100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

GFEBS Master Data Plant Maintenance Process Overview Post Test Study Guide

Puntuación
-
Vendido
-
Páginas
3
Grado
A+
Subido en
25-09-2024
Escrito en
2024/2025

GFEBS Master Data Plant Maintenance Process Overview Post Test Study Guide Maintenance Plan Costing is based on all aspects required to perform the preventive maintenance task as outline in the PM plan. - Correct Answer️️ -TRUE The Project Structure Controller and Project Planned WBS Cost Controller are involved in the Re-Prioritize IJO Project List step of the Annual Work Plan. - Correct Answer️️ - TRUE Operations Work Orders are used to execute Preventive maintenance plans. - Correct Answer️️ -FALSE After the demand maintenance work is completed, the Order Maintainer sets the work order to technically complete (TECO), automatically settling any cost posted to the order, and finally sets the order to “Business closed.” - Correct Answer️️ -TRUE Methods of Physical Inventory count include: continuous inventory, cycle counting, and random checking. - Correct Answer️️ -FALSE Preventive and Demand Work Orders rely on correct WBS numbers in order to get funding so that work can be accomplished. - Correct Answer️️ -TRUE

Mostrar más Leer menos
Institución
GFEBS
Grado
GFEBS








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
GFEBS
Grado
GFEBS

Información del documento

Subido en
25 de septiembre de 2024
Número de páginas
3
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

TITLE: EMILLYCHARLOTTE 2024/2025 ACADEMIC PERIOD
OWNER: EMILLYCHARLOTTE
COPYRIGHT STATEMENT: ©2024 EMILLYCHARLOTTE. ALL RIGHTS
RESERVED
FIRST PUBLISHED: SEPTEMBER 2024

GFEBS Master Data Plant Maintenance
Process Overview Post Test Study Guide


Maintenance Plan Costing is based on all aspects required to perform the preventive

maintenance task as outline in the PM plan. - Correct Answer✔️✔️-TRUE


The Project Structure Controller and Project Planned WBS Cost Controller are involved

in the Re-Prioritize IJO Project List step of the Annual Work Plan. - Correct Answer✔️✔️-

TRUE

Operations Work Orders are used to execute Preventive maintenance plans. - Correct

Answer✔️✔️-FALSE

After the demand maintenance work is completed, the Order Maintainer sets the work

order to technically complete (TECO), automatically settling any cost posted to the

order, and finally sets the order to “Business closed.” - Correct

Answer✔️✔️-TRUE

Methods of Physical Inventory count include: continuous inventory, cycle counting, and

random checking. - Correct Answer✔️✔️-FALSE

Preventive and Demand Work Orders rely on correct WBS numbers in order to get

funding so that work can be accomplished. - Correct Answer✔️✔️-TRUE


1/3
$8.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
EmillyCharlotte Howard Community College
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
98
Miembro desde
1 año
Número de seguidores
5
Documentos
11948
Última venta
1 semana hace
ALL-MAJOR.

On this page, you find all documents, package deals, and flashcards offered by seller Emilly Charlotte.

3.5

21 reseñas

5
7
4
6
3
2
2
3
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes