Power Engineering 4th Class - Unit B5 Review Exam Questions And Answers 100% Pass R4B A steam boiler that is to be shut down for a long period of time should be: Select one: a. Drained, thoroughly dried, have desiccant placed inside, and closed up b. Left with the water at normal working level but opened up to atmosphere c. Left with the water at normal working level and pressurized with air to 50 kPa d. Filled completely with water and the vent left open to atmosphere for expansion - answera R4B When shutting down a boiler for internal cleaning: Select one: a. Shut down the boiler, then fill it completely with chemically treated water b. Shut off the fire. Then, drain the boiler while it is hot, open it up, and flush it c. Allow the boiler to cool. Then drain it, open it up, and flush it d. Let it stand for a couple of days, then drain it - answerc R4B A single-pole scaffold: Select one: a. Is prohibited from use by Workplace Safety and Health b. Is often referred to as the pogo platform c. Is partially supported by a building ©THEBRIGHT EXAM SOLUTIONS 10/30/2024 11:32 PM d. Need not be plumb, but must be level - answerc R4B A type of file which is always a single cut file is the: Select one: a. Half round file b. Mill file c. Square file d. Pillar file - answerb R4B Prior to a worker entering the steam drum of an off-line boiler that is connected to a common, pressurized steam header, the Select one: a. Header must be shut down and depressurized b. Boiler Inspector must be informed before any work occurs c. Main steam, blowdown and feedwater valves must be closed, locked and tagged d. Drum must be vented, the safety valve must be gagged, and all ash and soot removed from the firebox - answerc R4B In order to check the trueness of a flat surface, one would use a: Select one: a. Hermaphrodite divider b. Surface plate c. Layout bench d. Machinist's square - answerb R4B Which of the following are chemicals used for boiler cleaning and treatment, that require careful control and vigilant monitoring? Select one: a. Chelants b. Phosphates ©THEBRIGHT EXAM SOLUTIONS 10/30/2024 11:32 PM c. Sulfites d. Sulfates - answera R4B When joining two ropes of different diameters we use a: Select one: a. Braiding b. Sheet bend c. Figure eight knot d. Sheep shank - answerb R4B Safe rigging practice dictates that weight estimates of objects to be lifted, when the objects are relatively lightweight, should be accurate within plus or minus _____. Select one: a. 500 lbs b. 100 kg c. 20% d. 50% - answerc R4B Ladders that are used in the workplace should comply with: Select one: a. CSA Standards for Scaffolding b. Common industry practice c. ASME/ANSI ladder material specifications d. WCB regulations and CSA standards - answerd R4B What pressure is applied to a boiler during a hydrostatic test? Select one: a. 1.5 times the setting of the safety valve. b. 1.5 times the maximum allowable working pressure.

Mostrar más Leer menos
Institución
Power Engineering
Grado
Power Engineering










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Power Engineering
Grado
Power Engineering

Información del documento

Subido en
3 de noviembre de 2024
Número de páginas
20
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

©THEBRIGHT EXAM SOLUTIONS
10/30/2024 11:32 PM


Power Engineering 4th Class - Unit B5
Review Exam Questions And Answers 100%
Pass



R4B05-03-02-01 A steam boiler that is to be shut down for a long period of time should be:
Select one:
a. Drained, thoroughly dried, have desiccant placed inside, and closed up
b. Left with the water at normal working level but opened up to atmosphere
c. Left with the water at normal working level and pressurized with air to 50 kPa

d. Filled completely with water and the vent left open to atmosphere for expansion - answer✔a
R4B05-04-01-03 When shutting down a boiler for internal cleaning:
Select one:
a. Shut down the boiler, then fill it completely with chemically treated water
b. Shut off the fire. Then, drain the boiler while it is hot, open it up, and flush it
c. Allow the boiler to cool. Then drain it, open it up, and flush it

d. Let it stand for a couple of days, then drain it - answer✔c
R4B05-02-01-01 A single-pole scaffold:
Select one:
a. Is prohibited from use by Workplace Safety and Health
b. Is often referred to as the pogo platform
c. Is partially supported by a building

, ©THEBRIGHT EXAM SOLUTIONS
10/30/2024 11:32 PM

d. Need not be plumb, but must be level - answer✔c
R4B05-01-01-05 A type of file which is always a single cut file is the:
Select one:
a. Half round file
b. Mill file
c. Square file

d. Pillar file - answer✔b
R4B05-04-01-01 Prior to a worker entering the steam drum of an off-line boiler that is
connected to a common, pressurized steam header, the
Select one:
a. Header must be shut down and depressurized
b. Boiler Inspector must be informed before any work occurs
c. Main steam, blowdown and feedwater valves must be closed, locked and tagged
d. Drum must be vented, the safety valve must be gagged, and all ash and soot removed from
the firebox - answer✔c
R4B05-01-04-01 In order to check the trueness of a flat surface, one would use a:
Select one:
a. Hermaphrodite divider
b. Surface plate
c. Layout bench

d. Machinist's square - answer✔b
R4B05-04-04-02 Which of the following are chemicals used for boiler cleaning and treatment,
that require careful control and vigilant monitoring?
Select one:
a. Chelants
b. Phosphates

, ©THEBRIGHT EXAM SOLUTIONS
10/30/2024 11:32 PM

c. Sulfites

d. Sulfates - answer✔a
R4B05-02-04-08 When joining two ropes of different diameters we use a:
Select one:
a. Braiding
b. Sheet bend
c. Figure eight knot

d. Sheep shank - answer✔b
R4B05-02-02-02 Safe rigging practice dictates that weight estimates of objects to be lifted,
when the objects are relatively lightweight, should be accurate within plus or minus _____.
Select one:
a. 500 lbs
b. 100 kg
c. 20%

d. 50% - answer✔c
R4B05-02-01-03 Ladders that are used in the workplace should comply with:
Select one:
a. CSA Standards for Scaffolding
b. Common industry practice
c. ASME/ANSI ladder material specifications

d. WCB regulations and CSA standards - answer✔d
R4B05-04-02-01 What pressure is applied to a boiler during a hydrostatic test?
Select one:
a. 1.5 times the setting of the safety valve.
b. 1.5 times the maximum allowable working pressure.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Thebright Florida State University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
178
Miembro desde
1 año
Número de seguidores
6
Documentos
12345
Última venta
2 días hace
Topscore Emporium.

On this page, you find verified, updated and accurate documents and package deals.

3.8

35 reseñas

5
13
4
10
3
7
2
1
1
4

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes