STUDY QUESTIONS |GUARANTEED
PASS
Qualified Personnel - ACCURATE ANSWERS✔✔ a person
knowledgeable in the principles and practice of erosion and sediment
controls who possesses the skills to assess conditions at the construction
site that could impact storm water quality and to assess the effectiveness
of any sediment and erosion control measures selected to control the
quality of storm water discharges from the construction acitivities
How must the inspector act? - ACCURATE ANSWERS✔✔
professional, impartial, courteous, consistent in every situation, honest
and accurate with your response
Why was the CWA enacted? - ACCURATE ANSWERS✔✔ To restore
and maintain the chemical, physical and biological integrity of the
waters of the U.S.
Section 401 - ACCURATE ANSWERS✔✔ If you are involved in
construction or industrial activities that may result in discharge of any
pollutant you must obtain Water Quality Certification
NPDES - ACCURATE ANSWERS✔✔ National Pollutant Discharge
Elimination System, est. 1972
, Section 402 - ACCURATE ANSWERS✔✔ Stated that five categories of
strormwater discharges were subjected to permitting
Phase I facilities - ACCURATE ANSWERS✔✔ 1987
-those already covered under NPDES
-those that engage in industrial activity
-large (<250,000) municipal separate storm drain system
-medium (>100,000, <250,000) municipal separate storm drain system
-facilities that EPA determines to have stormwater discharges
contributing to violation of water quality
When did IGP and CGP roll out? - ACCURATE ANSWERS✔✔ 1992
Phase II dischargers - ACCURATE ANSWERS✔✔ -"light" industrial
facilities
-small construction sites (<5 acres)
-small municipalities (<100,000 population)
Section 404 - ACCURATE ANSWERS✔✔ established a permit
program to regulate the discharge of dredged fill material into waters of
the U.S.
Stormwater is, as defined under EPA's NPDES rules,... - ACCURATE
ANSWERS✔✔ stormwater runoff, snow melt runoff, and surface runoff
or drainage