-4
C. RS-1h, RS-2, CRS-1h, NTSS-1hm, RA-500
D. All the Above
E. None of the Above - ANSWER-(C.) RS-1h, RS-2, CRS-1h, NTSS-1hm, RA-500

The minimum air temperature (in the shade away from artificial heat) for a 1.5 inch layer
of asphalt is:
A. 40°F
B. 45°F
C. 50°F
D. 65°F and rising - ANSWER-(A.) 40°F

A quality of Asphalt Mix will be:
A. Constructable
B. Conform to specifications
C. Satisfy the functional requirements
D. All the above - ANSWER-(D. All the above) - Constructable, conform to
specifications, and satisfy the functional requirements

Which condition will result in more time available for compaction?
A. SP-19 coarse mix during the day
B. FC-9.5 fine mix at night
C. FC-9.5 coarse mix during the day

, D. SP-12.5 fine mix with PG76-22 - ANSWER-(A.) SP-19 coarse mix during the day

The fallowing statement is true about trucks used to haul asphalt mix:
A. Truck drivers must be certified to haul asphalt mix
B. Truck beds need to be clean and smooth
C. Hole must be present in both sides of truck bed
D. All the above
E. Both B & C - ANSWER-(E. Both B & C) - Truck beds need to be clean and smooth
and hole must be present in both sides of the truck bed

When using a vibratory roller, which is generally correct?
A. Keep the roller frequency high and impact spacing between 10-12 impacts per foot
B. Run low frequency, high amplitude, and 10-12 impacts per foot
C. Vibrate only when the lift of mix is less than 1.25 inches
D. Both A and C
E. Both B and C - ANSWER-(B.) Run low frequency, high amplitude, and 10-12 impacts
per foot

If the desired spread rate is 165 lbs/sq yds for SP mix, what is the construction
tolerance for the layer thickness? - ANSWER--+ 8.3 lbs/sq yds

On the structural layer prior to the friction course, correct any deficiencies before placing
the friction course.
A. Greater than 3/16"
B. Equal to 3/16"
C. Less than 1/8"
D. Greater than 1/8" - ANSWER-Equal to 3/16"

The standard Lot size for FC-5 is:
A. 500 to 1000 tons
B. A day's production
C. 1000 feet
D. 2000 tons
E. 4000 tons - ANSWER-(D.) 2,000 Tons


What do you do? (Spread Rate) - ANSWER-(A.) Spread Rate is in tolerance - document
and continue

Properly operated, the __ should be moving 80%-90% of the time while paving. -
ANSWER-(C.) Augers

Cover Stone for an ARMI layer must be applied at what application rate?
A. 0.6 to 0.8 ft³/yd²
B. 0.26 to 0.33 ft³/yd²
C. 0.34 to 0.57 ft³/yd²

Escuela, estudio y materia

Institución
Asphalt Paving Level 2
Grado
Asphalt Paving Level 2

Información del documento

Subido en
7 de noviembre de 2024
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NursingTutor1 West Virginia University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1647
Miembro desde
3 año
Número de seguidores
1073
Documentos
18070
Última venta
12 horas hace
Nursing Tutor

Paper Due? Worry not. Hello. Welcome to NursingTutor. Here you\'ll find verified study materials for your assignments, exams and general school work. All papers here are graded A to help you get the best grade. Also, I am a friendly person so, do not hesitate to send a message in case you have a query. I wish you Luck.

3.8

449 reseñas

5
212
4
76
3
90
2
21
1
50

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes