100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

PJM Transmission Exam Study Questions And Correct Answers

Puntuación
-
Vendido
-
Páginas
31
Grado
A+
Subido en
13-10-2024
Escrito en
2024/2025

PJM Transmission Exam Study Questions And Correct Answers...

Institución
PJM Transmission
Grado
PJM Transmission











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PJM Transmission
Grado
PJM Transmission

Información del documento

Subido en
13 de octubre de 2024
Número de páginas
31
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Vista previa del contenido

PJM Transmission Exam Study Questions And
Correct Answers


What does SCADA stand for? - ANSWER Supervisory Control & Data Acquisition



What is the optimum Frequency Range at System Restoration? - ANSWER 59.75 - 61 Hz



What is the typical bus voltage range for the 500 kV system? - ANSWER 500 to 550 kV



When Tying 2 islands, what does the operator need to match? - ANSWER Voltage, Phase
Angle and Frequency



What is the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) -
ANSWER 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV



Under what circumstances will PJM declare a Minimum Generation Alert? (how many
MW under normal operating limits) - ANSWER When expected generation levels fall
within 2500 MW of normal operating limits



When a thunderstorm is approaching the BES should auto-reclosing be enabled? -
ANSWER Yes




What does IROL stand for? - ANSWER Interconnection Reliability Operating Limit



What does eDART stand for? - ANSWER Dispatcher Application and Reporting Tool

,What is eDART used for? (Electronic Disp Reporting Tool) - ANSWER It is used for:
Generation Outage Scheduling, Instantaneous Reserve Checks, Generator Reactive
Capabilities and to enter and submit switching



What direction do VARS flow? - ANSWER From HIGH Voltage to LOW Voltage



What direction do MW flow? - ANSWER From HIGH Phase Angle to LOW Phase Angle



Which of the following factors are NOT used in forecasting load?



1) Weather Forecast

2) Historical Load Forecast

3) Historical Weather Data

4) Locational Marginal Pricing (LMP) Data - ANSWER 4

What one-way communication system is utilized to broadcast information to local call
centers? - ANSWER All-Call

The 3 categories of messages published by PJM All-Call all EXCEPT:

1) Operational

2) Informational

3) Conflicting Interchange Values

4) Emergency Procedures - ANSWER 3



When should, transmission outages should be submitted to PJM to avoid cancellation
and to be considered "on time?' - ANSWER First day of Month Prior to the Outage



What report will be requested by PJM when a Max Generation Alert is issued? - ANSWER
Supplementary Status Report (SSR)



This would be detected by monitoring: - ANSWER Frequency and PJM Area Control

,Error (ACE)



The PJM system is operated such that the contingency flow is less than the: - ANSWER
Emergency Rating



When ordered a 5% voltage reduction should be taken on: - ANSWER The Distribution
System



TOs must report "Hot Line Work" on what voltage levels? - ANSWER 345 kV and Above



Load dump rating of an EHV line is based upon? - ANSWER 115% of the facility's 4 hour
Emergency Rating



During System Restoration, does the closing of additional tie lines increase the strength
& stability of an interconnected area? - ANSWER Yes



Which of the following are factors that affect load forecast (3)?



1) Weather

2) Temperature

3) Reactive Reserves

4) Day of the week - ANSWER 1, 2, 4



During system restoration, what is the voltage range the system should be kept
between? - ANSWER 90% and 105% maintain voltage profile between for system
restoration



PJM will coordinate and direct all restoration lines of what voltage levels? - ANSWER
500kV and above

, How much load would you dump to increase the frequency by 1 Hz (percentage range)?
- ANSWER 6-10%



Generation is disconnected after 5 seconds, when the frequency: - ANSWER Drops
below 57.5Hz



How much of the total Dynamic Reserve should be used on Under Frequency relay load?
- ANSWER



During System Restoration, capacitor banks should be kept off until how much of the
load is restored? - ANSWER 40%



Would PJM take over Frequency Control when the control of an interconnected area is
too great for any Local Control Center to handle? - ANSWER Yes



Operator receiving an All-Call message should state the following before playback of the
message? - ANSWER Name and Company



Dynamic Reserves consist of: - ANSWER Governor Reserve and Load that has been
restored with under frequency relays



What would be the appropriate response to receiving a DC ground Alarm? - ANSWER
Inform substation personnel of the alarm if during normal hours



An islanded system serves 3000 MW load. How much MW should be shed if you wanted
to raise the frequency by 1 Hz? - ANSWER 180 MW



Which of the following activities would be performed FIRST to control a reactive transfer
limit violation?



a) Put reactors in service

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Easton West Virgina University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
501
Miembro desde
2 año
Número de seguidores
221
Documentos
21905
Última venta
6 horas hace

3.9

111 reseñas

5
53
4
21
3
21
2
7
1
9

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes