SCMA 331 FINAL CH 13 UPDATED Exam Questions and CORRECT Answers Plans for new product development generally fall within the scope of aggregate planning. - CORRECT ANSWER- False The aggregate planning process usually includes dispatching of individual jobs. - CORRECT ANSWER- False Frito-Lay uses aggregate planning to match capacity with demand because of the ________ associated with its specialized processes. A) high variable cost and high fixed cost B) high variable cost and low fixed cost C) low variable cost and high fixed cost D) low variable cost and low fixed cost E) none of the above - CORRECT ANSWER- C

Mostrar más Leer menos
Institución
SCMA 331
Grado
SCMA 331










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
SCMA 331
Grado
SCMA 331

Información del documento

Subido en
15 de septiembre de 2024
Número de páginas
20
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Vista previa del contenido

SCMA 331 FINAL CH 13 UPDATED Exam
Questions and CORRECT Answers
Plans for new product development generally fall within the scope of aggregate planning. -
CORRECT ANSWER- ✔✔False


The aggregate planning process usually includes dispatching of individual jobs. - CORRECT
ANSWER- ✔✔False


Frito-Lay uses aggregate planning to match capacity with demand because of the ________
associated with its specialized processes.
A) high variable cost and high fixed cost
B) high variable cost and low fixed cost
C) low variable cost and high fixed cost
D) low variable cost and low fixed cost

E) none of the above - CORRECT ANSWER- ✔✔C


Under which of the following do planning tasks associated with job assignments, ordering,
job scheduling, and dispatching typically fall?
A) short-range plans
B) intermediate-range plans
C) long-range plans
D) mission-related planning

E) strategic planning - CORRECT ANSWER- ✔✔A


Under which of the following do planning tasks associated with production planning and
budgeting, as well as setting employment, inventory, and subcontracting levels, typically fall?
A) short-range plans
B) intermediate-range plans
C) long-range plans
D) demand options

E) strategic planning - CORRECT ANSWER- ✔✔B

,Top executives tend to focus their attention on which type of forecasts?
A) short-range
B) intermediate-range
C) long-range
D) weather

E) the forecast for the next day's absentee levels - CORRECT ANSWER- ✔✔C


Which of the following would most likely fall under the scope of only an operations
manager?
A) research and development
B) new product plans
C) capital investments
D) facility location/capacity

E) setting inventory levels - CORRECT ANSWER- ✔✔E


Aggregate planning occurs over the medium or intermediate future of 3 to 18 months. -
CORRECT ANSWER- ✔✔True


Aggregate planning in manufacturing ties organizational strategic goals to a production plan.
- CORRECT ANSWER- ✔✔True


One of the four things needed for aggregate planning is a logical overall unit for measuring
sales and output. - CORRECT ANSWER- ✔✔True


What is the typical time horizon for aggregate planning?
A) less than a month
B) up to 3 months
C) 3 to 18 months
D) over one year

E) over 5 years - CORRECT ANSWER- ✔✔C

, Which of the following is the term used for intermediate-range capacity planning with a time
horizon of three to eighteen months?
A) material requirements planning
B) enterprise resource planning
C) strategic planning
D) aggregate planning

E) job scheduling - CORRECT ANSWER- ✔✔D


Which of the following is NOT one of the four things needed for aggregate planning?
A) a logical overall unit for measuring sales and output
B) a method to determine the relevant costs
C) a mathematical model that will minimize costs over the intermediate planning period
D) an aggregate demand forecast for an intermediate planning period

E) All of these are needed for aggregate planning. - CORRECT ANSWER- ✔✔C


What is the effort to plan the coordination of demand forecasts with functional areas of the
firm and its supply chain?
A) enterprise resource planning
B) material requirements planning
C) capacity planning
D) sales and operations planning

E) new product development - CORRECT ANSWER- ✔✔D


Which of the following is NOT an input to S&OP?
A) capacity decisions
B) supply-chain support
C) workforce
D) inventory on hand

E) master production schedule - CORRECT ANSWER- ✔✔E

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
MGRADES Stanford University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1099
Miembro desde
1 año
Número de seguidores
102
Documentos
68972
Última venta
5 horas hace
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

176 reseñas

5
75
4
31
3
47
2
8
1
15

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes