Equipment Maintenance and Inspection Worksheet Correct Ans-DA Form 5988-E ("Echo")
and DA Form 2404
DA Form 5988-E ("Echo") and DA Form 2404 Correct Ans-Equipment Maintenance and
Inspection Worksheet
DA Form 2404 is a what form of the DA Form 5988-E Correct Ans-Manual Version
Fault Status Symbol:
Diagonal Lines Correct Ans-shows fault(s) with equipment.
Fault Status Symbol:
X (cross) Correct Ans-shows fault or equipment condition that is a Deficiency. ("Deadline")
Fault Status Symbol:
Circled X Correct Ans-Equipment has a Deficiency, may be operated. must be authorized by
The COMMANDER.
, 88M Module A Study Notes- Questions and Answers
DA Form 5987-E ("Echo") Correct Ans-Motor Equipment Dispatch
What does PMCS stand for? Correct Ans-Preventive Maintenance Check and Services
What are the Technical Manual (TM) Numbering System? (e.i. 9-2320-392-10) Correct Ans-
9: indicates ordnance material
2320: Federal supply classification
392: model of vehicle
10: echelon level of maintenance
What are the 5 PMCS intervals Correct Ans-Before
During
After
Weekly
Mothly
What is the Most important PMCS interval and why? Correct Ans-After. It prepares the
vehicle for the next mission.
The first step in performing general maintenance is to conduct a ______________ . Correct
Ans-360 - degree walk around