International Mechanical Code (2021 IMC)
Questions and Correct Answers | Latest
Update
The provisions of this code shall not be mandatory for existing buildings or structures
identified and classified by the state or local jurisdiction as __________ buildings.
historic
(Section 102.6 Historic Buildings)
The liquid that condenses from a gas (including flue gas) caused by a reduction in
temperature.
condensate
(Section 202 General definitions)
Where there is a conflict between a general requirement and a specific require, the
__________ requirement shall govern.
Specific
(102.1 General)
~ 1 ~ for inquiry mail me @
, Best Grades | Must Pass | Latest Update | Correct Answers | 2024/ 2025
Where conflicts occur between provisions of the IMC and the referenced standards, the
provisions of __________ __________ shall apply.
the code
(the IMC, Section 102.8.1 Conflicts)
When authorized employees enforce this code they shall not be held _________, when acting
in good faith and without malice.
liable
(Section 104.8 Liability)
The code official shall have the authority to render __________ of the IMC.
interpretations
(Section 104.1)
~ 1 ~ for inquiry mail me @
, Best Grades | Must Pass | Latest Update | Correct Answers | 2024/ 2025
Where the code official finds that a proposed alternative material does not comply with the
intent of the code provisions, the code official shall respond __________ __________, stating
the __________ __________ it was not approved.
in writing
reasons why
(Section 105.2 Alternative materials, design and methods of construction and equipment)
Permits shall expire and become null and void if the work authorized is not commenced within
__________ days of issuance.
180
(Section 106.4.3 Expiration)
How many extensions of an unexpired permit is the code official authorized to grant if
reasonable cause is demonstrated?
One
(Section 106.4.4 Extensions)
~ 1 ~ for inquiry mail me @
, Best Grades | Must Pass | Latest Update | Correct Answers | 2024/ 2025
underground inspections shall be made after trenches or ditches are excavated and bedded,
piping installed, and _________ backfill is put in place
before
(Section 108.2 Required inspections and testing, Item 1)
Rough-in inspection shall be made after the roof, framing, fireblocking and bracing are in
place and all ducting and other components to be concealed are complete, and __________
to the installation of wall or ceiling membranes.
prior
(Section 108.2 Required inspections and testing, Item 2)
Final inspection shall be made upon _________ of the mechanical system.
completion
(Section 108.2 Required inspections and testing, Item 3)
Each day a code violation continues after due notice has been served shall be deemed a
__________ offense