DBIA – Chapters Study Guide Federal Acquisition Regulations (FAR) - Answer-1997 regulations changed allowing design build procurement Florida Law 1997 - Answer-QBS could be used in Design Build Construction Management Association of American - Answer-Formed 1982, Provided a service not a delivery method, they held no liability and it added a third contract. CM at Risk Disadvantages - Answer-2 Contracts, 2 Conflicting Agendas leading to change orders CM at Risk Advantages - Answer-Early GC involvement = cost info earlier to prevent budget overruns. Drives to a better schedule to mitigate selections and procurement schedule. Design and construction overlap. Good for complex phasing and schedule constraints. Allows for Value Engineering. CM as Agent/Advisor - Answer-Add on Services, No liability, can be used in any delivery method "At-Risk" in CM at Risk - Answer-Liable for construction cost, quality and schedule as well precon advice. NOT LIABLE FOR DESIGN. Disadvantages of Design Bid Build - Answer-Owner carries all risk, No engagement b/t architect or contractor allowing no creativity or innovation leaving VE as an afterthought. Advantages of Design Bid Build - Answer-Familiar, Suited for "lowest price" competitive bidding, No legislation hurdles, Owner highly involved in design. DBIA began - Answer-1993 by Haskell EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024. Page 2/6 CMAA, 1982 - Answer-Construction Management Association of American First DBIA Public Project - Answer-School project in Indiana 1968 American Institute of Constructors (AIC) - Answer-1971 formed for professional certification for a constructor. Kansas City Hyatt Regency Collapse - Answer-Deadly structural collapse, increased insurance premiums for errors and omissions insurance and general liability insurance. Shifted risk to subs after this. Professional CM - Answer-Independent entity that manages design and construction process acting as an agent or advisor to the owner. The may manage multiple prime contracts and provide preconstruction services. CURT - Answer-Created in 2000 to help create competitive advantage for construction users in the marketplace. Lean Construction - Answer-Projects should be managed as a whole process instead of a collection of independent elements and activities. A Procedure for Managing Production. Relational Contracting - Answer-Focuses on the relationship of the contract and the products and services (transactional) aspects of the contract. Alliance Contracting - Answer-Similar to relational contracting. Cooperative model that aligns values, goals and objectives between owners, designers and contractors. EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024. Page 3/6 How faster delivery is achieved with Design Build: - Answer-Overlapping Design and Construction so project can start while still designing. Less RFIs by the time you reach the field as problems have been sorted out in design. Disadvantages of Design Build - Answer-Not typical = Steep Learning Curve, Owners must make decisions earlier, Restrictive procurement regulations. Best Value Procurement - Answer-Quantitative (Cost) and Qualitative (Past Performance, Design Solutions, Overall Management) How to measure project success typically: - Answer-Cost, Schedule, Quality How to measure project success in DB: - Answer-Number of Innovative Solutions Design Build Plus - Answer-When Owners "Add-On" Extra Services such as: project financing, project operations, maintenance and/or ownership. 3 Things to Consider before choosing a Project Delivery Method: - Answer-Goals of Project, Contraints/Limitations, Intangible Impacts. Project Goals - Answer-Budget, Schedule, Quality, Performance, Image, Appearance, Aesthetics, Function. Project Delivery Constraints - Answer-Zoning, Licensing Requirements, Owners in house capabilities and chain of command. Project Delivery Intangible Impacts - Answer-Corporate Culture, Personalities, Market Conditions, Union Influence, Risk/Decision Making Comfort. Important Characteristics to Design Build Delivery - Answer-1 - Solicitation/Basis of Award EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024. Page 4/6 2 - Team Approach 3 - DB Entity 4 - Risk Management 5 - Performance Requirements 6 - Who controls design details 7 - Design-Cost Relationship 8 - Integrated Design Build Scheduling 9 - Contracting Approach Design Entity - Order of Most Common - Answer-1 - Contractor Led 2 - Integrated 3 - Designer Led (most often engineering) 4 - Joint Venture or Developer Led Does the Spearin Doctrine apply in DB? - Answer-NO - Design Builder warrants plans and specifications, you cannot seek for errors and omissions insurance. Functional Requirements - Answer-BIG Picture to help develop performance requirements. Overall goals, constraints and challenges. Performance Criteria - Answer-Must be included w/ performance requirements so that you can determine if the project performs as intended. Examples: Written Standards, Field and Lab Tests, 3rd Party Calcs, On-site Mock-ups and Manufacturers Warranty. EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024. Page 5/6 Two Stage Procurement - Answer-1 - Shortlist using QBS 2 - Choose off of Best Value Fixed Price/Best Design - Answer-Owner discloses project budget and then only evaluates the technical proposal using a criteria matrix. Standard Care of Warranties - Answer-Performance based standards obligate the DB to warranty the construction and design. Draw-Build - Answer-A Form of Bridging, 35% or more of design is complete. Price Based Solicitation. Progressive Design Build - Answer-Two part contract. Part A: QBS solicitation where designer designs 60-70% for a lu

Vista previa del contenido

EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024.




DBIA – Chapters Study Guide

Federal Acquisition Regulations (FAR) - Answer✔✔-1997 regulations changed allowing design build

procurement


Florida Law 1997 - Answer✔✔-QBS could be used in Design Build


Construction Management Association of American - Answer✔✔-Formed 1982, Provided a service not a

delivery method, they held no liability and it added a third contract.


CM at Risk Disadvantages - Answer✔✔-2 Contracts, 2 Conflicting Agendas leading to change orders


CM at Risk Advantages - Answer✔✔-Early GC involvement = cost info earlier to prevent budget overruns.

Drives to a better schedule to mitigate selections and procurement schedule. Design and construction

overlap. Good for complex phasing and schedule constraints. Allows for Value Engineering.


CM as Agent/Advisor - Answer✔✔-Add on Services, No liability, can be used in any delivery method


"At-Risk" in CM at Risk - Answer✔✔-Liable for construction cost, quality and schedule as well precon

advice. NOT LIABLE FOR DESIGN.


Disadvantages of Design Bid Build - Answer✔✔-Owner carries all risk, No engagement b/t architect or

contractor allowing no creativity or innovation leaving VE as an afterthought.


Advantages of Design Bid Build - Answer✔✔-Familiar, Suited for "lowest price" competitive bidding, No

legislation hurdles, Owner highly involved in design.


DBIA began - Answer✔✔-1993 by Haskell



Page 1/6

, EMILLECT 2024/2025 ACADEMIC YEAR ©2024 EMILLECT. ALL RIGHTS RESERVED. FIRST PUBLISH OCTOBER 2024.



CMAA, 1982 - Answer✔✔-Construction Management Association of American


First DBIA Public Project - Answer✔✔-School project in Indiana 1968


American Institute of Constructors (AIC) - Answer✔✔-1971 formed for professional certification for a

constructor.


Kansas City Hyatt Regency Collapse - Answer✔✔-Deadly structural collapse, increased insurance

premiums for errors and omissions insurance and general liability insurance. Shifted risk to subs after

this.


Professional CM - Answer✔✔-Independent entity that manages design and construction process acting

as an agent or advisor to the owner. The may manage multiple prime contracts and provide

preconstruction services.


CURT - Answer✔✔-Created in 2000 to help create competitive advantage for construction users in the

marketplace.


Lean Construction - Answer✔✔-Projects should be managed as a whole process instead of a collection of

independent elements and activities. A Procedure for Managing Production.


Relational Contracting - Answer✔✔-Focuses on the relationship of the contract and the products and

services (transactional) aspects of the contract.


Alliance Contracting - Answer✔✔-Similar to relational contracting. Cooperative model that aligns values,

goals and objectives between owners, designers and contractors.




Page 2/6

Información del documento

Subido en
15 de octubre de 2024
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$10.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Emillect
3.0
(4)
Vendido
34
Seguidores
2
Artículos
2999
Última venta
4 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes