100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Lean Bronze Certification Exam Questions with 100% Verified Correct Answers 2024/2025

Puntuación
-
Vendido
-
Páginas
26
Grado
A+
Subido en
05-10-2024
Escrito en
2024/2025

Lean Bronze Certification Exam Questions with 100% Verified Correct Answers 2024/2025 The concept of the downstream process going to the upstream process to pick up product is called: a. Just in time b. Push system c. Pull system d. visual factory - Correct Answer C. Pull System A multi-step manufacturing process' capacity is limited by one if its workstations. To increase the process' capacity, the factory must: a. Increase the capacity of the constraining workstation b. Increase production starts (work put into the first operation) c. Decrease the utilization of all workstations in the process d. Decrease the utilization of the constraining workstation - Correct Answer a. Increase the capacity of the constraining workstation The optimal number of workers may be determined by: a. Standard cost data b. Line balancing c. Labor and Overhead d. Industry standard - Correct Answer b. Line Balancing Production standards in a lean system should be established by: a. Scheduling managers b. process engineers c. efficiency experts d. Production workers - Correct Answer d. Production workers The greatest contribution of the 5- why analytical tool is that it helps the lean practitioner to identify

Mostrar más Leer menos
Institución
Lean Bronze Certification
Grado
Lean Bronze Certification










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Lean Bronze Certification
Grado
Lean Bronze Certification

Información del documento

Subido en
5 de octubre de 2024
Número de páginas
26
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Lean Bronze Certification Exam Questions
with 100% Verified Correct Answers
2024/2025
The concept of the downstream process going to the upstream process to pick up product is called:

a. Just in time

b. Push system

c. Pull system

d. visual factory - Correct Answer C. Pull System



A multi-step manufacturing process' capacity is limited by one if its workstations. To increase the
process' capacity, the factory must:

a. Increase the capacity of the constraining workstation

b. Increase production starts (work put into the first operation)

c. Decrease the utilization of all workstations in the process

d. Decrease the utilization of the constraining workstation - Correct Answer a. Increase the capacity
of the constraining workstation



The optimal number of workers may be determined by:

a. Standard cost data

b. Line balancing

c. Labor and Overhead

d. Industry standard - Correct Answer b. Line Balancing



Production standards in a lean system should be established by:

a. Scheduling managers

b. process engineers

c. efficiency experts

d. Production workers - Correct Answer d. Production workers



The greatest contribution of the 5- why analytical tool is that it helps the lean practitioner to identify
the:

,a. solution to the problem

b. root cause of the problem

c. number of occurrences of the problem

d. person who caused the problem - Correct Answer b. root cause of the problem



To identify waste in a selected production line, the first step is to:

a. Perform 5-S activities to organize the line

b. create a current state value stream map

c. determines the specific material that runs in the line

d. perform a time and motion study - Correct Answer b. create a current state value stream map



Which of the following is considered value-added work?

a. Eliminating all defects and the need for rework

b. Empowering employees to establish their own work standards

c. Changing the shape or character of a product or assembly

d. activities that must be performed under present work conditions - Correct Answer c. Changing the
shape or character of a product or assembly



The basis of the Toyota Production System is:

a. the monitoring of time vs. order and delivery

b. Five S, 5 Why's and the 7 wastes

c. the complete elimination of waste

d. standardized work and visual factory - Correct Answer c. the complete elimination of waste



The ultimate goal of lean is the total elimination of:

a. downtime

b. overtime

c. Waste

d. Errors - Correct Answer c. Waste



The worst waste of all, because it opens the door for other kinds of waste is:

, a. Transport

b. Overprocessing

c. Overproduction

d. motion - Correct Answer c. Overproduction (Mother of all wastes)



A Value Stream Map is a tool to:

a. Help you identify which workers are poor performers

b. Enable managers to better understand their backlog

c. Assist you in identifying and eliminating all forms of waste

d. Assist managers to better understand their on-time delivery - Correct Answer c. Assist you in
identifying and eliminating all forms of waste



In a 5S program, the purpose of red tagging is to:

a. provide visual management of WIP

b. Identify broken equipment for repair

c. Highlight processes for continuous improvement

d. Identify material for potential removal - Correct Answer d. Identify material for potential removal



In a process with a Takt time of 3 minutes and a pack out qty of 35 parts, the Pitch is:

a. 35 minutes

b. 90 minutes

c. 105 minutes

d. 11.66 minutes - Correct Answer c. 105 minutes (Pitch formula; Pitch = takt time x pack out qty) (3x
35= 105)



For a production facility working five days per week (one 8-hour shift with 3 Ten-minute breaks), the
customer demand is 2700 units per week. What is the Takt time this facility should produce to?

a. one unit every 54 seconds

b. one unit every 10 seconds

c. one unit every 50 seconds

d. one unit every 57 seconds - Correct Answer c. one unit every 50 seconds

Takt time = available working time (AWT) / customer demand (CD)

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Winfred West Virgina University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
756
Miembro desde
3 año
Número de seguidores
473
Documentos
7353
Última venta
5 días hace
StudySmart

Revising without a good structure can be so frustrating but with StudySmart you are able to get revision questions, summary notes and exams to help you pass with flying colors

3.9

158 reseñas

5
78
4
28
3
27
2
8
1
17

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes