100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

PJM Exam Review 2 Questions And 100% Correct Answers

Puntuación
-
Vendido
-
Páginas
38
Grado
A+
Subido en
13-10-2024
Escrito en
2024/2025

PJM Exam Review 2 Questions And 100% Correct Answers...

Institución
PJM
Grado
PJM











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PJM
Grado
PJM

Información del documento

Subido en
13 de octubre de 2024
Número de páginas
38
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PJM Exam Review 2 Questions And 100%
Correct Answers

EOP-005-2

NERC Requirements for Critical Black Start



Each GOP with a Blackstart Resource shall notify its TOP of any Real Time changes to
the capabilities of that Blackstart Resources affecting its ability to meet the TOPs
restoration plan within _________ following such change.

24 hours

Minimum Generation Alert is implemented when the expected generation level is within
____ of normal minimum energy limits

2,500 MW



Manual Load Dump

Capacity deficient zone sheds load. If zones are deficient, load shed is proportionally
based on level of shortage.



NERC Energy Emergency Alerts (EEA)

Alerts issued by Reliability Coordinator (RC) to ensure that all RCs understand potential
and actual energy emergencies.



EEA Level 1 (All Available Resources in Use)

Control Area foresees or is experiencing conditions where all available resources are
committed



When does PJM issue an EEA Level 1?

,Maximum Generation Emergency Alert




EEA Level 2 (Load Management Procedures in Effect)

Control Area foresees or has implemented procedures up to but excluding interruption
of firm load commitments



Under What Circumstances Does PJM Declare an EEA Level 2?

Emergency Mandatory Load Management Reductions Action, a Voltage Reduction
Action, or a Deploy All Resources Action (whichever issued first)



EEA Level 3 (Firm Load Interruption Imminent or In Progress)

Control Area foresees or has implemented firm load obligation interruption




When does PJM declare an EEA Level 3?

Manual Load Dump Action



BES

Bulk Electric System



Possible Triggers for Conservative Operations:

Fuel Delivery Issues

Forrest or Brush Fires

Environmental Alerts

Bad Weather

Geomagnetic Disturbances (GMD)

Terrorist or Sabotage threats against the BES

,PJM entering as NERC defines it an "Unknown Operating State"



What are PJMs most important limits?

Interconnection Reliability Operating Limits (IROLs)



PJM Actions during Conservative Operations

Begin additional off-cost operations

Purchase additional reserves

- Can consider a number of contingencies being lost

- Additional security on communications

- Request additional system status reports

- Request members to staff backup centers, critical BES substations, black start
facilities



Member Actions for Conservative Operations:

- Provide additional reporting data

- Staff substations or generating plants

- Comply with PJM operational instructions or dispatch signals



Gas utilities prioritize ____________ during cold weather

heating over electricity generation



RTO Natural Gas Coordination Procedure:

NYISO, ISO-NE, and PJM joint effort to communicate with Gas Suppliers of Interstate
Gas pipelines to manage any potential inadequacy situations.

Data reported within the RTO Natural Gas Coordination Procedure

Interconnection points

Deals of gas supply & transmission

, Gas line maps

Interstate pipeline supplier

Location of units

Supplier list

PJM Actions during Fuel Delivery Emergencies

Weather Watch

Examine and predict gas requirement

ISO Conference calls

Acquire more data from pipelines

Strategy Development

Execute Conservation Operations

**

Member Activities for Fuel Delivery Emergency Events

Provide ancillary information

Notify PJM of gas delivery supply limitations

Comply with operating instructions

***

What fuel type is impacted when OFOs are called?

Natural Gas

***

NOAA

National Oceanic and Atmosphere Administration

***

If NOAA forecasts a geo-magnetic storm potentially at __________ or greater severity,
PJM will notify all market participants through the All-Call system and the Emergency
Procedure Posting Application

K7

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Easton West Virgina University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
501
Miembro desde
2 año
Número de seguidores
221
Documentos
21905
Última venta
6 horas hace

3.9

111 reseñas

5
53
4
21
3
21
2
7
1
9

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes