Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 1 fuera de 4 páginas
Examen

Construction Jobsite Management 4th Edition By William R. Mincks; Hal Johnston Solutions Manual

Document preview thumbnail
Vista previa 1 fuera de 4 páginas

Construction Jobsite Management 4th Edition By William R. Mincks; Hal Johnston Solutions Manual

Vista previa del contenido

Construction Jobsite Management 4th Edition By
William R. Mincks; Hal Johnston Solutions Manual

Which of the following is like a receipt that is given to the owner telling him that
everything regarding the financial aspect of the project has been settled ? - ANSWER:
affidavit of payment

Consent of surety is executed by : - ANSWER: the bonding company

Which type of drawing is completed by the manufacturer or a representative of the
manufacturer - ANSWER: Shop

The term for showing how quickly aspects of the project are being completed by
laborers is called - ANSWER: labor productivity

A(n) _____ will show the important information regarding each chemical on the
project site and is required by osha to be available - ANSWER: Material Safety Data
Sheet (MSDS)

Most contracts required the contractor to prepare record drawings or "as-built"
drawings during the project. This process entails recording ___,____&___ - ANSWER:
actual dimensions, location of utilities and changes in drawings

The main purposes of using a subcontractor - ANSWER: specialized labor for
particular construction task , lower cost for subcontract work and reduced risk for
the contractor

A list of all the cost associated within each aspect of the project and how the
progress payments are figured is an - ANSWER: Schedule of Values

A(n) will track progression of where delays are - ANSWER: submittal log

The supplementary conditions to the contract are additional provisions or
modifications to: - ANSWER: The General Conditions of the contract

When there is an issue that involves claims over____, arbitration is used - ANSWER:
1,000,000

A describe action that leads to accomplishing the project which usually includes
completing the project within the scope of time identified in the contract and within
the budget is a(n) - ANSWER: objective

Submittal of ____,_____ and _____ in a complete and timely fashion is essential for
the smooth execution of the construction contract. - ANSWER: product data, shop
drawings and samples

Libro relacionado
 image
William Mincks, Hal Johnston Construction Jobsite Management
Edición: 2016 ISBN: 9781305081796 Edición: Desconocido

Información del documento

Subido en
14 de septiembre de 2024
Número de páginas
4
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
3
Seguidores
0
Artículos
1282
Última venta
10 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes