What does the acronym NPDES stand for? - ANS National Pollutant Discharge Elimination System True / False: The NPDES requirements apply only to discharges of storm-water either directly or through a municipal separate storm drain system, to waters of the US. - ANS 2.1.1.6 True What does the acronym TMDL stand for? Define it? - ANS 2.1.1.10 Total Maximum Daily Load. The amount of a particular pollutant that a water body can assimilate on a daily basis without violating applicable water quality standards. Define TMDL - ANS 2.1.1.10 The TMDL defines the amount of a particular pollutant that a water body can assimilate on a daily basis without violating applicable water quality standards. (Water quality standards usually predetermined by the state.) What are the two types of storm-water permits issued under the NPDES Program? - ANS 2.2.1 1. The Construction General Permit (CGP). 2. The individual permit designed to fit the specific requirements of a particular applicant, facility, or activity. If deficiencies are found during a SWPPP inspection, how quickly do they need to be corrected? - ANS No later than seven days after the inspection. List three types of pollutants. - ANS 2.1 Nutrients,pathogens, heavy metals, toxics, sediment, salts, detergents, hydro-carbons,oxygen absorbing substances. List three examples of 'Waters of the United States'. - ANS 2.1.1.6 Lakes,rivers, streams, mudflats, sand flats, wetlands, sloughs, prairie potholes, wet meadows, playa lakes, natural ponds. When does the SWPPP need to be completed? - ANS 2.3.6.4 Prior to submitting the NOI. When does the EPA's construction permit require inspections? - ANS Every 7 days, or within 24 hrs of a storm of 0.5 inches or move in depth. What does CPESC stand for? - ANS Certified Professional in Erosion & Sediment Control What are the two types of Storm Water Permits? - ANS 2.2.1 1. General: provides umbrella coverage to a large number of applicants. 2. Individual: designed to fit the specific requirements of a particular applicant, facility, or activity. True/False: A site initially disturbing 1/2 acre, that is part of a 3.5 acre future development is not required to obtain a permit for the 1/2 acre. - ANS 2.1.1.8 False, If it as part of a larger plan of development 1 acre, a permit is required. Name 3 of the 5 types of Phase I facilities under section 402 of the CWA as of 1987. - ANS 2.1.1.2 -Facilities already covered by a permit -Facilities that engage in industrial activity -Large (250K pop) MS4s -Medium (100K250K) MS4s -Facilities that EPA admin deems "significant contributors" of pollutants to WOTUS Who is responsible for applying for the Storm water permit for a construction site? - ANS 2.3.1 The operator of the site, however a owner can apply if the operator has not been identified. What is an NOI? - ANS 2.2.4 "Notice of Intent" to be covered by a general permit in the state in which the facility is located. List the 6 major phases of a SWPPP for construction activities? - ANS 2.3.6 -Site Evaluation/design development (site plan) -Assessment (site area/runoff calc) -Control selection and plan design (BMPs) -Certification/notification (NOI) -Construction/implementation (install/maintenance) -Final stabilization/termination (NOT) What score do you need to pass each section of the test? - ANS 70% What is the deadline to stabilize a site that wont be redisturbed? - ANS 2.3.6.3 14 days

Vista previa del contenido

CPESC Section 1 & 2 Exam Questions
And Answers


What does the acronym NPDES stand for? - ANS National Pollutant Discharge Elimination
System

True / False: The NPDES requirements apply only to discharges of storm-water either directly or
through a municipal separate storm drain system, to waters of the US. - ANS 2.1.1.6
True

What does the acronym TMDL stand for? Define it? - ANS 2.1.1.10
Total Maximum Daily Load. The amount of a particular pollutant that a water body can
assimilate on a daily basis without violating applicable water quality standards.

Define TMDL - ANS 2.1.1.10
The TMDL defines the amount of a particular pollutant that a water body can assimilate on a
daily basis without violating applicable water quality standards. (Water quality standards usually
predetermined by the state.)

What are the two types of storm-water permits issued under the NPDES Program? - ANS
2.2.1
1. The Construction General Permit (CGP).
2. The individual permit designed to fit the specific requirements of a particular applicant, facility,
or activity.

If deficiencies are found during a SWPPP inspection, how quickly do they need to be corrected?
- ANS No later than seven days after the inspection.

List three types of pollutants. - ANS 2.1
Nutrients,pathogens, heavy metals, toxics, sediment, salts, detergents, hydro-carbons,oxygen
absorbing substances.

List three examples of 'Waters of the United States'. - ANS 2.1.1.6
Lakes,rivers, streams, mudflats, sand flats, wetlands, sloughs, prairie potholes, wet meadows,
playa lakes, natural ponds.

When does the SWPPP need to be completed? - ANS 2.3.6.4
Prior to submitting the NOI.

, When does the EPA's construction permit require inspections? - ANS Every 7 days, or
within 24 hrs of a storm of 0.5 inches or move in depth.

What does CPESC stand for? - ANS Certified Professional in Erosion & Sediment Control

What are the two types of Storm Water Permits? - ANS 2.2.1

1. General: provides umbrella coverage to a large number of applicants.

2. Individual: designed to fit the specific requirements of a particular applicant, facility, or
activity.

True/False: A site initially disturbing 1/2 acre, that is part of a 3.5 acre future development is not
required to obtain a permit for the 1/2 acre. - ANS 2.1.1.8
False, If it as part of a larger plan of development >1 acre, a permit is required.

Name 3 of the 5 types of Phase I facilities under section 402 of the CWA as of 1987. - ANS
2.1.1.2
-Facilities already covered by a permit
-Facilities that engage in industrial activity
-Large (>250K pop) MS4s
-Medium (100K250K) MS4s
-Facilities that EPA admin deems "significant contributors" of pollutants to WOTUS

Who is responsible for applying for the Storm water permit for a construction site? - ANS
2.3.1
The operator of the site, however a owner can apply if the operator has not been identified.

What is an NOI? - ANS 2.2.4
"Notice of Intent" to be covered by a general permit in the state in which the facility is located.

List the 6 major phases of a SWPPP for construction activities? - ANS 2.3.6
-Site Evaluation/design development (site plan)
-Assessment (site area/runoff calc)
-Control selection and plan design (BMPs)
-Certification/notification (NOI)
-Construction/implementation (install/maintenance)
-Final stabilization/termination (NOT)

What score do you need to pass each section of the test? - ANS 70%

What is the deadline to stabilize a site that wont be redisturbed? - ANS 2.3.6.3
14 days

Información del documento

Subido en
31 de octubre de 2024
Número de páginas
7
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.89

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
DocLaura
4.2
(44)
Vendido
160
Seguidores
38
Artículos
6396
Última venta
2 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes