API 570 Closed Book Exam Tested Questions With Revised Correct Detailed Answers Guarantee Pass 1) When preparing to inspect a piping system inspection personnel should? - ANSWER Briefly review the history of the individual piping system before any of the inspections required by API 570. API 570 5.3.5 2) As regards dead legs in piping circuits, what is recommended to be done by API 570 whenever possible? - ANSWER Consideration should be given to removing dead legs that serve no further purpose. API 570 5.3.2 3) When is it necessary to reevaluate the frequency of inspection for an existing piping system? - ANSWER The inspection interval must be reviewed and adjusted as necessary after each inspection or significant change in operating conditions. API 570 6.3 4) What is the 4th consideration when selecting TML's? - ANSWER at intermediate locations along the longer straight piping within the injection point circuit may be required. API 570 5.3.1 TML's 5) When the inspector suspects or is advised that specific circuits may be susceptible to environmental cracking; the inspector should schedule supplemental inspections. What types of inspections may this include? - ANSWER Radiography, Wet Fluorescent Magnetic Particle, and/or Ultrasonic Examinations. API 570 5.3.7 6) Supplemental inspection for piping systems is sometimes required. Which of the following may be considered supplements to normal inspection techniques? - ANSWER Periodic use of Radiography and/or Thermography to check for fouling or internal plugging. 7) To what inspection requirements must be applied to small bore class 1 secondary piping? - ANSWER Class 1 secondary SBP shall be inspected to the same requirements as primary process piping. API 570 6.6.1 8) When is API 570 inspection code not permitted to be applied to a piping system? - ANSWER As a substitute for the original construction requirements or if in conflict with regulatory requirements. API 570 1.1.3

Mostrar más Leer menos
Institución
API 570
Grado
API 570











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
API 570
Grado
API 570

Información del documento

Subido en
11 de octubre de 2024
Número de páginas
45
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

  • api 570

Vista previa del contenido

API 570 Closed Book Exam
Tested Questions With Revised
Correct Detailed Answers
Guarantee Pass

1) When preparing to inspect a piping system inspection personnel should? -
ANSWER Briefly review the history of the individual piping system
before any of the inspections required by API 570. API 570 5.3.5


2) As regards dead legs in piping circuits, what is recommended to be done by
API 570 whenever possible? - ANSWER Consideration should be given
to removing dead legs that serve no further purpose. API 570 5.3.2


3) When is it necessary to reevaluate the frequency of inspection for an
existing piping system? - ANSWER The inspection interval must be
reviewed and adjusted as necessary after each inspection or significant
change in operating conditions. API 570 6.3


4) What is the 4th consideration when selecting TML's? - ANSWER TML's
at intermediate locations along the longer straight piping within the
injection point circuit may be required. API 570 5.3.1


5) When the inspector suspects or is advised that specific circuits may be
susceptible to environmental cracking; the inspector should schedule
supplemental inspections. What types of inspections may this include? -

, ANSWER Radiography, Wet Fluorescent Magnetic Particle, and/or
Ultrasonic Examinations. API 570 5.3.7


6) Supplemental inspection for piping systems is sometimes required. Which
of the following may be considered supplements to normal inspection
techniques? - ANSWER Periodic use of Radiography and/or
Thermography to check for fouling or internal plugging.


7) To what inspection requirements must be applied to small bore class 1
secondary piping? - ANSWER Class 1 secondary SBP shall be inspected
to the same requirements as primary process piping. API 570 6.6.1


8) When is API 570 inspection code not permitted to be applied to a piping
system? - ANSWER As a substitute for the original construction
requirements or if in conflict with regulatory requirements. API 570 1.1.3


9) Which of the following service fluids will justify rating a piping system class
2? - ANSWER Hydrogen, Fuel Gas, and Natural Gas. API 570 6.2.2


10) Prior to hydrostatic tesing of piping system containing expansion joints
it is determined that the expansion joint will be damaged and cannot be
isolated. What can be done per API 570? - ANSWER Lines containing
expansion joints may be tested at a reduced pressure. API 570 5


11) Corrosion products have built up around a piping system's supports, what
additional inspection work may be called for? - ANSWER Lifting the pipe off of
such supports may be required for inspection. API 570 5.4.3

,12) Inspection for piping weld quality is normally accomplished as a part of the
requirements for new construction, repairs, or alterations. However, welds are
often inspected for corrosion as part of a radiographic profile inspection or as part
of internal inspection. When preferential corrosion in noted what is the
appropriate action? - ANSWER Additional welds in the same circuit or system
should be examined for corrosion. API 570 5.10


13) After an external visual CUI inspection on a class 1 system found to have
insulation damage, the follow up examinations should include NDE testing and
insulation removal of; - ANSWER At least 75% of all damaged areas. API 570
6.4 Table 6-2
The selection of TML's within injection point circuits are established at (4) basic
locations, (3) of which are: 1-TML's on appropriate fittings within the injection
circuit. 2-TML's on the pipe wall at the location of expected pipe wall
impingement of injected fluid. 3-Establish TML's at both the upstream and
downstream limits of the injection point circuit.

14) What is the 4th consideration when selecting TML's? - ANSWER TML's at
intermediate locations along the longer straight piping within the injection point
circuit may be required. API 570 5.3.1


15) The following can be said about inspection of refractory linings used in piping
systems; system. API 570 5.3.8 - ANSWER it is usually not necessary to
remove them for inspection of the piping


What physical sign does not indicate leakage in buried piping? - ANSWER
Corrosion on the 1st flange above the ground. API 570 9.1.1


The inspector shall approve all repair and alteration work at the designated hold
points and after the repairs and alterations have been satisfactorily completed in
accordance with the requirements of; - ANSWER API 570. API 570 8.1.2

, A close- interval potential survey on a cathode protected line may be used to
verify that the buried piping; - ANSWER has good insulation from the
surrounding earth and a protective potential throughout it length. API 570 9.2.2


What are the requirements of materials to be used in the welded repair of a
piping system? - ANSWER The materials used in making repairs or alterations
shall be of known weldable quality, shall conform to the applicable code, and shall
be compatible with the original material. API 570 8.2.4


When performing welding on piping systems constructed to ASME B31.3, What
must always be in place prior to welding? - ANSWER Qualified welding
procedures, welders may be tested on production welds in many cases. B31.3
328.2.1


In some instances preheating to 300°F may be substituted for PWHT after
welding P No. 1 materials, for which P No. 3 materials this is not allowed? -
ANSWER Materials classified as Mn-Mo. API 570 8.2.2.1


A welder makes a performance test using a pipe coupon that has an O.D. of
2.375". What range of outside diameters is he qualified to weld in production? -
ANSWER 1" to unlimited diameter. IX QW-452.3


A welders performance test was made in the 3G position. Which of the following
describes his test? - ANSWER Vertical groove weld in plate. IX QW-461.3
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Thumbnail
Package deal
API 570 ALL SETS
-
11 2024
$ 149.64 Más información

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NURSINGDICTIONARY Chamberlain College Of Nursing
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
239
Miembro desde
2 año
Número de seguidores
87
Documentos
2511
Última venta
2 días hace
NURSING ENCYCLOPEDIA

Our mission is to bring students and learners together and help you to get through your studies, courses and exams. Providing Well Revised Expert Information.

4.1

27 reseñas

5
14
4
5
3
6
2
1
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes