JACKLINE
CPESC Section 1 & 2 With Questions And 100% ALL DETAILED CORRECT ANSWERS
Terms in this set (62)
What does the acronym NPDES stand for? National Pollutant Discharge Elimination System
True / False: The NPDES requirements apply only 2.1.1.6
to discharges of storm-water either directly or True
through a municipal separate storm drain system,
to waters of the US.
2.1.1.10
What does the acronym TMDL stand for? Define
Total Maximum Daily Load. The amount of a particular pollutant that a water body can
it?
assimilate on a daily basis without violating applicable water quality standards.
issued under the NPDES Program? 2. The individual permit designed to fit the specific requirements of a particular applicant,
facility, or activity.
1/8
, 2.1.1.10
The TMDL defines the amount of a particular pollutant that a water body can assimilate on a
Define TMDL
daily basis without violating applicable water quality standards. (Water quality standards
usually predetermined by the state.)
2.2.1
What are the two types of storm-water permits 1. The Construction General Permit (CGP).
CPESC Section 1 & 2
2/8
CPESC Section 1 & 2 With Questions And 100% ALL DETAILED CORRECT ANSWERS
Terms in this set (62)
What does the acronym NPDES stand for? National Pollutant Discharge Elimination System
True / False: The NPDES requirements apply only 2.1.1.6
to discharges of storm-water either directly or True
through a municipal separate storm drain system,
to waters of the US.
2.1.1.10
What does the acronym TMDL stand for? Define
Total Maximum Daily Load. The amount of a particular pollutant that a water body can
it?
assimilate on a daily basis without violating applicable water quality standards.
issued under the NPDES Program? 2. The individual permit designed to fit the specific requirements of a particular applicant,
facility, or activity.
1/8
, 2.1.1.10
The TMDL defines the amount of a particular pollutant that a water body can assimilate on a
Define TMDL
daily basis without violating applicable water quality standards. (Water quality standards
usually predetermined by the state.)
2.2.1
What are the two types of storm-water permits 1. The Construction General Permit (CGP).
CPESC Section 1 & 2
2/8