• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Examen

Mobile Crane Questions Test #2

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

Mobile Crane Questions Test #2

Vista previa del contenido

Mobile Crane Questions Test #2



When making a multiple crane lift it is important for the operator to understand that: - CORRECT
ANSWER : The weight may increase if the other crane lands the load.


If a crane is not set-up level and the operator swings a load from the high side, the load radius will: -
CORRECT ANSWER : Increase.


Most crane manufacturers reduce load capacity for duty-cycle operations because: - CORRECT
ANSWER : Side-loading forces may occur.


On whose recommendations should preventative maintenance program be set-up: - CORRECT
ANSWER : C rane manufacturer.


What is the standard rope used on most cranes? - CORRECT ANSWER : Right regular lay.



The proper way to calibrate a boom angle indicator is: - CORRECT ANSWER : Using a level, raise the
boom horizontal and set the indicator at 0º.



The red area of a instrument gauge means: - CORRECT ANSWER : A dangerous condition exists.



The best way to keep people from being injured from the counterweight of

crane is to: - CORRECT ANSWER : Fence or barricade the tail swing area of the crane.



Only approved attachments or extra counterweights made by the manufacturer should be placed on the
rear of the crane because: - CORRECT ANSWER : They could cause a backward stability problem.



What is the first thing an operator should do before going under a low pipe rack? - CORRECT ANSWER
: Post a signal person to check clearance.

, When working on outriggers, the only time they should be less than fully extended is when: - CORRECT
ANSWER : There is a load chart for this operation.


When lifting loads from the water, the operator should be aware that: - CORRECT ANSWER : The load
will increase when you pick the load from the water.



What is required to be on a hydraulic crane in order for it to lift a manbasket? - CORRECT ANSWER :
Boom length indicator.



When working on rubber, cranes are rated at what percentage of tipping? - CORRECT ANSWER : 75%



When using cable or nylon spreaders it is important to remember: - CORRECT ANSWER : The lower the
spreader angle to the horizontal, the greater the tension.



Backward stability of a crane is tested with: - CORRECT ANSWER : Basic boom at maximum angle with
no load.



If not listed in the load/capacity charts for the hydraulic crane and you are in between boom lengths, you
should:: - CORRECT ANSWER : Use the next longer or shorter length (the lower capacity).



When spinning the load presents a danger, the operator should: - CORRECT ANSWER : Use a tagline.



The jib capacity is 8 tons and the ball weight 900 lbs. What is the heaviest net load that can be lifted
safely? - CORRECT ANSWER : 15,100.



Parts of line means: - CORRECT ANSWER : The number of lines running through the load block.



If a jib is erected but not being used, it is treated as a deduction from the cranes: - CORRECT ANSWER :
Gross capacity.

Información del documento

Subido en
24 de septiembre de 2024
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Desconocido
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
tutorlorghon
4.7
(261)
Vendido
836
Seguidores
21
Artículos
8895
Última venta
2 días hace




Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes