• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 4 fuera de 39 páginas
Examen

Traffic Supervisor Exam With Complete Solutions.

Document preview thumbnail
Vista previa 4 fuera de 39 páginas

TRAFFIC SUPERVISOR EXAM WITH COMPLETE SOLUTIONS.

Vista previa del contenido

TRAFFIC SUPERVISOR EXAM WITH
COMPLETE SOLUTIONS




Is a shadow vehicle used in all traffic zones?
A. True
B. False - correct answer-False

The shadow vehicle is occupied whenever workers are in the work area.
A. True
B. False - correct answer-False

What class one light is the shadow vehicle equipped with?
A. Flashing Yellow Light
B. Oscillating Yellow Light
C. Yellow Strobe Light
D. All of the above - correct answer-All of the above

When may cones be substituted for drums?
A. Daytime traffic control minimum height 18"
B. Daytime traffic control minimum height 28"
C. Daytime traffic control minimum height 36"
D. Daytime traffic control minimum height 42" - correct answer-Daytime traffic control
minimum height 28"

When may cones be substituted for drums?
A. Daytime traffic control minimum height 18"
B. Daytime traffic control minimum height 28"
C. Daytime traffic control minimum height 36"
D. Daytime traffic control minimum height 42" - correct answer-Daytime traffic control
minimum height 28"

,When cones are substituted for drums for nighttime closers, what is the minimum
cone height requirement?
A. 18"
B. 28"
C. 36"
D. 42" - correct answer-42"

When cones are substituted for drums at nighttime closer, what is the maximum
cone spacing?
A. 20'
B. 30'
C. 40'
D. 50' - correct answer-40'

What type of flashing warning lights are required when there is a nighttime lane
closer?
A. ROAD WORK AHEAD
B. LANE CLOSED AHEAD
C. A & B
D. NONE OF THE ABOVE - correct answer-ROAD WORK AHEAD
&
LANE CLOSED AHEAD

If there is a lane closure of greater than three days, what is required?
A. Work zone dotted lines, 4' in length separated by 10' gaps, shall be provided to
identify the merge.
B. The appropriate color work zone edge lines shall be applied along the taper and
tangent sections.
C. All the above
D. None of the above - correct answer-The appropriate color work zone edge lines
shall be applied along the taper and tangent sections.

Work zone pavement marking that conflict with final traffic lanes shall be temporary
paint.
A. True
B. False - correct answer-False

What are the extra advance warning signs?
A. Lane Close Ahead
B. Watch for Stopped Traffic
C. Road Work Ahead
D. All the above - correct answer-Lane Change Ahead
&
Watch for Stopped Traffic
&
Road Work Ahead

Is the advisory speed plaque used in all traffic zones?
A. True
B. False - correct answer-False

,When the approach speed limit is 40 mph or less, 36" warning signs may be used.
A. True
B. False - correct answer-True

Road Work Ahead signs shall be provided on entrance ramps or roadways entering
the work limits.
A. True
B. False - correct answer-True

End Road Work signs are only required for lane closures of more than ______ day.
A. 1
B. 2
C. 3
D 4 - correct answer-1

Sign spacing should be adjusted to avoid conflict with existing signs, minimum
spacing to existing signs shall be 200' for speeds of 45 mph or less and a minimum
of 400' for speeds 50 mph or greater.
A. True
B. False - correct answer-True

The minimum acceptable length for the merge taper shall be determined by
_________ the width of the offset by the merge taper rate.
A. Subtracting
B. Adding
C. Divide
D. Multiplying - correct answer-Multiplying

The tangent (recovery area) section between the two merge tapers should be 2
times longer of the two merge tapers.
A. True
B. False - correct answer-True

What is a fundamental principle of temporary traffic control?
A. To inconvenience motorists as much as possible so they will find another route.
B. To guide and direct motorists through or around the work area as efficiently as
possible. C. To make traffic move as slow as possible.
D. All of the above are fundamental principles. - correct answer-To guide and direct
motorists through or around the work area as efficiently as possible.

What needs to be done when work is suspended for any length of time?
A. Take down the ROAD WORK AHEAD sign
B. Cover up the END ROAD WORK sign
C. Erect a WORK SUSPENDED sign
D. Cover or remove the FLAGGER AHEAD sign - correct answer-Cover or remove
the FLAGGER AHEAD sign

What are the four zones of a work area?
A. Activity area, pedestrian area, termination area and equipment area.

, B. Advance warning area, transition area, activity area and termination area.
C. Equipment area, termination area, activity area and transition area.
D. Transition area, advanced warning area, pedestrian area and buffer zone. -
correct answer-Advance warning area, transition area, activity area and termination
area.

Which of the following signs might you see in the advanced warning area?
A. END ROAD WORK
B. YIELD
C. EXIT OPEN
D. LEFT LANE CLOSED AHEAD - correct answer-LEFT LANE CLOSED AHEAD

Which of the following is NOT a type of taper?
A. Shifting taper
B. Merging taper
C. Aligning taper
D. Downstream taper - correct answer-Aligning taper

The formula for taper length on expressways with a speed limit of 65mph is which of
the following?

A. L = (WxS2)/60
B. L = WxS
C. L = W2xS
D. L = (S2x60)/W - correct answer-L = WxS

What would the taper length be when closing a 12' lane on an expressway with a
speed limit of 60 mph?
A. 880'
B.780'
C.660'
D. 720' - correct answer-720'

What would the taper length be when closing a 14' lane on a road with a speed limit
of 35 mph?
A. 235.3'
B. 285.8'
C. 288.5'
D. 490.0' - correct answer-285.8'

What would be the taper length when working on a road with 12' lanes and a speed
limit of 55 mph and you were using flagger control of traffic?
A. 660'
B. 780'
C. 605'
D. 100' - correct answer-100'

Regarding temporary traffic control, what is a diversion?

A. Something to do while waiting for an asphalt truck.

Información del documento

Subido en
13 de octubre de 2024
Número de páginas
39
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$13.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Edufiles
4.8
(218)
Vendido
149
Seguidores
10
Artículos
7460
Última venta
1 semana hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes