All of the following must follow OSHA standards except ___
A-religious establishments
B-general contractor with one employee
C-landscape contractors
D-equipment rental business - answerA-religious establishments
The minimum number of employees that will require a contractor to obtain workers
compensation insurance is ____ employees
A- one
B- three
C- four
D- Ten - answerA - one
The type of Bond That guarantees that the contractor will preform the work in
accordance with the contract is known as a ___ bond
A-bid
B-payment
C-performance
D-stipulated - answerC- performance
A short-term project schedule is a detailed explanation of the next two weeks of
construction activities and should be developed and/or reviewed by all of the following
except ___
A-superintendent
B-architect
C-subcontractors
D-project engineer - answerB- architect
The ___ usually prepared the project schedule
A-architect
B-owner
C-project Manager
D-engineer - answerC- project manger
, In order to provide adequate control, the project schedule should be formally reviews
and updated
A-at the project commencement
B-at least once every 30 days
C- at least once every 6 months
D- at the project closeout - answerB-Atleast every 30 days
A contract will not be enforced if it is
A- oral
B- illegal
C- no work is accomplished for 90 days
D- all of the above - answerB- illegal
According to the statue of frauds, a contract need not be in writing and still be
enforceable in Florida if less than ___ and ___
A-$500 in value and less than 2 years in length
B-$1000 in value and less than 1 year in length
C-$2500 in value and less than 1 year in length
D-$500 in value and less than 1 year in length - answerD-$500 I'm value and less than
1 year in length
The ____ has the duty to record and post a notice of commencement to improve real
property
A-owner
B-agent
C-contractor
D-any of the above - answerA-owner
A subcontractor started work in his co tract with the general contractor on aug. 1 2021.
The owner made the final payment to the general contractor on sep 13 2021. The latest
fat the sub contractor can serve notice to owner to preserve his claim under the
construction kein law is _______ 2021
A- sep 16
B- sep 15
C- sep 13
D- sep 12 - answerD- sep 12
Page: 9-21
and Answers - 1
All of the following must follow OSHA standards except ___
A-religious establishments
B-general contractor with one employee
C-landscape contractors
D-equipment rental business - answerA-religious establishments
The minimum number of employees that will require a contractor to obtain workers
compensation insurance is ____ employees
A- one
B- three
C- four
D- Ten - answerA - one
The type of Bond That guarantees that the contractor will preform the work in
accordance with the contract is known as a ___ bond
A-bid
B-payment
C-performance
D-stipulated - answerC- performance
A short-term project schedule is a detailed explanation of the next two weeks of
construction activities and should be developed and/or reviewed by all of the following
except ___
A-superintendent
B-architect
C-subcontractors
D-project engineer - answerB- architect
The ___ usually prepared the project schedule
A-architect
B-owner
C-project Manager
D-engineer - answerC- project manger
, In order to provide adequate control, the project schedule should be formally reviews
and updated
A-at the project commencement
B-at least once every 30 days
C- at least once every 6 months
D- at the project closeout - answerB-Atleast every 30 days
A contract will not be enforced if it is
A- oral
B- illegal
C- no work is accomplished for 90 days
D- all of the above - answerB- illegal
According to the statue of frauds, a contract need not be in writing and still be
enforceable in Florida if less than ___ and ___
A-$500 in value and less than 2 years in length
B-$1000 in value and less than 1 year in length
C-$2500 in value and less than 1 year in length
D-$500 in value and less than 1 year in length - answerD-$500 I'm value and less than
1 year in length
The ____ has the duty to record and post a notice of commencement to improve real
property
A-owner
B-agent
C-contractor
D-any of the above - answerA-owner
A subcontractor started work in his co tract with the general contractor on aug. 1 2021.
The owner made the final payment to the general contractor on sep 13 2021. The latest
fat the sub contractor can serve notice to owner to preserve his claim under the
construction kein law is _______ 2021
A- sep 16
B- sep 15
C- sep 13
D- sep 12 - answerD- sep 12