• ¿Documento equivocado? Cámbialo gratis
  • Escrito por estudiantes que aprobaron
  • Inmediatamente disponible después del pago
  • Leer en línea o como PDF
Vender
¿Dónde estudias?
Tu idioma
Document preview thumbnail
Vista previa 2 fuera de 8 páginas
Examen

CSST Study Guide with complete solutions

Document preview thumbnail
Vista previa 2 fuera de 8 páginas

CSST Study Guide with complete solutions

Vista previa del contenido

CSST Study Guide with complete
solutions

Aggressive-method - Answer -means removal or disturbance of building material by
sanding, abrading, grinding or other method that breaks, crumbles, or disintegrates
intact ACM

Amended water - Answer -means water to which surfactant (wetting agent) has been
added to increase the ability of liquid to penetrate ACM

Abestos Containing Material (ACM) EPA - Answer -means any material more than one
percent asbestos

Assistant Secretary - Answer -means the assistant secretary of labor for occupational
safety and health, US Department of labor, or designee

Authorized Person - Answer -means any person authorized by the employer and
required by work duties to be present in regulated areas

Building/facility owner - Answer -is the legal entity, including a lessee, which exercises
control over management and record keeping functions relating to a building and facility
in which activities covered by this standard take place

Certified Industrial Hygienist (CIH) - Answer -means one certified in the practice of
industrial hygiene by the American Board of Industrial Hygiene

Chief - Answer -means the chief of Division of Occupational Safety and Health, P.O.
Box 420603, San Francisco, CA 94142

Class I asbestos work - Answer -means activities involving the removal of TSI and
surfacing ACM and PACM

Class II asbestos work - Answer -means activities involving the removal of ACM which
IS NOT thermal system insulation or surfacing material. This includes, but is not limited
to, the removal of asbestos containing wallboard, floor tile and sheeting, roofing and
siding singles, and construction mastics

, Class III asbestos work - Answer -means REPAIR AND MAINTENANCE operations
where "ACM", including TSI and surfacing ACM & PACM, is likely to be disturbed

Class IV asbestos work - Answer -means maintenance and CUSTODIAL ACTIVITIES
during which employees contact but do not disturb ACM or PACM and activities to clean
up dust, waste, & debris resulting from Class I,II,III activities

Clean Room - Answer -means an uncontaminated room having favilities for the storage
of employees' street clothing & uncontaminated materials & equipment

Closely Resemble - Answer -means that the major workplace conditions which have
contributed to the levels of historic asbestos exposure, are no more protective than
conditions of the current workplace

Competent Person - Answer -means in addition to one who is capable of identifying
existing & predictable hazards in the surroundings or working conditions which are
unsanitary, hazardous, or dangerous to employees, and who has authorization to take
prompt corrective measures to eliminate them, one who is capable of identifying existing
asbestos hazards in the workplace and selecting the appropriate control strategy for
asbestos exposure, who has the authority to take prompt corrective measures to
eliminate them: in addition, for Class I and Class II (40 CFR part 763) for supervisor, or
its equivalent and, for Class III and Class IV work, who is trained in a manner consistent
with EPA requirements for training of local education agency maintenance and custodial
staff as set forth at 40 CFR 763.92(a)(2). Note: For operations involving more than 100
square feet of construction material as defined in subsection (r) of this section the
competent person may fulfill the requirement contained in Section 341.9 to specify a
certified supervisor for asbestos related work

Critical Barrier - Answer -means one or more layer of plastic sealed over all opening into
a work area or any other similarly placed physical barrier sufficient to prevent airborne
asbestos in a work area from migrating to an adjacent area

Decontamination area - Answer -means an enclosed area adjacent and connected to
the regulated area and consisting of an equipment room, shower area, and clean room,
which is used for the decontamination of workers, materials, and equipment that are
contaminated with asbestos.

Demolition - Answer -means the wrecking or taking out of any load- supporting
structural member and any related razing, removing, or stripping of asbestos products

Director - Answer -means the director, National Institute for Occupational Safety and
Health, US Department of Health and Human Services, or designee

Disturbance - Answer -means activities that disrupt the matrix of ACM or PACM,
crumble or pulverize ACM or PACM, or generate visible debris from ACM or PACM.
Disturbance includes cutting away small amounts of ACM and PACM, no greater than

Información del documento

Subido en
12 de septiembre de 2024
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
mereka
3.8
(92)
Vendido
479
Seguidores
216
Artículos
9436
Última venta
1 mes hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes